| Agency: | St. Charles County |
|---|---|
| State: | Missouri |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Mar 9, 2026 |
| Due Date: | Mar 25, 2026 |
| Solicitation No: | 26-058 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Bid Number: |
26-058
|
| Bid Title: |
26-058 Foundation Repair
|
| Category: | SCCMO Maintenance Repair Operations |
| Status: | Open |
|
LEGAL NOTICE
INVITATION FOR FORMAL BID
IFB 26-058
For
Foundation Repairs
For
ST. CHARLES COUNTY GOVERNMENT
ST. CHARLES, MISSOURI
St. Charles County is seeking bids for the Criminal Justice Center Foundation Repairs. The
vendor must guarantee the quoted prices for a period of Ninety (90) days.
BID INSTRUCTIONS
One [1] signed original and one [1] signed copy of the bid must be received in a sealed envelope
plainly marked "26-058 Foundation Repairs" with the date and time of the bid opening in the
lower left corner of the envelope.
An authorized representative of the company/person submitting the bid must sign the bid, in
blue ink.
Bids must be submitted to the St. Charles County Finance Department, 201 North Second
Street Room 541 St. Charles MO 63301 prior to the bid opening.
Bid opening will be on 3/25/2026 at 10:00 AM, in Room 115 of the St. Charles County
Administration Building, 201 North Second Street, St. Charles, MO 63301.
St. Charles County reserves the right to accept and/or reject any and all bids.
Bid results may be obtained by going to our St Charles County Government website @
http://www.sccmo.org/Bids.aspx click on "show Closed/Awarded/Cancelled bids", select
bid and click on "related documents". No phone calls please. The time it takes for final
bid results to be made public depends on the complexity of the project and the cost of the
project.
BID INQUIRIES
Any questions or clarifications concerning this Request for Bid must be submitted in writing via
E-mail (preferred), mail or fax to:
Donna Clayton
Finance Department, St. Charles County Government
201 North Second St
St. Charles, Missouri 63301
Fax: (636)949-3870
dclayton@sccmo.org
For questions or inquiries concerning the specifications please contact:
Diana Griffey
Facilities Management Department, St Charles County Government
300 North Second St, Room 101
St. Charles, Missouri 63301
dgriffey@sccmo.org
A mandatory meeting will be held at the Courtyard of the Criminal Justice Center located
near 300 N. Third Street (dock delivery) on 3/10/2026 at 9:00am.
The bid number and title shall be referenced on all correspondence.
All questions must be received no later than 2:00 PM on 3/16/2026. Any question
received after this deadline may not be answered.
Responses to questions/clarifications will be placed on the County's website
http://www.sccmo.org/Bids.aspx. Check this website frequently for updates and any
addendum that are issued.
26-058 FOUNDATION REPAIRS Proposal Response from (please complete)
Page 2 of 28 _______________________________________
Name of Company or Individual
Prohibited Communication
Contact with any representative, other than through the procedure outlined in the
section titled "Bid Inquiries", concerning this request is prohibited PRIOR TO BID
OPENING. Representative shall include, but not be limited to, all elected and appointed
officials, and employees of St. Charles County and their Agents within St. Charles
County.
Any Offeror engaging in such prohibited communications prior to Bid Opening may be
disqualified at the sole discretion of St. Charles County.
TERMS AND CONDITIONS
St. Charles County reserves the right to reject any and all bids or parts of a bid and waive
technicalities, and to adjust quantities.
All bids are final. No additions, deletions, corrections, or adjustments will be accepted after
the time of bid opening except by request of County.
All delivery costs or charges must be included in the F.O.B. destination bid price.
City, County and State of Missouri Sales Tax and Federal Taxes are not applicable to sales
made to St. Charles County and must be excluded.
The contract, provided in Exhibit A, shall be effective for the approximate nine (9) month
period from the date of execution.
The County, with the consent of the vendor, shall have the option to renew said contract for
one (1) additional three (3) month period at the same specifications and terms and
conditions of any contract that may be derived from this request for proposal.
The electronic version of this bid/RFP is available upon request. The document was
entered into WORD for Microsoft Windows. The Purchasing Office does not guarantee the
completeness and accuracy of any information provided on the electronic version.
Therefore, respondents are cautioned that the hard copy of this bid/RFP on file in the
Purchasing Office governs in the event of a discrepancy between the information contained
in or on the electronic version and that which is on the hard copy.
Vendors are required to clearly identify any deviations from the specifications in this
document.
Vendors must submit two [2] signed copies of their bid; one is to be an original and so
marked.
All prices and notations must be in blue ink or typewritten on the attached form. Mistakes
must be crossed out, corrections typed adjacent and must be initialed in blue ink by the
person signing the bid.
St. Charles County will not award any bid to an individual or business having any
outstanding amounts due from a prior Contract or business relationship with the County or
who owes any amount(s) for delinquent Federal, State or Local taxes, fees and licenses.
Sealed proposals received after the designated time of the receipt of the sealed proposals
will be considered as "No Bid" and "Void" and will not be opened.
26-058 FOUNDATION REPAIRS Proposal Response from (please complete)
Page 3 of 28 _______________________________________
Name of Company or Individual
The successful bidder is specifically denied the right of using in any form or medium the
names of St. Charles County or any other public agency within St. Charles County
Government for public advertising unless express written permission is granted.
All bidders must possess the necessary and appropriate business and/or professional
licenses in their field.
The County will make its award to the lowest responsive, responsible bidder unless
additional criteria is established herein. When payments are to be made to the County, the
County will award based on payments unless these documents establish additional criteria.
As used for this award, "responsive" shall mean a bid that conforms in all respects with the
terms and conditions of the County's requirements. As used for this award, "responsible"
shall mean that the bidder has the capability in all respects to perform fully the contract
requirements, and the integrity and reliability which will assure good faith performance.
County reserves the right to accept any item or group of items offered, unless the bidder
qualifies his bid by specific limitations. The bid can be on an "all or none" basis if wording
in the bid so states and if all items solicited are included in the bid.
When applicable, provide unit prices and extension prices. Where there is disagreement in
the unit and extension prices, the unit price shall govern.
MISSOURI PREVAILING HOURLY WAGE RATES:
The proposal for this Contract shall be based upon the required payment by the Bidder for
wages for each craft or type of workmen required to execute the Contract as determined
by the Department of Labor and Industrial Relations of Missouri, pursuant to Sections
290.210 to 290.340, RSMo. For those projects with a total cost of more than $75,000.00, a
schedule of such prevailing hourly rate of wages as determined by the Department of
Labor and Industrial Relations of Missouri, pursuant to said statutory provisions and made
a part of this Contract, Annual Wage Order #32, as of June 26, 2025.
Effective August 28, 2018, the provisions of sections 290.210 to 290.340 shall not apply to
the construction of public works for which either the engineer's estimate of the bid
accepted by the County for the total project is in the amount of $75,000.00 or less. For any
awarded bid in the amount of $75,000.00 or less that becomes subject to a contract
amendment that increases the total project cost in excess of $75,000.00, the provisions of
290.210 to 290.340 shall apply only to that portion of the project that is in excess of
$75,000.00.
INSURANCE:
The successful bidder must agree to provide and maintain during the life of the Contract
the insurance(s) listed below, in the minimum amounts specified, with an insurance
company licensed to do business in the State of Missouri. All policies must name the
County as an additional insured and provide for thirty (30) days written notice prior to any
material changes or cancellation. Successful bidder will be awarded contract once a
Certificate of Insurance is provided.
26-058 FOUNDATION REPAIRS Proposal Response from (please complete)
Page 4 of 28 _______________________________________
Name of Company or Individual
Worker's Compensation and Employer's Liability: Statutory WC limits as required by
the Statutes of the State of Missouri (or a qualified self-insurer) and Employers
Liability in an amount of no less than $1.0 million.
Automobile, General Liability and Property Damage: The Contractor shall maintain
the following minimum amounts of automobile, general liability, and property
damage insurance coverage during the life of the contract:
$1,000,000 for bodily injury or death to any one person and $3,000,000 per
occurrence for automobile and general liability coverage; and property damage
coverage of at least $1,000,000. A Combined Single Limit Policy in the amount of
$3,000,000 is an acceptable alternative. Automobile coverage must include non-
owned vehicles.
The Automobile & General Liabilities policies shall be endorsed to include the
County as an additional insured including the following language: Nothing in this
endorsement shall serve to operate as a waiver of the County's Sovereign Immunity or
broaden the liability of the County beyond the provisions of Sections 537.600 to 537.610
of the Revised Statutes of Missouri. Vendor shall provide for 30 days advance written
notice of any material change. A Waiver of Subrogation in favor of the County shall
be endorsed on each of the policies. The required insurance shall be primary
insurance with respect to any other insurance or self-insurance programs
maintained by the County.
A Certificate of Insurance evidencing the above coverage(s) together with a copy of
the required endorsements shall be provided to the County prior to the
commencement of any work.
It shall be the contractor's responsibility to keep the respective insurance policies
and coverages of any sub-contractor current and in force for the life of the contract.
Architects/Design Engineers: Errors and Omissions (Professional Liability): with
limits of not less than 1,000,000.000 per claim/$3,000,000.00 aggregate covering
all services provided by the Contract. Coverage to be written on a claims-made
basis.
a. Additional Requirements: The Automobile & General Liabilities policies shall
be endorsed to include the County as an additional insured including the
following language: "Nothing in this endorsement shall serve to operate as a
waiver of the County's Sovereign Immunity or broaden the liability of the
County beyond the provisions of Sections 537.600 to 537.610 of the Revised
Statutes of Missouri". Contractor shall provide 30 days advance written notice
of any material change. A Waiver of Subrogation in favor of the County shall
be endorsed on each of the policies. The required insurance shall be primary
insurance with respect to any other insurance or self-insurance programs
26-058 FOUNDATION REPAIRS Proposal Response from (please complete)
Page 5 of 28 _______________________________________
Name of Company or Individual
maintained by the County. A Certificate of Insurance evidencing the above
coverage(s) together with a copy of the required endorsements shall be
provided to the County prior to the commencement of any work. It shall be the
Contractor's responsibility to keep the respective insurance policies and
coverages current and in force for the life of the contract.
b. Subcontractor's Coverage: It shall be the Contractor's responsibility to
ensure that all subcontractor's maintain the same coverages and limits as
outlined herein.
BONDS:
Performance Bond - A 100% Performance and Payment Bond in favor of the Owner. The
Security Co. representing Contractor must be authorized to do business in the State of
Missouri and be approved by Owner. Performance and Payment bond will be required if
project is $50,000.00 or greater.
26-058 FOUNDATION REPAIRS Proposal Response from (please complete)
Page 6 of 28 _______________________________________
Name of Company or Individual
Open Records
Any and all information contained in or submitted with the bid becomes a public record subject
to the Missouri Sunshine Law. The County may include any information submitted with the bid
or submitted to the County during the award or review process in the County's public records,
public agendas, or public meetings. If the bidder believes that any information contained in or
submitted with the bid is protected from disclosure by the Missouri Sunshine Law, the bidder
must clearly identify what information the bidder believes is so protected and must also clearly
identify the legal basis therefor. Simply marking a document with "confidential" or similar
watermarks, notations, etc. shall not be sufficient to prevent disclosure of submitted
information.
Veteran Friendly Employment Policy
"Indicate whether you have developed a veteran friendly employment policy and, if so, attach
a copy of such policy to your response as a point of information."
_____ "YES" our company has a veteran friendly employment policy.
_____ "NO" our company does not have a veteran friendly employment policy.
Please include a copy of your veteran friendly employment policy with your submission.
26-058 FOUNDATION REPAIRS Proposal Response from (please complete)
Page 7 of 28 _______________________________________
Name of Company or Individual
Employment of Unauthorized Aliens Prohibited (Missouri Revised Statutes Section 285.530)
As a condition for the award of any contract or grant in excess of five thousand dollars by St.
Charles County to a business entity, the business entity shall, by sworn affidavit and provision
of documentation**, affirm its enrollment and participation in a federal work authorization
program (E-Verify) with respect to the employees working in connection with the contracted
services. Every such business entity shall sign an affidavit affirming that it does not knowingly
employ any person who is an unauthorized alien in connection with the contracted services.
[RSMO 285.530 (2)]
An employer may enroll and participate in a federal work authorization program (E-Verify) and
shall verify the employment eligibility of every employee in the employer's hire whose
employment commences after the employer enrolls in a federal work authorization program.
The employer shall retain a copy of the dated verification report received from the federal
government. Any business entity that participates in such program shall have an affirmative
defense that such business entity has not violated subsection 1 of this section. [RSMO 285.530
(4)]
Any entity contracting with St. Charles County shall only be required to provide the referenced
affidavit on an annual basis. A copy of the affidavit in included in this bid request. Vendors may
choose to send the required documentation using one of the following options:
Send the notarized affidavit and E-Verify MOU signature page to: St. Charles County,
Attn: Purchasing Manager, 201 N Second Street, Room 541, St. Charles, MO
63301prior to responding to any solicitations; OR
Send the notarized affidavit and E-Verify MOU signature page along with a bid
solicitation response.
These documents will be kept on file. The notarized affidavit and E-Verify MOU signature page
will remain current for one year from the date of the notarized affidavit.
** PLEASE NOTE:
Acceptable enrollment and participation documentation consists of a valid copy of the signature page of
the E-Verify Memorandum of Understanding, completed and signed by the Contractor, and the
Department of Homeland Security - Verification Division
The online address to enroll in the E-verify program is:
https://everify.uscis.gov/account/enroll
26-058 FOUNDATION REPAIRS Proposal Response from (please complete)
Page 8 of 28 _______________________________________
Name of Company or Individual
Interview Conference
After an initial screening of the submitted bids, any, or all of the companies
submitting a bid in response to this IFB may be required to give an oral presentation
or demonstration of their bid. Additional technical information may be requested for
clarification purposes, but in no way to change the original written proposal
submitted. The County reserves the right, in its sole discretion, to decide to conduct
interviews with any or all of the companies.
Consideration of Information from All Sources:
The County reserves the right to consider information and facts, gained from all
sources, including but not limited to the submitted bid, presentations, demonstration,
interviews, or references, in the evaluation process.
Responsibility to Submit Information:
By submitting a bid in response to this IFB, each company acknowledges, affirms
and agrees that it is the company's sole responsibility to submit information related
to the evaluation criteria and that the County is under no obligation to solicit any
information if it is not included with the company's proposal. Failure of the company
to submit such information in its bid may constitute grounds for rejection of the bid.
26-058 FOUNDATION REPAIRS Proposal Response from (please complete)
Page 9 of 28 _______________________________________
Name of Company or Individual
Description of Scope:
The Criminal Justice Center has experienced water intrusion within the building that has been
identified as originating in the Courtyard, in the rear of the building. St Charles County hired
Horner & Shifrin to identify the cause and generate the recommended repairs as outlined in
the design documents attached. They determined the original 'pre-compressed expansion
joint' needs to be replaced.
Scope:
The Contractor is responsible for all scope items identified in the design documents.
The Contractor must call for utility locates as needed to perform the work.
The Contractor will stay within the limited area of disturbance within the area of work
whenever possible. The Contractor may need to coordinate with the current construction
that is taking place, but at the time of the excavation work, the current construction should
be completed in the courtyard.
The Contractor shall demo existing expansion joints as needed and prep surfaces as
required by the expansion joint manufacturer.
The Contractor must confirm the cleanout does not have any connections and abandon
Install new concrete pre-compressed expansion join around the weep shelf in the weep
surface, seal against the wall joint from the interior.
The Contractor shall excavate the existing grade outlines to expose the existing pre-
compressed expansion joint on the exterior. Install the new material as specified on the
exterior.
Install new pre-compressed expansion join at the inside face, below the edge beam down
to the slab on grade.
Existing interior seals between the concrete slab on grade and the exterior wall should be
inspected and repaired as required.
Remove existing sealant and furnish and install new non-shrink exterior grade flexible
sealant to ensure a watertight seal between all pipes and wall penetrations inside.
There is a 1" conduit at the interior side of the work area that appears to be unused. Verify
no live connections and cap the conduit.
Contractor is responsible for maintaining a clean area, free of debris during work, but
primarily at the conclusion of each day.
Once the exterior work is completed, the Contractor must restore the area that was
disturbed to the grade in the design documents. The seed and straw work will be performed
by others.
Contractor must secure all tools and equipment being used when not on-site.
Given the Corrections Facility, the Contractor must adhere to all safety and security
protocols. Each on-site personnel must pass a background check requirement prior to work
commencing. All forms will be provided and clearances achieved before work may begin.
26-058 FOUNDATION REPAIRS Proposal Response from (please complete)
Page 10 of 28 _______________________________________
Name of Company or Individual
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Project Number Title Bid Date/ IFB/ RFQ/Electronic Plans Bid Addendum(s) Bid Results/ Awarded
State Government of Missouri
Bid Due: 8/11/2026
Project Number Title Bid Date/ IFB/ RFQ/Electronic Plans Bid Addendum(s) Bid Results/ Awarded
State Government of Missouri
Bid Due: 8/11/2026
Project Number Title Bid Date/ IFB/ RFQ/Electronic Plans Bid Addendum(s) Bid Results/ Awarded
State Government of Missouri
Bid Due: 8/06/2026
Project Number Title Bid Date/ IFB/ RFQ/Electronic Plans Bid Addendum(s) Bid Results/ Awarded
State Government of Missouri
Bid Due: 8/06/2026