Fort Peck Powerhouse 1 Cubicle Room 15kV Switchgear Replacement Project

Agency: DEPT OF DEFENSE
State: Montana
Type of Government: Federal
FSC Category:
  • Z - Maintenance, Repair or Alteration of Real Property
NAICS Category:
  • 237130 - Power and Communication Line and Related Structures Construction
Posted Date: May 28, 2025
Due Date: Jun 12, 2025
Solicitation No: W9128F25RA008
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Follow
Fort Peck Powerhouse 1 Cubicle Room 15kV Switchgear Replacement Project
Active
Contract Opportunity
Notice ID
W9128F25RA008
Related Notice
W9128F25SC008
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
US ARMY CORPS OF ENGINEERS
Sub Command
ENGINEER DIVISION NORTHWESTERN
Office
W071 ENDIST OMAHA
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Presolicitation (Original)
  • Original Published Date: May 28, 2025 11:04 am CDT
  • Original Response Date: Jun 12, 2025 02:00 pm CDT
  • Inactive Policy: 15 days after response date
  • Original Inactive Date: Jun 27, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Z1KA - MAINTENANCE OF DAMS
  • NAICS Code:
    • 237130 - Power and Communication Line and Related Structures Construction
  • Place of Performance:
    Fort Peck , MT 59223
    USA
Description



DESCRIPTION OF WORK:



The Fort Peck power plant has a series of 15kV class breakers that act as the generator breakers connecting the 3 generators in powerhouse 1 to the eastern and western power grids. Even through the breakers operate at 13.8kV their unique configuration requires switching orders from the transmission authority. Under the scope of this sources sought the 10 breaker cubicles and all associated buswork and equipment would be removed and replaced. This equipment will be replaced with 5 new breakers in the cubical rooms with associated equipment housed in additional cubicles. An additional 6 outdoor rated breakers will be installed in the switchyard. It is noted that the outage of the cubical room will be under tight time constraints given the support the power plant provides to the western power grid.



The complete 15 kV switchgear system will include:




  • Metal-clad 15kV switchgear and breakers with instrumentation transformers (current and rack-out potential transformers). This includes 3 generator breakers and 2 tie breakers with associated bus work.

  • 15kV outdoor circuit breakers with instrumentation transformers, 15kV disconnect switches and interconnecting 15kV aluminum bus system.

  • Power, protection, control, and annunciation cabling between switchgear and control room.

  • Control board modifications of the mimic bus, metering equipment and control switches.

  • Revisions to existing protective relaying and synchronization scheme.

  • 15kV Bus differential protection.

  • New 15kV, 4000A cable bus to connect the 15kV switchgear in Cubicle Room to the new 15kV breakers in the switchyard.

  • New feeders from the new 15kV breakers in the switchyard to transformers KX5A, KV7A, KZ2A, KY4A and the new reactors.

  • The KV7A feeder is required to be installed in a 15kV air rated underground tray system.



The scope will also include the installation of two new 15kV, 12MVA reactors banks. These banks will be connected to outdoor 15kV switchgear. They will be providing MVAR support to the transmission systems off the tertiary of the 115kV/230kV KV7A Autotransformer.



Additionally, the scope incudes the replacement of the cable trays in the cable tunnel, the replacement in kind of the lighting distribution panelboards and dry-type transformers in the switchyard, the installation of warning lights at the three entrance points to the Cubicle Room, and an evaluation of the existing lighting system in the Cubicle Room.


Attachments/Links
Contact Information
Contracting Office Address
  • KO CONTRACTING OFFICE 1616 CAPITOL AVENUE
  • OMAHA , NE 68102-4901
  • USA
Primary Point of Contact
Secondary Point of Contact
History
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Follow Piegan LPOE Housing Complex Parking Garage Babb N2630245 - Amendment 0001 Active

GENERAL SERVICES ADMINISTRATION

Due by 9/30/2026

Follow Yellowstone National Cemetery National Shrine Project Active Contract Opportunity Notice ID 36C78626B50214

VETERANS AFFAIRS, DEPARTMENT OF

Follow Repair Water Tanks 1511 & 1512 Active Contract Opportunity Notice ID FA462626R0020

DEPT OF DEFENSE

Due by 9/29/2026

Project Bid Date A/E# Design Consultant Invitation to bid Music Building Renovation -

State Government of Montana

Due by 9/29/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.