| Agency: | |
|---|---|
| State: | Montana |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Sep 16, 2025 |
| Due Date: | Sep 18, 2025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
15 SEP UPDATE: NEW Questions and Answers; Also a drawing. Please see Attachments/Links.
12 SEP 2025 UPDATE: Responses to Questions:
1. Do any of the fence posts to be removed include concrete that they have been buried in.
Answer: Fort Peck is not aware of that.
2. Is there a diagram for the steel gate(s)?
Answer: No but an example spec can be provided.
3. What length should the 5" in-line post be?
Answer: Minimum 10’
4. Will t-posts and wood line posts be set in concrete or can they be driven?
Answer: T-post can be driven wooden line post may require holes to be dug with post hole digger due to soil conditions or can be driven with hydraulic driver.
5. The contract documents specify a metal post to be used in concrete for gate braces. What length of post will this be?
Answer: If talking about deadman for gate bracing minimum 3’
6. Will the government stake the fence line or is it exactly where the old fence will be removed?
Answer: It is exactly where the fence is to be removed.
7. Specs are in the PWS (SOW Fence) in Section 5, please see Attachments/Links
8. Technical details are in the Technical Exhibit 2, please see PWS (SOW Fence) Attachments/Links
****************************************************************************************************************************
UPDATE 1: Extended Due Date: 18 September 2025.
UPDATE 2: Updated Price Schedule. This document will be used moving forward. Please see Attachments/Links section.
The Fort Peck project is in need of fencing on the boundaries of USACE property, installing and removal services on Fort Peck Project Lands in Valley and McCone Counties in Montana.
NOTE: DUE DATE will be 18 September 2025. An admendment to extend will be coming out next week.
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
RFQ for AE Services MSBD Vocational Building Demo & New Construction A/E# 2025-20-02
State Government of Montana
Bid Due: 8/19/2026
Post Date 08/03/2026 Quest Number 10309529 Category Code Roofing Bid/Request Name Missoula Waster
City of Missoula
Bid Due: 8/24/2026
Follow Pryor Clinic Expansion Construction in Pryor Active Contract Opportunity Notice ID 75H70126R00024
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Bid Due: 8/18/2026
Follow MT FLAP SILVER 2021(1), Roosevelt Drive Safety and Realignment Project Active Contract
TRANSPORTATION, DEPARTMENT OF