Forestry and Parks - Request for Proposal - EDSON WILDFIRE RECLAMATION…
| Agency: | Government of Canada |
|---|---|
| State: | Federal |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Nov 1, 2024 |
| Due Date: | Nov 28, 2024 |
| Solicitation No: | AB-2024-09218 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Description
Wildfire EWF031-2023 is 201,913 ha in size. EWF031 WEST is located south of the town of Edson, near N53 20.0394 W116 6.1756
Also included in the EWF031 WEST contract will be 4 wildfires (EWF028, EWF086, EWF096 and EWF108 from 2021 season. One wildfire, EWF086-2021, was completely overrun by the main wildfire and the required reclamation of dozer guard/watercourse crossings is included in the data for EWF031. Here are the locations for the additional wildfires added to this contract:
EWF028-2021: Located NE of the town of Edson at N53 45.1610 W116 39.4760 and is 30 hectares in size. During suppression efforts, there was approximately 5.04 km of fireguard constructed. This involves heavy equipment pushing ground vegetation (shrubs, grasses, and trees) aside to expose mineral soil and restrict/slow wildfire progression.
EWF096-2021: Located south of the town of Edson at N53 11.8851 W116 40.2762 and is
7 hectares in size. During suppression efforts, there was approximately 2.18 km of fireguard constructed. This involves heavy equipment pushing ground vegetation (shrubs, grasses, and trees) aside to expose mineral soil and restrict/slow wildfire progression.
EWF108-2021: Located NE of the town of Edson at N53 45.4100 W116 52.4800 and is 6 hectares in size. During suppression efforts, there was approximately 2.64 km of fireguard constructed. This involves heavy equipment pushing ground vegetation (shrubs, grasses, and trees) aside to expose mineral soil and restrict/slow wildfire progression.
Reclamation with mechanical equipment is required to recover the land base to a near natural state. The fireguard travels through mainly spruce and pine stands, taking advantage of natural clearings when possible. Reclaiming the fireguard will require pulling back the topsoil, woody debris, and any displaced trees onto the grubbed fire guard. The trees are to be broken up mechanically or manually slashed so to be made to lie flat to the ground. Leaning or damaged trees that cannot be reached mechanically without causing significant additional damage to the forest, will be manually felled and/or bucked to lie flat to the ground.
There are specific erosion mitigation measures that need to be implemented directly on guard approaches at a number of watercourse crossing locations. Installation of cross ditches and silt fencing will also be required to aid in water run-off management and in trapping sediment before it gets into the watercourse.
The estimated contract period will be 3 month(s), with a proposed start date of 2024/12/06.
-
World Trade Organization Agreement on Government Procurement (WTO GPA)
The functionality to add your company name to the list of interested businesses is temporarily unavailable.
This list does not replace or affect the tendering procedures for this procurement process. Businesses are still required to respond to bid solicitations, and to compete based on the set criteria. For more information please read the Terms of use .
See Also
Description This RFQ is to establish a list of Qualified Suppliers to bid
Government of Canada
Due by 11/30/2026
Description Interested Suppliers are invited to submit a Response to this Multi-Use List
Government of Canada
Due by 3/31/2027
Description MULRFQ#SU25TCC01 - Silviculture Surveys Interested Suppliers are invited to submit a Response
Government of Canada
Due by 11/29/2028
Description This is a test. Please do not respond. Show more description Show
Government of Canada
Due by 12/31/2036