Forced Circulation Evaporator

Agency: State Government of South Dakota
State: South Dakota
Type of Government: State & Local
Posted Date: Feb 6, 2024
Due Date: Feb 20, 2024
Solicitation No: 24RFP10077
Bid Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
24RFP10077
Forced Circulation Evaporator
Attachments
RFP Document.pdf
02/06/2024 10:18 AM CT
02/06/2024 10:18 AM CT
02/20/2024 5:00 PM CT
Ready for Responses

Attachment Preview

Entity Name: South Dakota State Government
Event Number: 10077
Event ID: 24RFP10077
Event Name: Forced Circulation Evaporator
Requested By: Missy Schuetzle
Created By: Missy Schuetzle
Due By Date: 02/20/2024 05:00 PM Central Time
Q&A Cutoff Date: 02/06/2024 11:15 AM Central Time
Invitation Type: Invitation Only
Assigned Commodities: 031-07 Air Circulation Equipment (Not Otherwise Classified); 493-30 Evaporators,
Analytical (Air or Nitrogen Jet); 493-32 Evaporators, Vacuum: Flash, Rotating, etc.
Allow Supplier Terms and Conditions: No
Public Responses: No
Display Awardee: Display
Posting Board Status: Published
Event Status: Ready for Responses
Section #: Name:
1 Section 1 - 24RFP10077
Do not submit responses through ESM Sourcing; please submit your response as specified in the RFP document.
The Invitation Type for this RFP, designated as "Invitation Only," indicates that vendors who have chosen the applicable NIGP codes for the requested
services will receive an autogenerated system email notification. The Invitation Only designation does not impose exclusivity or restrictions on access;
it does not limit who can respond. Also, the RFP document is accessible to all interested parties for download via the Central Bid Exchange on OPM’s
website: https://sourcing.esmsolutions.com/postingboard/entities/3444a404-3818-494f-84c5-2a850acd7779.
All vendors are encouraged to download the RFP and submit their proposals following the instructions outlined in the RFP document.
2 SCOPE
The project will include a new Forced Circulation Evaporator. This document defines the requirements and deliverables for this system. It describes
overall requirements that must be met to produce the specific equipment requested.
This URS is the input document for the:
• Equipment procurement purposes
• Equipment sizing
• Functional and technical specifications
3 BACKGROUND
The Dakota Bioproducts Innovation Institute is a research facility for the development of high-quality bioproducts. A Forced Circulation Evaporator skid
has been identified as one of the technologies that will be available for customer use.
4 PROCESS DESCRIPTION
The Evaporator system will be a single effect, skid-mounted unit used to concentrate a variety of streams. It shall include a shell and tube heat
exchanger for heating the feed product, as well as a cone bottom tank for separation of vapor and liquid. The flashed vapor from the separation tank
shall be sent to a condenser system consisting of a shell and tube heat exchanger, condensate tank, and vacuum pump. Steam will be used as the
heat source for evaporation. Chilled water will be used as the cooling source to condense the flashed vapor. The unit will be CIP cleanable without
dismantling.
5 BASIS OF DESIGN
5.1 Capacities
The feed flow rate will be up to 1500 lb/hr. The maximum evaporation rate will be 1200 lb/hr.
5.2 Skidded Construction
The evaporator and accessories shall be mounted on a skid, work as a stand-alone unit, and be supported by plant utilities. Requirements for the skid
and its component parts will be defined by the skid supplier, in a pre-purchase detailed proposal and drawings.
5.3 Health, Safety and Environment (HSE)
The evaporator skid will satisfy appropriate conformity assessment procedures and the controls shall carry the UL marking. Selected unit shall be
constructed per the current ASME BPE standard. The unit will be designed to protect users from hot surfaces. Pressure relief safety valves or rupture
disks shall be vented to a safe location.
1
5.4 Operation, personnel and automation
The evaporator skid will be fully automated as a standalone unit such that operations personnel will not need to attend to the skid once the unit is
started and operating. An Ethernet connection for SCADA interface for batch reporting shall be provided.
5.5 Materials of Construction
All materials of construction must be compatible with ambient and hot water for injection (WFI), and typical chemical cleanings agents such as
phosphoric acid, potassium hydroxide, and sodium hydroxide up to 3%. Piping specifications, including all gasket and valve seat material must align
with current ASME BPE standards, where applicable.
5.6 Reliability & maintenance
The skid will be designed to operate routinely during 24 / 7 / 365 operations. All wear parts shall be easily accessible and replaced on a regular
maintenance schedule. Wear parts like gaskets shall be stock items that can be ordered and delivered in a timely manner.
2 RETURN BIDS TO
Craig Arnold craig@dakotabioworx.org
Bobby Markham Bobby.Markham@sdstate.edu
3 OTHER PROVISIONS
Must meet 200 CFR buy America Provision• Title 49 Subtitle B Chapter VI Part 661
Federal Participation Disclosure – “This project will be partially funded with Federal funds from the United States Department of Commerce, Economic
Development Administration and therefore is subject to the Federal laws and regulations associated with that program.”
Must meet Federal Contract provision 200 CFR Title 2 subtitle A Chapter II Part 200
Terms and Conditions
ESM Sourcing Terms
None
General Terms and Conditions
None
Event Specific Terms and Conditions
See attached document.
2