First Street Archway Repair
| Agency: |
City of Sanford |
| State: |
Florida |
| Type of Government: |
State & Local |
| NAICS Category: |
- 236220 - Commercial and Institutional Building Construction
- 237310 - Highway, Street, and Bridge Construction
|
| Posted Date: |
Nov 6, 2025 |
| Due Date: |
Dec 4, 2025 |
| Solicitation No: |
IRFQ 25/26-301 |
| Original Source: |
Please Login to View Page |
| Contact information: |
Please Login to View Page |
| Bid Documents: |
Please Login to View Page |
Main
Agency
City of Sanford
Status
Active
Title
First Street Archway Repair
Type
Informal Request for Quote
Department
Parks & Grounds
Online Submissions
Yes
Project Estimate
Piggyback Solicitation
No
Insurance Required
No
Bid Bond Required
No
Bid Bond Amount
Performance Bond Required
No
Performance Bond Amount
Construction Bond Required
No
Construction Bond Amount
Scope of Services
The City of Sanford sustained damage to the south entry wall to the Historic Downtown Sanford, located on the south side of First Street and French Avenue. The city is seeking a qualified contractor with expertise in brick removal and restoration to evaluate the existing damage and perform necessary repairs or replacement, ensuring structural integrity, public safety, and visual consistency with the surrounding architecture.
B. Demolition & Removal: Carefully remove existing brick from one (1) column measuring approximately 4’ x 2’ x 17’5” located at the south entrance of First Street. All debris will be disposed of in accordance with local regulations.
C. Brick Installation: Supply and install modular brick on the existing CMU column. Brick will be provided to best match the existing structure, as General Shale (Boral) Bayou brick or best matching to size, texture and color.
D. Maintenance of Traffic (MOT): Provide full MOT setup for a duration of two (2) weeks, including sidewalk closure, sign stands, barricades, and lane shift setup to ensure public safety and compliance with city requirements.
E. Additional Inclusions:
i. All labor and materials
ii. Job-related trash removal
iii. Compliance with applicable codes and standards
iv. Coordination with city representatives as needed
Dates(All times are listed as
EST
)
Broadcast Date
10/30/2025 8:00 AM EST
Question End Date
11/27/2025 2:00 PM EST
Due Date
12/4/2025 2:00 PM EST
Bid Opening Date
Pre-Bid Meetings
Total: 0
(All times are listed as
EST
)
|
Date
|
Time
|
Mandatory
|
Location
|
Shortlist Meeting
Total: 0
(All times are listed as
EST
)
Documents
Total: 1
|
Type
|
Name
|
Description
|
File Type
|
|
|
Informal Bid Request
|
IRFQ 25 26-301 First Street Archway Repair.pdf
|
IRFQ 25/26-301 Solicitation
|
PDF
|
|
Quote/Bid
Quote/Bid Items
Total: 0
|
#
|
Required
|
Group
|
Make
|
Model
|
Description
|
Quantity
|
Unit of Measure
|
Price/ Percent
|
Type
|
Additional Quote/Bid Items Fields
Display Options Spreadsheet Section
|
No
|
Display Image and Specifications Hyperlink Fields
|
No
|
Display Build Sheet File Upload Field
|
No
|
Display Options File Upload Field
|
No
|
Require Build Sheet File to be Uploaded
|
No
|
Require Options File to be Uploaded
|
No
|
Display Lead Time Field
|
No
|
Display Standard Packaging Field
|
No
|
Delivery Date
None
Required Files to be Uploaded by the Vendor
None
Shipping
None
Terms and Conditions
None
Include Shipping in Price of Items
No
Display Bid Tabulation to Vendors
No
Display Vendor Submissions to Vendors
No
View Vendor Submissions while Bid Solicitation is Active
No
Allow Options File to be Updated after Due Date
No
Allow Post Due Date Submission
No
Questions & Answers
Total: 0
|
Question
|
Date Asked
|
Answer
|
Date Answered
|
Commodity Codes
Total: 3
|
Code
|
Description
|
|
[210-80]
|
Ties and Anchors and Other Masonry Wall Reinforcements
|
|
[910-51]
|
Masonry, Concrete, and Stucco Maintenance, Finishing, and Repair (Includes Inside Concrete Sawing and Grouting Work)
|
|
[914-55]
|
Masonry
|
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.
Sign-up for a Free Trial, Government Bid Alerts
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Try One Week FREE Now
See Also
ITB No. 26-05 Lakes by the Bay Parking Lot and Walkway Retrofit Project
Cutler Bay town
Bid Due: 6/25/2026
Description: Belle Glade Water Main Improvements-SE Zone 6 Water System Department: Water Utilities
Palm Beach County
Bid Due: 1/23/2030
Description: Government Center 11th and 12th floor - Minor Renovation Department: Facilities Dev
Palm Beach County
Bid Due: 7/06/2030
Description: Government Center 11th and 12th floor - Minor Renovation Department: Facilities Dev
Palm Beach County
Bid Due: 8/14/2030