Final Bridge Design: TH 13 Corridor in Savage

Brief Description: MnDOT requests letters of interest for final bridge design and plans for the TH 13 corridor reconstruction from Savage to Burnsville. Through this solicitation, MnDOT will procure four separate professional/technical contracts—separate consultants for each contract—to complete the bridge design services for the bridges in this solicitation. The goal of this project is to produce certified bridge construction plans, Division SB Special Provisions, load ratings, and approach panel plan sheets for all bridges described in Exhibit A: Specifications, Duties, and Scope of Work.

Date posted: 05/08/2026
Due date: 05/26/2026

Attachment Preview

Contract No. Bridge Nos. Description
1063376 70057 TH 13 over Quentin Ave. and Credit River
1063377 70058 TH 13 over Huntington Ave.
1063378 70059 & 70060 TH 13 eastbound and westbound ramps over Credit River
1063379 19100 TH 13 over Chowen Ave.

MNDOT CONTRACT NO. 1063376 - 1063379
EXHIBIT A: SPECIFICATIONS, DUTIES, AND SCOPE OF WORK
PROJECT OVERVIEW
Through State Project No. (SP) 1901-203, State has programmed the reconstruction of the TH 13 corridor
through Savage, Minnesota for an August 2027 construction letting. This scope of work is for a multi-
award procurement for final bridge design services, broken into four professional/technical contracts as
follows:
Contract No. Bridge Nos. Description
1063376 70057 TH 13 over Quentin Ave. and Credit River
1063377 70058 TH 13 over Huntington Ave.
1063378 70059 & 70060 TH 13 eastbound and westbound ramps over Credit River
1063379 19100 TH 13 over Chowen Ave.
1.0 PROJECT ADMINISTRATION, COORDINATION, AND MEETINGS (SOURCE TYPE: 1010)
State will provide a Project Manager to give direction to Contractor's activities. It will be the responsibility
of State's Project Manager to receive the work produced by Contractor, review the work for accuracy and
compliance with State standards, and to recommend payment for such work.
Contractor will conduct the administration of the project, which will include communication with
State, invoicing, preparation of any necessary supplemental agreements, cost and schedule updates,
and other non-technical work.
No changes in Contractor's project management or lead design personnel will be permitted without
prior written notice to State's Project Manager. State will notify Contractor immediately if there are
changes to State's assigned project management personnel.
1.1 PROJECT MEETINGS
Kick-Off Meeting: Contractor will participate in a kick-off meeting. The meeting will establish
communication protocol for the project, discuss known project issues, and review the project
schedule. Assume a 4-hour meeting duration.
Monthly Project Meetings: Contractor will participate monthly progress review meetings to
coordinate specific design details and provide project updates with State staff. Assume 2-hour
meeting durations. State's anticipated participants will include:
a) Bridge Office Final Design Unit Leaders/Project Managers
b) Metro District Project Manager
c) Metro District Roadway Design Lead/Consultant
Plan Review Meetings: Contractor will participate in plan review meetings at each plan submittal
stage identified in this exhibit (as directed by State's Project Manager, assumed for resolution of
plan comments if necessary). If needed, Contractor will supply meeting agendas to State's Project
Manager at least three business days prior to each meeting. Contractor will also record and
1

MNDOT CONTRACT NO. 1063376 - 1063379
EXHIBIT A: SPECIFICATIONS, DUTIES, AND SCOPE OF WORK
furnish meeting minutes within three business days after each meeting. Assume 2-hour meeting
durations.
2.0 QUALITY MANAGEMENT PLAN (QMP) AND QUALITY MANAGEMENT PROCEDURES (SOURCE TYPE: 1010)
Contractor will develop a project specific QMP for the project that appropriately addresses
applicable components from the MnDOT Bridge Design Manual, Article 4.1. Contractor will update
the QMP as necessary at State's request. The QMP will specify how Contractor will perform Quality
Assurance (QA) and Quality Control (QC) activities throughout the duration of the project to ensure
delivery of a quality product in a timely manner that conforms to established contract
requirements. Contractor must submit its QMP to State for final review and concurrence within 5
days of NTP.
2.1 DESIGN AND PLAN SHEET CHECK
Contractor is responsible for the completeness and accuracy of its work. Design calculations
and plan sheets must be independently checked and reconciled prior to submittal to State.
Review comments from State on Contractor's various plan review submittals does not relieve
Contractor of liability for an inaccurate or incomplete bridge plan. With each plan submittal,
Contractor must supply an electronic copy of plan and calculation check prints, along with a
comment log documenting resolution of all State plan review comments.
2.2 SOFTWARE PROGRAMS
Software programs and/or spreadsheets utilized by Contractor must be verified by Contractor's
in-house Quality Assurance Program.
2.3 QA VERIFICATION
Contractor's Project Manager or QA Manager must review the entire plan design and production
process to ensure the completeness and accuracy of Contractor's work and conformance with
Contractor's QA procedures.
3.0 FINAL BRIDGE DESIGN (SOURCE TYPES: ABUT, DECK, GEOM, PIER)
Contractor will conduct detailed bridge design and prepare Final Certified Bridge Plans in accordance
with the provisions detailed below. All bridge design files and plans must be produced using Bentley
CONNECT Edition software.
Contractor will perform the required engineering to determine the geometric, material, and
procedural requirements for the construction of the bridge(s).
3.1 BRIDGE SURVEYS
State will provide surveys for the bridge(s).
2

MNDOT CONTRACT NO. 1063376 - 1063379
EXHIBIT A: SPECIFICATIONS, DUTIES, AND SCOPE OF WORK
3.2 FOUNDATIONS
State will provide FADR reports for the bridge(s).
3.3 BRIDGE AESTHETICS
Contractor will incorporate aesthetics as described in the signed Preliminary Bridge Plans and Visual
Quality Manual.
3.4 BRIDGE DECK DRAINAGE EVALUATION
If a bridge deck drainage system is identified in the signed Preliminary Bridge Plans, then Contractor
will incorporate the appropriate deck drainage into its design and plans.
3.5 COST ESTIMATING
Contractor will provide estimated quantities and pay items with its 30%, 60% and 95% submittals
for Bridge Office use in preparing the Engineer's Estimate.
3.6 DESIGN STANDARDS AND PLAN PREPARATION
Bridge plans will be prepared in accordance with the following design standards and documents:
a) MnDOT Load and Resistance Factor Design (LRFD) Bridge Design Manual
b) American Association of State Highway and Transportation Officials (AASHTO) LRFD Bridge
Design Specifications
c) MnDOT Surveying and Mapping Manual
d) MnDOT Drainage Manual
e) MnDOT Checking List for Final Plans (provided by State)
f) MnDOT Computer Assisted Design and Drafting (CADD) Standards
g) MnDOT Summary of Recommended Drafting Standards
h) MnDOT Staff Approved Layout
i) MnDOT Environmental Documents and Design Memorandums
3.7 Final Design Submittals
If State determines at any time during design that major plan revisions are necessary due to
Contractor plan errors, Contractor will furnish revised plan sheets at no cost to State.
3.7.1 30% Plan Review
The 30% Plan provides State an early review of the final plan preparation for conformance
with the signed Preliminary Plan, aesthetic guidelines, and key design specifications. The
intent of this review is to identify design discrepancies at an early stage and avoid major
plan modifications resulting from future reviews. At a minimum, the 30% Plan will include:
a) GP&E
For this submittal, the GP&E sheet(s) need to be completed only to the extent
necessary to show general dimensions, elevations, cross section, architectural
features, stage construction information, and basic design data. The sheet(s) will
3

MNDOT CONTRACT NO. 1063376 - 1063379
EXHIBIT A: SPECIFICATIONS, DUTIES, AND SCOPE OF WORK
be based on the approved Preliminary Plan.
b) Framing Plan
Include a preliminary beam run with computations.
c) Bridge Layout Sheet(s)
For this submittal, the Bridge Layout Sheet(s) must show a line diagram that
indicates the control point, work line, reference lines, and proposed working point
locations. The tabulations required do not need to be completely filled in;
however, the sheet(s) will indicate the diagonal and other dimensions that will be
included in the Final Plan. It will also contain any corner views sections, and
notations (i.e. expansion joint details at gutters, sidewalks, barriers, etc.) needed to
clarify the working point locations. Corner details may be detailed on a separate
sheet for clarity.
d) Abutment Layout Sheet(s)
For this submittal, the abutment layout sheet(s) need to be completed only to the
extent necessary to show footing size and the top/bottom elevations for
coordination with Final Road Design. It will also contain any tie-in points to adjacent
bridges, retaining walls, or both. Contractor will promptly coordinate any changes
in footing size, elevation, or both that occur between the 30% Plan and the 60%
Plan that would impact Final Road Design plans.
e) Architectural or Special Detail Sheet(s)
Architectural or special detail sheet(s) showing any standardized shapes proposed
to maximize repeatability of pier forms and other special details that require early
coordination between Contractor and State prior to final plan preparation.
f) Bridge Survey Sheet(s)
Survey sheets from the signed Preliminary Plan are to be included in this submittal;
however, they are not required to be completed.
g) Any supporting design computations used to develop the aforementioned items.
Contractor will submit two sets of the 30% Plan to State for review, along with an electronic
copy of the plan and calculation check prints. State will return 30% Plan comments to
Contractor within 20 working days. Contractor may proceed with further design during this
review period.
3.7.2 60% PLAN REVIEW
The intent of the 60% Plan Review is to verify Contractor's progress toward plan completion
and evaluate against project and contract timelines. The 60% Plan submittal will include two
full sets of in-progress plan sheets, working copies of electronic design files (MicroStation,
Geopak), and Draft Special Provisions. Include PC beam design, abutment details, and pier
design and details. State's Bridge Office will return 60% Plan review comments within 20
working days. Include an electronic copy of plan and calculation check prints, along with the
comment log documenting resolution of State plan review comments from the 30% review.
4

MNDOT CONTRACT NO. 1063376 - 1063379
EXHIBIT A: SPECIFICATIONS, DUTIES, AND SCOPE OF WORK
Contractor may continue with design during this submittal.
3.7.3 95% PLAN REVIEW
The intent of the 95% Plan Review is for State to verify that the plan is acceptable for the
State Bridge Engineer's signature. The 95% Plan should be complete to the extent that it can
be certified by Contractor, although a certification signature is not required until after this
review has been completed. Contractor will submit the 95% Plan to State with the plan and
calculation check prints and comment log or other process documenting resolution of State
plan review comments from the 60% review. State's Bridge Office will return 95% Plan
review comments within 20 working days. Contractor will also submit finalized Special
Provisions (one electronic copy) with the 95% Plan submittal.
3.7.4 CONSTRUCTION ELEVATIONS
Upon reconciliation of State's comments on the 95% Plan, Contractor will produce
construction elevations for the bridge. Regardless of the software used, the output format
for construction elevations must be consistent with State's construction elevation program.
State will provide instructions and an example of construction elevations output upon
request. The construction elevations output must be submitted to State with the Final
Certified Bridge Plan.
3.7.5 FINAL CERTIFIED BRIDGE PLAN
Upon incorporation of State's 95% Plan comments, Contractor will submit the Certified Final
Bridge Plan to State for each bridge included in this contract.
4.0 LOAD RATINGS (SOURCE TYPE: 2850)
Contractor will provide a load rating analysis for each bridge and provide a Bridge Rating and Load
Posting report. Load rating work will be done in accordance with the AASHTO Manual for Bridge
Evaluation, current edition with interims.
Contractor will provide the load rating using AASHTOWare BrR software. Guidelines for
AASHTOWare BrR input requirements will be provided by State upon request. If the bridge cannot
be rated with AASHTOWare BrR, Contractor must use another commercially available structural
analysis software with the approval of State. The software must be capable of running overweight
vehicles as described below.
Contractor will load rate the bridge carrying vehicular traffic for Load and Resistance Factor Rating
(LRFR) using the following:
a) HL-93 loading
b) Minnesota Standard Permit Trucks G-80
c) Minnesota Standard Permit Trucks G-07, when a non-BrR (VIRTIS) software is used
5

MNDOT CONTRACT NO. 1063376 - 1063379
EXHIBIT A: SPECIFICATIONS, DUTIES, AND SCOPE OF WORK
The LRFR rating factor for new bridges must be a minimum of 1.0 at the Inventory level for HL-93
loading and 1.15 at the Operating level for permit loading. Contractor must demonstrate that the
minimum rating factors are being provided during the design of the bridge. For bridges with a
minimum of one span over 200 feet long, the permit vehicle loading must consist of a combination
of the permit vehicle and lane load. The lane load must be in accordance with Article 3.6.1.2.4 of the
AASHTO LRFD Bridge Design Specifications, except that the load will be 0.20 klf.
Contractor will rate the deck for any design that deviates from MnDOT standard design tables. Rate
and report each separate superstructure component, segment, or type within the overall bridge; at
a minimum, rate for moment and shear at the tenth points of each span. The overall rating must be
the lowest rating of any individual component, segment, or type. The final rating and each
component rating must be accompanied by the location of the rating, the limit state, and the impact
factor. Where ramps extend onto a bridge, rate the ramp as a separate member. For culverts,
complete MnDOT Form 90.
4.1 CONTRACTOR DELIVERABLES
a) Bridge Rating and Load Posting Report. The AASHTOWare BrR software file or the file from
another commercially available software must be submitted with the Bridge Rating and Load
Posting Report. The ratings must be based on the final configuration of the bridge.
b) Contractor will submit a preliminary rating with the 60% bridge plans.
c) Contractor will submit the final load rating and load posting report with the final certified bridge
plans.
5.0 APPROACH PANEL DESIGN AND DETAILING (SOURCE TYPE: 1250)
For bridge approach panels, Contractor will:
a) Choose and modify the appropriate standard plan sheets necessary for the
bridge approach panels (http://standardplans.dot.state.mn.us/StdPlan.aspx)
b) Prepare any other necessary details needed for the construction of the bridge approach panels
c) Coordinate the approach panel design with the State's Roadway Design Unit
d) Submit final plan sheets including pay items and quantities to State for bridge approach panels
e) Submit any necessary special provisions for the bridge approach panels (for any
construction requirements in addition to the 2020 MnDOT standard provisions)
f) Submit MicroStation files to State for bridge approach panels designed
Contractor will provide plans signed by a professional engineer registered in the State of Minnesota and
any special provisions needed for the approach panels. Contractor will provide a list of approach panel
sheets expected for detailing at the same time as the 30% Plan/Intermediate Plan. The approach panel
sheets are not expected to be complete with the 30% submittal. Contractor must provide finalized
approach panel plans sheets at the same time as the 60% Plan/Final Plan.
6.0 FINAL DESIGN DELIVERABLES
6

MNDOT CONTRACT NO. 1063376 - 1063379
EXHIBIT A: SPECIFICATIONS, DUTIES, AND SCOPE OF WORK
Contractor will submit deliverables directly to State's Project Manager.
6.1 CONTRACTOR DELIVERABLES
a) QMP
b) 30% Plan - Anticipated due date: July 20, 2026
1) .pdf file of in-progress 30% Plan
2) Plan and calculation check prints and comment log (electronic copy)
3) Estimated item quantities and pay item lists
4) Draft construction elevations output (to verify formatting)
c) 60% Plan - Anticipated due date: November 20, 2026
1) Working copies of electronic design files (MicroStation)
2) .pdf file of in-progress of 60% Plan
3) Plan and calculation check prints and comment log (electronic copy)
4) Estimated item quantities and pay item lists
5) Draft Special Provisions (electronic copy)
d) 95% Plan - Anticipated due date: March 15, 2027
1) Working copies of electronic design files (MicroStation)
2) .pdf file of in-progress 95% Plan
3) Plan and calculation check prints and comment log (electronic copy)
4) Estimated item quantities and pay item lists
5) Final Special Provisions (electronic copy)
e) Final Certified Bridge Plan - Anticipated due date: May 14, 2027
1) Final Design Calculations (electronic copy)
2) Final Quantity Calculations and Pay Items (electronic copy)
3) Plan and calculation check prints and comment log (electronic copy)
4) MicroStation files of Final Bridge Plans. MicroStation files will allow direct
reproduction of plan sheets with reference files detached.
5) Construction elevation output
6) Flash drive with electronic copies of all final deliverables
6.2 STATE DELIVERABLES
a) Signed Preliminary Bridge Plans for Bridges
b) FADR for the bridge(s)
c) Special provision examples
7.0 CONSTRUCTION SUPPORT (SOURCE TYPE 1800)
Contractor will respond to Requests for Information (RFIs) and provide supporting design analysis as
needed. If these services are needed, State's Project Manager will send the RFIs to Contractor, and
Contractor will direct its responses back to State's Project Manager. Design office support during
construction of the project is not assumed as part of this contract. Assume 60 hours for construction
support.
7

MNDOT CONTRACT NO. 1063376 - 1063379
EXHIBIT A: SPECIFICATIONS, DUTIES, AND SCOPE OF WORK
8

This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Event Name: RECS RFP Pre-Design for MCF-Faribault Expansion Business Unit: Admin - Real

State Government of Minnesota

Bid Due: 8/31/2026

Request for Proposals, Bus Stop Design Service area: Community Development, Public Works Start

City of Mankato

Bid Due: 9/01/2026

FACILITY MASTER PLAN. SouthWest Transit is soliciting proposals from firms interested in developing

League of Minnesota Cities

Bid Due: 8/10/2026

CIVIL AND/OR PROSECUTION SERVICES. The City of Champlin is seeking qualifications and proposals

League of Minnesota Cities

Bid Due: 8/25/2026