| Agency: | State Government of Florida |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| Posted Date: | Jan 18, 2026 |
| Due Date: | Apr 1, 2026 |
| Solicitation No: | ITB-14835 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Code | Description |
| 72151000 | Boiler and furnace construction and maintenance services |
| 72151001 | Boiler maintenance service |
| 72151002 | Boiler installation and setup service |
| 72151003 | Heating system maintenance and repair service |
| 72151005 | Boiler pressure controller installation |
| 72151006 | Boiler pressure controller maintenance or repair or operation |
| 72151200 | Heating and cooling and air conditioning HVAC construction and maintenance services |
| 72151201 | HVAC mechanical construction service |
| 72151206 | HVAC heating system construction service |
| 72151207 | Heating and cooling and air conditioning HVAC installation and maintenance service |
| 72153208 | Insulation of pipes and boilers service |
| 73161513 | Power plant boilers manufacture services |
FDVA invites interested Contractors to submit bids in accordance with this
solicitation.The purpose ,of this solicitation is to establish an Agreement with FDVA for the Douglas T.
Jacobson State Veterans’ Nursing Home located at 21281 Grayton Terrace, Port Charlotte, Fl. 33954
(Charlotte County).The successful Contractor shall provide labor, services, equipment, tools,materials,
and supplies required in the performance of the Agreement. Contractor shall remove the existing boiler #2
and drain wate and reconnect piping. Contractor will install new boiler Lochinvar M# CBN1257 Copper-fin
gas boiler. Reconnect existing flue gas piping to new boiler.Wire electrical to the new boiler and replace
existing pipe insulation. Open isolation valves and check for any leaks on new boiler. Start up of pump
and boiler.Contractor will provide staff training, proper disposal of all project related waste, as well as one
(1) annual system inspection, including but not limited to testing and repairs.The term of this Contract shall
commence on the date of the Agreement’s full execution, with no renewals. FDVA requires specified
services to be completed to the full satisfaction and acceptance of FDVA and any applicable authorities
having jurisdiction, within one hundred and twenty (120) calendar days from the date of Agreement’s full
execution.
| Description | Date/Time |
| FDVA-ITB-26-005B Jacobson - Lochinvar Boiler #2 | Jan 16, 2026, 11:39:46 PM |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Project ID: Title: Police K-9 Compound (Project No. 22209-118) Addenda: 0 Release Date:
City of St. Petersburg
Bid Due: 6/09/2026
RFQ-26-C-00022 26-C-00022 Howard F. Curren AWTP Aquifer Recharge Wells Pumping System Design-Build View
City of Tampa
Bid Due: 6/11/2026
Project ID: Y26-740 Title: Reams Road Improvement Project - Summerlake Park Blvd to
Orange County
Bid Due: 6/04/2026
Follow P683 AIRCRAFT ENGINE REPAIR FACILITY, NAVAL AIR STATION(NAS), JACKSONVILLE, FLORIDA Active Contract
DEPT OF DEFENSE
Bid Due: 6/09/2026