FCI Jesup - Water main tie-into water softener
| Agency: | JUSTICE, DEPARTMENT OF |
|---|---|
| State: | Georgia |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Jul 25, 2025 |
| Due Date: | Aug 4, 2025 |
| Solicitation No: | 15B30725PR000102 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- Original Published Date: Jul 25, 2025 12:04 pm MDT
- Original Response Date: Aug 04, 2025 04:00 pm MDT
- Inactive Policy: Manual
- Original Inactive Date: Sep 30, 2025
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Z2FF - REPAIR OR ALTERATION OF PENAL FACILITIES
-
NAICS Code:
- 237110 - Water and Sewer Line and Related Structures Construction
-
Place of Performance:
Jesup , GA 31599USA
The Federal Bureau of Prisons is conducting market research in accordance with the Federal Acquisition Regulation, Part 10. A single solicitation will be issued for the Water main Tie-In to the existing centralized water softener system. The Federal Bureau of Prisons (FBOP), FCI Jesup, is a federal correctional facility located at 2600 Highway 301 South, Jesup, GA 31599. The FBOP intends to award to a responsible entity for the provision of all labor, materials, and equipment necessary for tapping into the existing 12" Ductile Iron Water Main, reducing it to 6" pipe, to supply water to the new water softener system. Work includes excavating around an existing check valve vault to expose the 12-inch ductile iron water main, installing 12-inch valve onto the upstream side of the check valve, installing tie-ins for a 6-inch supply and a return on the 12-inch water main underground, penetrating through the metal building wall, and install a 6-inch line to the existing water softener system. See SOW for drawings for further details. All work must comply with local, state, and federal regulations. Drawings will be provided to show the layout of the work area.
- USAF RES CMPLX 346 MARINE FORCES DR
- GRAND PRAIRIE , TX 75051
- USA
- Steven Dennison
- sdennison@bop.gov
- Phone Number 7197845744
- Jul 25, 2025 12:04 pm MDTSources Sought (Original)
See Also
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-77021-NONST-2027-000000197
State Government of Georgia
Due by 9/17/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66418-NONST-2026-000000023
State Government of Georgia
Due by 10/07/2026
B2932 - Resurfacing Contract 2027-1 Local Roads (Northwest) ADVERTISEMENT FOR BIDS 2022 TRANSPORTATION
Cobb County
Due by 9/24/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66397-NONST-2027-000000018
State Government of Georgia
Due by 10/01/2026