Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-3
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | North Dakota |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Oct 16, 2024 |
| Due Date: | Nov 19, 2024 |
| Solicitation No: | W912ES23B0016 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: Oct 16, 2024 02:49 pm CDT
- Original Date Offers Due: Nov 19, 2024 02:00 pm CST
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Dec 04, 2024
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Y1KA - CONSTRUCTION OF DAMS
-
NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
Fargo , NDUSA
The U.S. Army Corps of Engineers (USACE), St. Paul District has a requirement for the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-3. The Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-3, is located in Cass County, North Dakota. Work to be completed as part of this project includes the following:
- Reach SE-3 Embankment: Construct a 1.7-mile-long embankment section between I-29 and the Red River Structure. The embankment includes a utility crossing that includes construction of two 8-inch HDPE water mains with air release valves, one 6-inch and one 8-inch HDPE force sanitary sewer line, and three 4-inch and five 3-inch CLSM dry utility conduits.
- The Reach SE-3 embankment includes the County Road 81 (CR 81) crossing construction. The crossing includes installation of two 10-foot by 10-foot box culverts. The CR 81 crossing extends approximately ½ mile north of the embankment crest.
- Maintain the gravel road on approximately 0.7 miles of 174th Ave. SE and on approximately one mile of 49th St. SE.
- Reach SE-2 Gap: Close a 0.2-mile-long gap between Reaches SE-2A and SE-2B. Work will include terminating 57th St S and connecting the borrow ditches.
- Drain 27 Access Road and Stockpile: Grade existing access road and surface with aggregate. Remove 57th St. S south of the borrow ditch and place a barricade on 112th Ave. S.
- SE-2B Temporary Closure Removal: Remove 2 temporary closures within Reach SE-2B. The northern closure, located at the County Road 16 (CR16) crossing, consists of Flap Gates placed in the four, 10-foot by 10-foot reinforced box culverts. The southern closure, located near 173rd Ave. S consists of an earthen embankment with two box culverts. The top of the embankment will be removed and a drainage layer, articulated concrete block and turf reinforcement mat will be placed on the weir.
- Temporary Levee Removal: Remove a temporary levee within the borrow ditch on the east side of I-29; total length is approximately1,000 feet.
- Utility Relocation: Relocate sanitary sewer force main, water main, and electrical and communication conduits.
The anticipated magnitude of this project will be between $25,000,000.00 and $100,000,000.00.
The North American Industry Classification System (NAICS) code for this project will be 237990; Other Heavy and Civil Engineering Construction with a size standard of $45.0 Million.
The resulting contract shall be a Firm, Fixed-Price contract.
The solicitation is a Total Small Business Set-Aside.
The solicitation is an Invitation for Bid (IFB).
No CD's or hard copies of the solicitation will be available. Offerors are responsible for checking the Contract Opportunities website (https://sam.gov/content/opportunities) for any update(s) to the solicitation. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the document posted at the referenced website.
There is no “Plan Holder List” for this project. The interested vendors list is listed as part of the solicitation posting on the Contract Opportunities website. In order to view this list, vendors will need to sign into their SAM account.
In order for contractors to conduct business with the Department of Defense, the contractor must provide registration information to the System for Award Management (SAM). All Offerors must be registered in SAM prior to receiving an award, have an active SAM account, and have the Representations and Certifications (FAR and DFARS) sections completed prior to award. Registration instructions may be obtained, and online registration may be accomplished, at https://sam.gov/content/entity-landing.
As required by 15 U.S.C. 644(w), the Corps of Engineers’ policy and procedures, as well as past performance information, in regard to definitization of requests for equitable adjustments is found at https://www.usace.army.mil/Business-With-Us/Partnering.
- KO CONTRACTING DIVISION 332 MINNESOTA STREET SUITE 1500
- SAINT PAUL , MN 55101-1323
- USA
- Scott E. Hendrix
- Scott.E.Hendrix@usace.army.mil
- Kevin P. Henricks
- kevin.p.henricks@usace.army.mil
- Oct 16, 2024 02:49 pm CDTSolicitation (Original)
- Sep 18, 2024 11:06 am CDT Presolicitation (Original)
Related Document
See Also
RFP - Water Reclamation Facility - IFAS Improvement Project Bid/RFP Status Open -
City of Dickinson
Due by 9/17/2026
Follow Industry Feedback for Draft Requirements, Solicitation, and Request for White Papers for
DEPT OF DEFENSE
Due by 9/23/2026
Follow Minot Air Force Base Multiple Award Construction Contract (MACC) IDIQ Active Contract
DEPT OF DEFENSE
Due by 9/28/2026
Follow REMOVE AND REPLACE CONCRETE DRAINAGE PAD FOR BUILDING #11 WITH OPTOINS Active
AGRICULTURE, DEPARTMENT OF
Due by 9/23/2026