| Agency: | Town of Manchester |
|---|---|
| State: | Connecticut |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Oct 8, 2025 |
| Due Date: | Oct 28, 2025 |
| Solicitation No: | 25/26-15 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Project ID: 25/26-15
Title: FALL PROTECTION FOR HRWPCF
Addenda: 1
Release Date: 9/25/2025
Due Date: 10/28/2025
The Town of Manchester, Connecticut, through its Water and Sewer Department, is seeking proposals from qualified vendors to supply and install a fall protection system for two primary clarifiers at the Hockanum River Water Pollution Control Facility (HRWPCF). This RFP invites competitive proposals for the design, supply, and installation of a horizontal lifeline safety system to enhance worker safety during maintenance and operations activities on the clarifiers, in compliance with relevant OSHA standards.
The HRWPCF is a wastewater treatment plant operated by the Town of Manchester, treating up to 8.25 million gallons per day. The facility includes two primary clarifiers requiring fall protection for personnel. This project aims to address fall protection needs by adding a reliable horizontal lifeline system around these clarifiers.
Proposals must demonstrate the vendor's ability to provide a high-quality, durable solution that meets or exceeds the specifications outlined herein. The selected vendor will be responsible for all aspects of the project, including materials, labor, installation, testing, and training.
The Hockanum River Water Pollution Control Facility is located in Manchester, CT, and serves the local community by treating wastewater conveyed from surrounding areas. As part of ongoing safety improvements, the Town has identified the need for enhanced fall protection around the two primary clarifiers to protect personnel from fall hazards during maintenance and operations activities.
This RFP is based on a proposed corrective action involving the addition of a horizontal lifeline safety system around the primary clarifiers. The system must provide a convenient tie-off point and comply with OSHA 29 CFR 1910.23(c)(1) and 29 CFR 1926.501(b)(1) for fall protection.
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Long Wharf Waterfront Play Structure Seeking design and installation of a unique play
State Government of Connecticut
Bid Due: 6/06/2026
Request for Qualifications for Construction Manager at Risk (CMR) Services BI-2B-483-CMR, OCME Expansion
State Government of Connecticut
Bid Due: 6/16/2026
Bid Title: Assessment of Board of Education and Town Shared Services Opportunities Category:
Granby town
Bid Due: 6/05/2026
Project ID: Title: High Low Ropes Athletic Challenge Course for High School in
City of New Haven
Bid Due: 6/16/2026