| Agency: | State of Vermont - Agency of Transportation |
|---|---|
| State: | Vermont |
| Type of Government: | State & Local |
| Posted Date: | May 1, 2026 |
| Due Date: | May 29, 2026 |
| Solicitation No: | C03272 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| CONSTRUCTION ADVERTISEMENTS | QUESTIONS DUE PRIOR TO 4:30 PM | ADDENDA | BID OPENING |
|
C03272 FAIRLEE IM 091-2(91) PROPOSAL Geotechnical Data Report I-91 Southbound Condition Data TMP Checklist Record Plans APPROVED BIDDERS LIST PLAN HOLDERS LIST DOWNLOAD PLANS IN iCX |
5/20/2026 |
Addendum #1 Addendum #2 | 5/29/2026 |
FAIRLEE
IM 091-2(91)
VTRANS
Fairlee,
Vermont
GEOTECHNICAL DATA
REPORT
May 2024
PREPARED FOR
VTRANS
219 North Main Street
Barre, VT 05641
PREPARED BY
HNTB Corporation
9 Entin Road
Suite 202
Parsippany, NJ 07054
Phone: (973) 434-3100
Fax: (973)-434-3101
Contact: Joseph Juzwin, PE
VERMONT AGENCY OF TRANSPORTATION FAIRLEE IM 091-2(91)
FINAL GEOTECHNICAL DATA REPORT MAY 31, 2024
............................................................................................. 2
.......................................................................................... 2
........................................................................................................ 3
......................................................................................... 5
........................................................................................................................................ 7
PAGE 1 OF 7
VERMONT AGENCY OF TRANSPORTATION FAIRLEE IM 091-2(91)
FINAL GEOTECHNICAL DATA REPORT MAY 31, 2024
*
*
*
*
PAGE 2 OF 7
VERMONT AGENCY OF TRANSPORTATION FAIRLEE IM 091-2(91)
FINAL GEOTECHNICAL DATA REPORT MAY 31, 2024
PAGE 3 OF 7
| Approximate | |||||||
|---|---|---|---|---|---|---|---|
| Boring | Northing | Easting | |||||
| Total | |||||||
| Alignment | Station | Offset | Ground Elev. | ||||
| Number | (ft) | (ft) | Depth (ft) | ||||
| (ft) | |||||||
| B-101 | 509994.1 | 1729122.2 | I-91 SB | 4794+25 | 27.0 LT | 435.0 | 8.0 |
| B-101A | 509988.0 | 1729113.0 | I-91 SB | 4795+99 | 26.6 LT | 435.0 | 67.0 |
| B-102 | 510020.1 | 1729163.6 | I-91 SB | 4796+28 | 27.3 LT | 432.0 | 92.0 |
| B-103 | 509912.7 | 1729109.2 | I-91 NB | 4794+25 | 38.5 LT | 434.0 | 81.0 |
| B-104 | 509945.7 | 1729176.6 | I-91 NB | 4794+99 | 31.2 LT | 433.0 | 96.0 |
| B-105 | 510018.3 | 1729282.9 | I-91 NB | 4796+28 | 37.1 LT | 432.0 | 96.0 |
| B-106 | 509926.9 | 1729252.0 | I-91 NB | 4795+54 | 24.4 RT | 431.0 | 46.0 |
| B-106A | 509929.9 | 1729257.0 | I-91 NB | 4795+59 | 24.5 RT | 430.0 | 82.0 |
| B-107 | 509953.5 | 1729312.3 | I-91 NB | 4796+19 | 33.5 RT | 430.0 | 82.0 |
VERMONT AGENCY OF TRANSPORTATION FAIRLEE IM 091-2(91)
FINAL GEOTECHNICAL DATA REPORT MAY 31, 2024
Approximate
Total
Boring Northing Easting
Alignment Station Offset Ground Elev.
Depth (ft)
Number (ft) (ft)
(ft)
B-101 509994.1 1729122.2 I-91 SB 4794+25 27.0 LT 435.0 8.0
B-101A 509988.0 1729113.0 I-91 SB 4795+99 26.6 LT 435.0 67.0
B-102 510020.1 1729163.6 I-91 SB 4796+28 27.3 LT 432.0 92.0
B-103 509912.7 1729109.2 I-91 NB 4794+25 38.5 LT 434.0 81.0
B-104 509945.7 1729176.6 I-91 NB 4794+99 31.2 LT 433.0 96.0
B-105 510018.3 1729282.9 I-91 NB 4796+28 37.1 LT 432.0 96.0
B-106 509926.9 1729252.0 I-91 NB 4795+54 24.4 RT 431.0 46.0
B-106A 509929.9 1729257.0 I-91 NB 4795+59 24.5 RT 430.0 82.0
B-107 509953.5 1729312.3 I-91 NB 4796+19 33.5 RT 430.0 82.0
PAGE 4 OF 7
| Test | Number of Tests | Standard |
|---|---|---|
| Water Content | 9 | ASTM D2216 |
| Atterberg Limits | 9 | ASTM D4318 |
| Grain Size Analysis | 1 | ASTM D422 |
| Percent Passing No. 200 Sieve | 4 | ASTM D1140 |
| Triaxial Unconsolidated Undrained Test | 4 | ASTM D2850 |
| Triaxial Consolidated Undrained Test | 3 | ASTM D4767 |
| Water | Fines | ||||||
|---|---|---|---|---|---|---|---|
| Boring | Sample | ||||||
| Liquid | Plastic | Plasticity | |||||
| Depth (ft) | |||||||
| Content | Content | ||||||
| Number | No. | Limit | Limit | Index | |||
| (%) | (%) | ||||||
| B-101A | S-11 | 35-37 | - | - | - | - | 83.9 |
| B-101A | S-12 | 40-42 | 27.0 | 24 | 20 | 4 | 92.4 |
| B-101A | S-14 | 50-52 | 31.8 | NP | NP | NP | - |
| B-102 | S-14 | 50-52 | 31.5 | 35 | 17 | 18 | - |
| B-102 | S-16 | 59-61 | 37.4 | NP | NP | NP | - |
| B-103 | S-13 | 50-52 | 32.0 | 33 | 21 | 12 | 80.2 |
| B-103 | S-15 | 59-61 | 40.1 | 51 | 25 | 26 | - |
| B-103 | S-17 | 74-76 | 32.0 | NP | NP | NP | - |
| B-104 | S-16 | 59-61 | 34.5 | 39 | 23 | 16 | - |
| B-104 | S-19 | 74-76 | 34.9 | NP | NP | NP | - |
| B-105 | S-8 | 19-21 | - | - | - | - | 97.6 |
VERMONT AGENCY OF TRANSPORTATION FAIRLEE IM 091-2(91)
FINAL GEOTECHNICAL DATA REPORT MAY 31, 2024
Table 4-1: Summary of Assigned Laboratory Tests
Test Number of Tests Standard
Water Content 9 ASTM D2216
Atterberg Limits 9 ASTM D4318
Grain Size Analysis 1 ASTM D422
Percent Passing No. 200 Sieve 4 ASTM D1140
Triaxial Unconsolidated Undrained Test 4 ASTM D2850
Triaxial Consolidated Undrained Test 3 ASTM D4767
Table 4-2: Summary of Laboratory Index Testing Results
Water Fines
Liquid Plastic Plasticity
Boring Sample
Content Content
Depth (ft)
Limit Limit Index
Number No.
(%) (%)
B-101A S-11 35-37 - - - - 83.9
B-101A S-12 40-42 27.0 24 20 4 92.4
B-101A S-14 50-52 31.8 NP NP NP -
B-102 S-14 50-52 31.5 35 17 18 -
B-102 S-16 59-61 37.4 NP NP NP -
B-103 S-13 50-52 32.0 33 21 12 80.2
B-103 S-15 59-61 40.1 51 25 26 -
B-103 S-17 74-76 32.0 NP NP NP -
B-104 S-16 59-61 34.5 39 23 16 -
B-104 S-19 74-76 34.9 NP NP NP -
B-105 S-8 19-21 - - - - 97.6
PAGE 5 OF 7
| Water | Fines | ||||||
|---|---|---|---|---|---|---|---|
| Boring | Sample | ||||||
| Liquid | Plastic | Plasticity | |||||
| Depth (ft) | |||||||
| Content | Content | ||||||
| Limit | Limit | Index | |||||
| Number | No. | ||||||
| (%) | (%) | ||||||
| B-106A | S-5 | 60-62 | 34.3 | 38 | 20 | 18 | - |
| B-107 | S-10 | 30-32 | 26.6 | 26 | 22 | 4 | - |
| B-107 | S-15 | 55-57 | 27.0 | NP | NP | NP | 78.7 |
| Peak | Undrained | |||||
|---|---|---|---|---|---|---|
| Confining | ||||||
| Boring | Sample | Depth | ||||
| Test | Deviator | Shear | ||||
| Stress | ||||||
| No. | Stress | Strength, | ||||
| Number | No. | (ft) | ||||
| (psf) | ||||||
| (psf) | Su (psf) | |||||
| B-102 | UD-1 | 57-59 | 1 | 8050 | 1610 | 805.2 |
| 2 | 5350 | 1025 | 512.6 | |||
| B-107 | UD-1 | 62-64 | 1 | 8300 | 2275 | 1138.0 |
| 2 | 5500 | 2044 | 1022.0 |
| Vertical | Effective | |||||
|---|---|---|---|---|---|---|
| Boring | Sample | Depth | ||||
| Test | Effective | Cohesion | Friction | |||
| No. | Stress | (psf) | Angle | |||
| Number | No. | (ft) | ||||
| (psf) | (deg) | |||||
| B-106A | UD-1 | 62-64 | 1 | 3993 | 973 | 16.7 |
| 2 | 4996 | |||||
| 3 | 5972 |
VERMONT AGENCY OF TRANSPORTATION FAIRLEE IM 091-2(91)
FINAL GEOTECHNICAL DATA REPORT MAY 31, 2024
Water Fines
Liquid Plastic Plasticity
Boring Sample
Content Content
Depth (ft)
Limit Limit Index
Number No.
(%) (%)
B-106A S-5 60-62 34.3 38 20 18 -
B-107 S-10 30-32 26.6 26 22 4 -
B-107 S-15 55-57 27.0 NP NP NP 78.7
Table 4-3: Summary of UU Testing Results
Peak Undrained
Confining
Test Deviator Shear
Boring Sample Depth
Stress
No. Stress Strength,
Number No. (ft)
(psf)
(psf) Su (psf)
1 8050 1610 805.2
B-102 UD-1 57-59
2 5350 1025 512.6
1 8300 2275 1138.0
B-107 UD-1 62-64
2 5500 2044 1022.0
Table 4-4: Summary of CIU Testing Results
Vertical Effective
Test Effective Cohesion Friction
Boring Sample Depth
No. Stress (psf) Angle
Number No. (ft)
(psf) (deg)
1 3993
B-106A UD-1 62-64 2 4996 973 16.7
3 5972
PAGE 6 OF 7
VERMONT AGENCY OF TRANSPORTATION FAIRLEE IM 091-2(91)
FINAL GEOTECHNICAL DATA REPORT MAY 31, 2024
PAGE 7 OF 7
FIGURES
| PROJECT SITE LOCATION FIGURE PROJECT SITE LOCATION MAP VTRANS BRIDGES 55-2 AND 55-3 INTERSTATE 91 (I-91) OVER LAKE MOREY OUTLET 1000 0 1000 2000 IM 091-2(91) | |||
|---|---|---|---|
| FIGURE PROJECT SITE LOCATION MAP VTRANS BRIDGES 55-2 AND 55-3 INTERSTATE 91 (I-91) OVER LAKE MOREY OUTLET IM 091-2(91) | |||
| 1000 0 1000 2000 |
PROJECT SITE LOCATION
FIGURE
PROJECT SITE LOCATION
MAP
VTRANS
BRIDGES 55-2 AND 55-3 INTERSTATE
91 (I-91) OVER LAKE MOREY OUTLET
1000 0 1000 2000 IM 091-2(91)
FEET FAIRLEE, VT
Basemaps: U.S.G.S. Fairlee, VT-NH Quadrangle US Topo, 2015
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Pedestrian and Bicycle Sidewalk Scoping Study- MPM Request Date: 6/26/2026 12:49:06 PM Open
State Government of Vermont
Bid Due: 8/10/2026
2026 Volkswagen Environmental Mitigation Trust: Eligible Mitigation Actions Request Date: 6/25/2026 3:32:16 PM
State Government of Vermont
Bid Due: 12/31/2026