F16_Circuit_Card_Assembly_NSN5998016536192_PN187218001
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Oklahoma |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Apr 15, 2024 |
| Due Date: | Apr 15, 2026 |
| Solicitation No: | F16_Circuit_Card_Assembly_NSN5998016536192_PN187218001 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
- Original Published Date: Apr 15, 2024 07:30 am EDT
- Original Response Date: Apr 15, 2026 12:00 am EDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: Apr 30, 2026
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: 5998 - ELECTRICAL AND ELECTRONIC ASSEMBLIES, BOARDS, CARDS, AND ASSOCIATED HARDWARE
-
NAICS Code:
- 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
-
Place of Performance:
Tinker AFB , OK 73145USA
QUALIFICATION REQUIREMENTS THAT MUST BE SATISFIED TO BECOME A QUALIFIED SOURCE
a. Prequalification Notice/Sources Sought: The offeror shall notify the appropriate government
Small Business Office or, if responding to a solicitation, the contracting officer in the appropriate
government contracting office, of intent to qualify as a source for this Circuit Card Assembly.
Offerors shall submit the Source Approval Request (SAR) package IAW AFMCI 23.113 and FAR
9.2 Qualification Requirements.
b. Facilities, Testing, and Inspection Capabilities: The offeror must certify to the government that
they have, or have access to, the required facilities and equipment to manufacture, inspect, test,
package, and store the item. The offeror shall make their facilities, equipment, tooling, and
personnel available for evaluation and inspection by the government.
c. Data Verification: The offeror must verify that they has a complete data package. This
verification must include a complete list of all procedures, drawings, and specifications,
possession including, at a minimum [GE Aviation
Systems LLC](35012) drawing 187218 or [Utah State University Space Dynamics Laboratory]
(05924) drawing 205-4401. The offeror may also be required to produce copies of all applicable
procedures, drawings, or specifications.
d. Manufacture/Process Verification: The offeror must manufacture this item to conform to the
government requirements as prescribed within the ESA-approved engineering/technical data
package. The offeror must show compliance with Unique Identification (UID) requirements in
accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical
data package. The offeror must provide, at their own expense, data showing the results of all
quality, performance, and environmental evaluations conducted by the offeror to show
compliance with the government requirements as prescribed by 416 SCMS/GUEAA. The offeror
shall also identify its sources for materials and its standards for internally used processes.
e. Test and Evaluation and/or Verification: The offeror, at their own expense, shall prepare and
submit to 416 SCMS/GUEAA for their prior approval, a qualification test plan/procedure
detailing how they intend to verify compliance with all performance, environmental,
mechanical, and quality assurance requirements identified by Drawing 187218 or [Utah State
University Space Dynamics Laboratory] (05924) drawing 205-4401. After completion of the
approved qualification testing, the offeror shall be required to submit a complete test report of
the results to 416 SCMS/GUEAA for their review and approval prior to the contract award. The
government retains the right to exercise the option to inspect the testing processes, including
on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror
shall notify the government at least 90 in advance of the occurrence of any testing that will be
used as a basis for qualification.
inspection during these tests.
MANUFACTURING QUALIFICATION REQUIREMENTS
NSN: 5998-01-653-6192
P/N: 187218-001
Noun: Circuit Card Assembly
Application: f-16
5 Mar 2024 Section C 2/2
f. Qualification Article Verification: The offeror must provide, at their own expense, a pre-contract
award qualification article for evaluation by the government. This article must comply with all
of the requirements of Drawing 187218 or [Utah State University Space Dynamics Laboratory]
(05924) drawing 205-4401. This article shall be subjected to a form, fit, and function evaluation
to demonstrate compatibility with the weapon system and to evaluate the manufacturing
capability of the offeror. Offerors will be notified whether or not their qualification article
passed or failed the required qualification testing within 60 days of submitting a product for
qualification testing. Note that successful completion of the qualification testing does not
guarantee any contract award. If the offeror is deemed qualified and awarded the contract, a
post-contract award first article exhibit may be required to verify production capability.
g. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which
will be incurred by the potential offering party to become qualified: $3,500.00.
h. Qualification Time Completion Estimate: It is the estimate of the engineering support activity
that completion of this qualification effort should require 180 days. This is based on complexity
of the Circuit Card Assembly and other factors.
i. Qualification Time Limitation: An offeror may not be denied the opportunity to submit and have
considered an offer for a contract if the offeror can demonstrate to the satisfaction of the
contracting officer that the offeror (or its product) meets these standards for qualification or can
meet them before the date specified for award of the contract. The award will not be delayed
to provide the vendor with an opportunity to demonstrate its ability to meet the standards
specified in this qualification requirement.
j. Evaluation of Proposals Not Previously Qualified: The offeror must be fully qualified in order to
be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements
stated, in writing, in the qualification requirement before the date specified for award of the
contract. Once all requirements are met, the offeror will be listed as an approved source for this
item. Approval, however, does not guarantee subsequent contract award.
MANUFACTURING QUALIFICATION REQUIREMENTS
NSN: 5998-01-653-6192
P/N: 187218-001
Noun: Circuit Card Assembly
Application: f-16
5 Mar 2024 Section C 1/1
- CP 405 739 4437 3001 STAFF DR STE 1AG1 98C
- TINKER AFB , OK 73145-3303
- USA
- Tracey Beringer
- tracey.beringer@us.af.mil
- Phone Number 7772211
- Apr 15, 2024 07:30 am EDTSources Sought (Original)
See Also
Follow B-2 Relay Assembly NSN: 5945-01-442-4318FW Active Contract Opportunity Notice ID FA811926R0008 Related
DEPT OF DEFENSE
Due by 10/19/2026
Follow Fuseholder Active Contract Opportunity Notice ID W911S226U4561 Related Notice Department/Ind. Agency DEPT
DEPT OF DEFENSE
Due by 10/06/2026
Follow Switch Pressure F110 NSN 5930012154689PR_PN_1274M99P01 Active Contract Opportunity Notice ID SPRTA126Q0448 Related
DEPT OF DEFENSE
Due by 10/15/2026
Follow Switch, Pressure Active Contract Opportunity Notice ID SPRTA126Q0420 Related Notice SPRTA126Q0420 Department/Ind.
DEPT OF DEFENSE
Due by 10/21/2026