EXT MOH | Balboa Res. Infrastructure GC RFP
| Agency: | City of San Francisco |
|---|---|
| State: | California |
| Type of Government: | State & Local |
| Posted Date: | Oct 18, 2024 |
| Due Date: | Nov 19, 2024 |
| Solicitation No: | SFGOV-0000010077 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
EXT MOH | Balboa Res. Infrastructure GC RFP
This version is no longer active. For the most recent version of this sourcing event, enter the event ID on the
View Opportunities
page.
If submitting a bid or proposal to this Sourcing Event, please ensure you have viewed the most recent version of this event as the solicitation documents and requirements may have been updated and revised from those displayed on or accessed from this page.
If submitting a bid or proposal to this Sourcing Event, please ensure you have viewed the most recent version of this event as the solicitation documents and requirements may have been updated and revised from those displayed on or accessed from this page.
Start Date:
10/18/2024 10:00AM PDT
Please read the Details section for information on how to bid on this opportunity
Details
The Balboa Reservoir (Reservoir) is a 17-acre site located across from City College. The masterplan calls for a series of 7 multifamily buildings and approximately 100 for sale townhomes for a total of 1100 units. The sponsor of this project is BRIDGE Housing and is requesting for the phase 1 infrastructure portion of the masterplan. The work under this bid will include demolition, grading, street and transportation improvements, open space improvements, combined sewer system, stormwater management, and pad readiness for Buildings E and A as described in the SIP plans and specifications. The work designed and included in the SIP is necessary for the fully functional public infrastructure, which will serve Building E, Building A, and future buildings on the site.
The project has a 25% SBE goal. A 10% ratings bonus shall be applied to SBE’s proposed as the prime contractor. A 7.5% rating bonus to a Joint Venture with SBE prime contractor participation that equals or exceeds forty percent (40%). Contractor’s bid proposal for each bid package must be accompanied by the following documents in order to be considered a valid bid by the Owner’s Representative. Incomplete bids may be rejected.
Bid Date: No earlier than 1:45 PM on the bid date and no later than 2:00 PM on the bid date, the following documents must be received via email as separate PDF attachments by the entire email distribution list below:
a. Bid Summary, Bid Form and Schedule of Values (Attachment 1a&b)
b. Bid Bond or Irrevocable Letter of Credit (Attachment 1c)
c. Subcontractor Listing (Attachment 2)
d. Bidder narrative of its work scope inclusions/exclusions that corresponds to their Bid proposal.
e. Please note that the Bid Schedule of Values includes allowances for anticipated items of work that not fully quantifiable at time of bid. Allowances are controlled by the Owner. If any of the allowance items are determined to be necessary to accomplish the project, the Owner will control the allowance will request a change order to perform the work. Pre-bid Site Walk: To Be Determined
Pre-bid RFIs Due: October 29, 2024
Response to Pre-bid RFIs: November 5, 2024
Bids Due: November 19, 2024
Interviews: Week of 01/20/24 and 01/27/24
Anticipated Award February 2025
Please see attachment 0 for further Bid Instructions. Bid attachments can be found at the following URL:
https://bridgehousing4-my.sharepoint.com/personal/etheurer_bridgehousing_com/_layouts/15/onedrive.aspx?id=%2Fpersonal%2Fetheurer%5Fbridgehousing%5Fcom%2FDocuments%2FDocuments%2FSHaring%2FBalboa%20Infrastructure%20GC%20RFP%20Documents&ga=1
For questions, please email both Andrew Johnson and Ernie Theurer. Their information is below.
Andrew Johnson, Senior Project Manager BRIDGE Housing - anjohnson@bridgehousing.com
Ernie Theurer, Associate Project Manager BRIDGE Housing - etheurer@brigdehousing.com
.
.
.
The project has a 25% SBE goal. A 10% ratings bonus shall be applied to SBE’s proposed as the prime contractor. A 7.5% rating bonus to a Joint Venture with SBE prime contractor participation that equals or exceeds forty percent (40%). Contractor’s bid proposal for each bid package must be accompanied by the following documents in order to be considered a valid bid by the Owner’s Representative. Incomplete bids may be rejected.
Bid Date: No earlier than 1:45 PM on the bid date and no later than 2:00 PM on the bid date, the following documents must be received via email as separate PDF attachments by the entire email distribution list below:
a. Bid Summary, Bid Form and Schedule of Values (Attachment 1a&b)
b. Bid Bond or Irrevocable Letter of Credit (Attachment 1c)
c. Subcontractor Listing (Attachment 2)
d. Bidder narrative of its work scope inclusions/exclusions that corresponds to their Bid proposal.
e. Please note that the Bid Schedule of Values includes allowances for anticipated items of work that not fully quantifiable at time of bid. Allowances are controlled by the Owner. If any of the allowance items are determined to be necessary to accomplish the project, the Owner will control the allowance will request a change order to perform the work. Pre-bid Site Walk: To Be Determined
Pre-bid RFIs Due: October 29, 2024
Response to Pre-bid RFIs: November 5, 2024
Bids Due: November 19, 2024
Interviews: Week of 01/20/24 and 01/27/24
Anticipated Award February 2025
Please see attachment 0 for further Bid Instructions. Bid attachments can be found at the following URL:
https://bridgehousing4-my.sharepoint.com/personal/etheurer_bridgehousing_com/_layouts/15/onedrive.aspx?id=%2Fpersonal%2Fetheurer%5Fbridgehousing%5Fcom%2FDocuments%2FDocuments%2FSHaring%2FBalboa%20Infrastructure%20GC%20RFP%20Documents&ga=1
For questions, please email both Andrew Johnson and Ernie Theurer. Their information is below.
Andrew Johnson, Senior Project Manager BRIDGE Housing - anjohnson@bridgehousing.com
Ernie Theurer, Associate Project Manager BRIDGE Housing - etheurer@brigdehousing.com
.
.
.
Event ID: SFGOV-0000010077
Format/Type: Sell Event RFx
Round: 1
Version: 1
My Bids
:
0
Edits to Submitted Bids
:
Allowed
Multiple Bids
:
Allowed
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Basic Information Title Request for Information (RFI) #26-004 - CBC Online Modernization/Replacement Agency
State Government of California
Due by 9/28/2026
Project: RFP- As-Needed Unit Turnover Flooring Services Ref. #: 2026-RFP-AHA-PO-004 Department: Property Operations
Housing Authority of the City of Alameda
Due by 10/14/2026
Bid No. 202627-4 - John Glenn High School Flagpole Project (Formal) Bid No.
Norwalk-La Mirada Unified School District
Due by 10/01/2026
Bid Solicitation # UD-26-356 Bid Solicitation # UD-26-356 Organization Name Long Beach Utilities
City of Long Beach
Due by 9/24/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.