E1909447 - Erosion Control for Hillside Damage (FY 25/26)
| Status |
|
Stage
Open
|
|
Posted
10/21/2025
|
|
Bid Due
11/14/2025, 02:00 PM PST
|
|
Partner
No |
| Contact |
|
Organization
City of Los Angeles
|
|
Department
Engineering Bureau, Public Works
|
|
Name
Daniel Orris
|
|
Email
Email
daniel.orris@lacity.org
|
|
Phone
|
|
Technical Assistance Deadline
|
- Summary
- More Tabs
Opportunity ID
Organization
Estimate
225928
City of Los Angeles
$326,635.00
Category
Bid Method
Type
Construction
Whole Item
TOS - Task Order Solicitation
Description
■ Only the following five Contractors can bid on this project as a Prime Contractor:
• Calex Engineering
• Clarke Contracting
• Jilk Heavy Construction, Inc.
• Mike Prlich & Sons, Inc.
• Mladen Buntich Construction Company
▬
♦ This project provides emergency erosion control mitigation measures to protect and repair damaged streets and right-of-way from further storm damage, as needed. These conditions of damaged streets during rain events are a threat to public safety. The implementation of erosion control measures will assist in safe passage to pedestrians and use of roadway, as well as to reduce further deterioration of the damage. The work will consist of the removal of old and deteriorated sandbags, placement of new sandbags, removal of old and damaged asphalt concrete (AC) paving and AC berm or concrete curb and gutter, installation of new AC paving, AC berm, and concrete curb and gutter, construction of a pipe and board structure and a metal beam guard rail, removal and haul away of soil, rock, weathered bedrock, and construction debris, and backfilling excavations with imported soil and compacting.
♦ All contract work must be completed within 42 calendar days from the NTP. After the contract work is completed, the project/contract will remain open through the summer to address potential additional damages that arise during the rainy season, and beyond.
▬▬▬▬▬
♦ See bid package for full scope & details
♦ Bid package only on RAMP- if you're one of the prequalified contractors, download it to be a planholder
♦ For Bid Results visit http://engineering.lacity.gov/contractors/
• Calex Engineering
• Clarke Contracting
• Jilk Heavy Construction, Inc.
• Mike Prlich & Sons, Inc.
• Mladen Buntich Construction Company
▬
♦ This project provides emergency erosion control mitigation measures to protect and repair damaged streets and right-of-way from further storm damage, as needed. These conditions of damaged streets during rain events are a threat to public safety. The implementation of erosion control measures will assist in safe passage to pedestrians and use of roadway, as well as to reduce further deterioration of the damage. The work will consist of the removal of old and deteriorated sandbags, placement of new sandbags, removal of old and damaged asphalt concrete (AC) paving and AC berm or concrete curb and gutter, installation of new AC paving, AC berm, and concrete curb and gutter, construction of a pipe and board structure and a metal beam guard rail, removal and haul away of soil, rock, weathered bedrock, and construction debris, and backfilling excavations with imported soil and compacting.
♦ All contract work must be completed within 42 calendar days from the NTP. After the contract work is completed, the project/contract will remain open through the summer to address potential additional damages that arise during the rainy season, and beyond.
▬▬▬▬▬
♦ See bid package for full scope & details
♦ Bid package only on RAMP- if you're one of the prequalified contractors, download it to be a planholder
♦ For Bid Results visit http://engineering.lacity.gov/contractors/
Proposal Submission Method
Links
Compliance Document List
Please login to find compliance document list
| Prime NAICS | Industry |
| 237310: Highway, Street, and Bridge Construction | Construction |
| 237990: Other Heavy and Civil Engineering Construction | Construction |
| 238110: Poured Concrete Foundation and Structure Contractors | Construction |
| Sub NAICS | Industry |
Meetings
Documents
| Name | Uploaded | Size |
| E1909447_Bid_Pkg | 10/21/2025, 12:47 PM PDT | 49.9 MB |
| E1909447_Project_Description | 10/21/2025, 09:55 AM PDT | 151.5 kB |
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Opportunity ID 231907 Organization City of Los Angeles Department Engineering Bureau, Public Works
City of Los Angeles
Due by 9/23/2026
Eastside Elementary School Landscape & Irrigation Project Drawings_Irrigation_Landscape_080726_EastsideElementarySchoolCDSet ProjectManual_EESLandscapeIrrigation Addendum 01_20260910 ADDENDUM 01
Eastside Union School District
Due by 9/15/2026
Opportunity ID 231950 Organization Los Angeles County Department Los Angeles County Stage Open
City of Los Angeles
Due by 9/24/2026
03 -125895 _103_A 03 -125895 _DWG_A 03 -125895 _SPC_A 03_125895_0 Invitation To Bid
Lennox School District
Due by 9/24/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.