Engineering Design Southport to Harbor Roadway

Agency: City of West Sacramento
State: California
Type of Government: State & Local
NAICS Category:
  • 541330 - Engineering Services
Posted Date: Nov 10, 2025
Due Date: Dec 15, 2025
Solicitation No: 25-082-RFP
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description


Project ID: 25-082-RFP

Title: Engineering Design Southport to Harbor Roadway

Addenda: 1

Release Date: 11/10/2025

Due Date: 12/15/2025

Post Information
Posted At:Mon, Nov 10, 2025 8:00 AMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:No
Overview
Summary

STATEMENT OF PURPOSE

The City of West Sacramento is soliciting proposals from qualified firms or individuals ("Proposer") to provide Professional Services for Engineering Design for the Southport to Harbor Roadway Project . More details on the City's needs for this work are provided in the Scope of Work .

Each qualified Proposer is to submit a proposal in conformity with the terms of this Request for Proposal ("RFP") by the deadline below ("Proposal"). The Proposer selected by the City pursuant to the terms of this RFP and the City's contracting procedures, if any is selected, is referred to herein as "Contractor."

SYNONYMOUS TERMS

Unless the use indicates otherwise, as used throughout this bid and its attachments, the following terms are synonymous:

a. Firm, Consultant, Supplier, Vendor, Contractor, Successful Bidder, Offeror

b. Purchase Order, Contract, Agreement

c. Services, Work, Scope, and Project

d. Pricing proposal/sheet, Cost proposal/sheet, Rate table/sheet

Background

The Southport to Harbor Roadway Project originated as an effort to address deteriorating pavement conditions along Southport Parkway. The project has since evolved into a Complete Streets initiative designed to rehabilitate pavement and improve multimodal safety through the addition of sidewalk infill, new bike lanes, upgraded utilities, and enhanced pedestrian and transit access. The project corridor includes:

  • Harbor Boulevard – from the US 50 on/off ramps to Industrial Boulevard

  • Industrial Boulevard – from Harbor Boulevard to the Palamidessi Bridge

  • Lake Washington Boulevard – from the Palamidessi Bridge to Southport Parkway

  • Southport Parkway – from Lake Washington Boulevard to Promenade Street

The corridor experiences a high percentage of truck traffic, which has accelerated pavement deterioration. While the City’s recent Neighborhood Pavement Preservation Program provided temporary repairs along Southport Parkway between Lake Washington Boulevard and Ramco Street, a long-term reconstruction solution is now required.

In 2022, the City completed preliminary design (35%) and several technical studies under a prior consultant contract. These documents will be made available in the Attachments section of this RFP:

  • 35% Schematic Design

  • 35% Construction Estimate

  • Storm Drainage, Sewer, and Water System Evaluation and Analysis

  • Geotechnical Pavement Evaluation

  • Life-Cycle Cost Analysis (LCCA) Memorandum

  • Phase 1 Environmental Site Assessment (ESA)

  • Traffic Analysis Report

  • UPRR Exhibit

The total project construction cost is currently estimated at $37 million and will likely be delivered in multiple construction phases. The project is federally funded with Regional Surface Transportation Program (RSTP) funds and recently received Enhanced Infrastructure Financing District (EIFD) funding from the City to advance design through 100% Plans, Specifications, and Estimate (PS&E).

Additional project information and background materials are available on the City’s website at:
Southport to Harbor Roadway Project | City of West Sacramento

Timeline
Project Release Date:
November 10, 2025
Pre-Proposal Meeting (Non-Mandatory):
November 19, 2025, 11:00am
Microsoft Teams Need help?
https://teams.microsoft.com/l/meetup-join/19%3ameeting_OTc4MjdlYzEtMzEwNy00OTdhLWFkOTAtNzc4NGJmMTNmZGNl%40thread.v2/0?context=%7b%22Tid%22%3a%22284d74b9-2287-48dd-86fa-55c87b82bc40%22%2c%22Oid%22%3a%22b6374918-6b3a-4d2b-93fb-65151bde0f9c%22%7d
Meeting ID: 277 665 198 775 9
Passcode: Ln77Hs7W
________________________________________
Dial in by phone
+1 619-485-0116,,160614818# United States, All locations
Find a local number
Phone conference ID: 160 614 818#
For organizers: Meeting options | Reset dial-in PIN
________________________________________________________________________________
Question Submission Deadline:
December 4, 2025, 11:00am
Question Response Deadline:
December 9, 2025, 2:00pm
Proposal Submission Deadline:
December 15, 2025, 2:00pm
City Council Contract Approval :
January 21, 2026
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

General Information Due Date: December 3, 2026 Opening Time: 2:00 PM Published Date:

City of Stockton

Due by 12/03/2026

Follow Design Renovation, System Support Center (SSC), 3551 Combine St., Paso Robles, CA

TRANSPORTATION, DEPARTMENT OF

Due by 11/12/2026

Notice Inviting Bids - Police Department Supplemental HVAC Project Department: Public Works RFP

City of Redwood

Due by 11/17/2026

BRC0000471 - NOTICE OF REQUEST FOR STATEMENT OF QUALIFICATIONS FOR ON-CALL CHANNEL CLEARING

City of Los Angeles

Due by 5/14/2027

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.