Emergency Water Conveyance Prototype (EWCP)
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Alaska |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Aug 14, 2026 |
| Due Date: | Sep 4, 2026 |
| Solicitation No: | W911KB26RWP02 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: Aug 14, 2026 12:41 pm AKDT
- Original Published Date: Aug 14, 2026 12:36 pm AKDT
- Updated Date Offers Due: Sep 04, 2026 02:00 pm AKDT
- Original Date Offers Due: Sep 04, 2026 02:00 pm AKDT
- Inactive Policy: Manual
- Updated Inactive Date: Sep 25, 2026
- Original Inactive Date: Sep 25, 2026
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1LC - CONSTRUCTION OF TUNNELS AND SUBSURFACE STRUCTURES
-
NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
Juneau, AK Juneau , AK 99801USA
Project Requirement: Develop and demonstrate a proof of concept for, and design and construct, a new EWCP to protect the Mendenhall Valley, Juneau, Alaska associated with the severe and escalating flood hazard from GLOFs originating in Suicide Basin. The intent of this project is to prevent water levels in Suicide Basin from reaching an elevation sufficient to produce enough hydraulic pressure against Mendenhall Glacier to initiate a GLOF event. The EWCP shall prevent water levels in the Suicide Basin GDL from rising above an elevation of 1,100 feet, NAVD88 while safely managing peak discharge rates of approximately 1,000 cubic feet per second (CFS) to protect downstream communities.
Project Background: The Mendenhall Valley in Juneau, Alaska, is subject to recurrent glacial lake outburst flood (GLOF) events. A GLOF is characterized by the rapid discharge of water from a glacier-dammed lake (GDL), which releases a high-volume surge of water downstream. The GLOF events affecting the Mendenhall Valley originate from Suicide Basin, an over-deepened bedrock depression dammed by the Mendenhall Glacier. Suicide Basin was formed by the retreat of the Suicide Glacier, a tributary that formerly joined the main Mendenhall Glacier. Suicide Basin GLOF events typically initiate shortly after the basin reaches maximum capacity and begins to overtop the surface of the Mendenhall Glacier, which is estimated to impound a pool at an elevation of 1,350 feet, North American Vertical Datum of 1988 (NAVD88) in the year 2026. The resulting floodwaters route subglacially beneath the Mendenhall Glacier, discharge into Mendenhall Lake, and flow down the Mendenhall River to its outlet at Fritz Cove. Following the release of water from a GLOF event, the pool elevation in Suicide Basin is about 980 feet, NAVD88. The water levels begin to increase again as Mendenhall Glacier impounds rainfall and ice melt runoff in Suicide Basin. Recent events suggest the basin is capable of filling and releasing a GLOF event at least once per year. Due to the dynamic nature of the system and glaciers, these elevations are subject to change. These GLOF events have been documented annually since 2011, with a marked escalation in peak discharge magnitude from 2023 through 2025. These recent high-flow events have resulted in severe inundation and significant damage within the City and Borough of Juneau, Alaska.
Industry Day: An Industry Day will be held in Juneau, Alaska on Friday, August 21, 2026. Please continue to monitor SAM.gov for more information about this upcoming event.
- CONTRACTING OFFICE KO 2204 3RD STREET
- ANCHORAGE , AK 99506-0898
- USA
- Jennifer Gosh
- jennifer.gosh@usace.army.mil
- Phone Number 9077532525
- Michelle Nelsen
- Michelle.Nelsen@usace.army.mil
- Phone Number 9077532527
- Aug 14, 2026 12:41 pm AKDTSolicitation (Updated)
- Aug 14, 2026 12:36 pm AKDT Solicitation (Original)
Related Document
| Aug 18, 2026 | [Solicitation (Updated)] Emergency Water Conveyance Prototype (EWCP) |
| Aug 26, 2026 | [Solicitation (Updated)] Emergency Water Conveyance Prototype (EWCP) |
| Sep 1, 2026 | [Solicitation (Updated)] Emergency Water Conveyance Prototype (EWCP) |
See Also
ITB 2027-801 URSA MAJOR ELEMENTARY SCHOOL REPLACEMENT ITB-1-DEMOLITION Click here to be added
Anchorage School District
Due by 10/01/2026
Status Ref# Project Close Date Dayes Left Action Open 2024 - 2034 Selected
ALASKA NATIVE TRIBAL HEALTH CONSORTIUM
Due by 1/01/2036
Project: On behalf of the Alutiiq Tribe of Old Harbor - site tour
ALASKA NATIVE TRIBAL HEALTH CONSORTIUM
Due by 9/28/2026
Project: Selected Construction Opportunities Ref. #: 2024 - 2034 Type: EOI Status: Open
ALASKA NATIVE TRIBAL HEALTH CONSORTIUM
Due by 12/31/2035