Contract No. 202684500 – 2026 Emergency Wastewater Repairs
May 19, 2026
General Statement of Work
The City and County of Denver Department of Transportation & Infrastructure Wastewater Management Division requires a 3-year long contract to perform wastewater emergency repair construction work. This contract will be utilized on an as-needed basis for multiple emergency repairs. Contract term is three years and the maximum contract amount is $3,000,000.00 (contract amount is no guarantee of work). All work needs to follow City and County of Denver specifications, standard details, and criteria. The following is a general outline and description of work for the Emergency Repair to Wastewater Facility project for WMD Construction Operations. The work includes any construction repairs on wastewater facilities (ponds, outfall, etc…), water quality facilities (ponds, outfalls, trash racks, etc…), and sewer (storm and sanitary conduits) components including, but not limited to:
Statement of Quantities (PDF, 38KB)
Maximum Capacity: $3,000,000.00.
Virtual Pre-Bid Meeting on May 28, 2026 at 10:00 a.m.
To access the meeting, please call 720-388-6219 and enter conference ID: 304 384 006# or join via
Microsoft Teams
.
Questions Deadline: June 4, 2026 at 10:00 a.m. local time.
Bid Opening on June 18, 2026 at 10:00 a.m.
Bids will be received and accepted via the online electronic bid service, Rocky Mountain E-Purchasing (“
BidNet
”). Prospective bidders must be on the plan holders list on BidNet for bids to be accepted. To access the electronic bid form, download the required documents from BidNet and complete the Unit Item Pricing in the Documents & Items section of the solicitation. All properly uploaded bids will then be opened, witnessed and read aloud. To access the bid opening teleconference, please call 720-388-6219 and enter conference ID: 273 692 513# or join via
Microsoft Teams
.
Plans Available May 19, 2026 – Digital Download – Solicitation No. 202684500
DSBO Goal: No Program
Prequalification: Each bidder must be prequalified in category 1A Heavy Civil at or above the $3,000,000.00 monetary level in accordance with the City’s Rules and Regulations Governing Prequalification of Contractors. Each bidder must have submitted a prequalification application a minimum of ten (10) calendar days prior to the response due date. Applications must be submitted via B2Gnow . To view the Rules and information on how to apply, please visit our website at www.denvergov.org/prequalification .
Contract Administrator: Micaela Martinez, DOTI.Procurement@denvergov.org
Prevailing Wage and Minimum Wage: Contracts for construction, reconstruction, and remodeling are subject to the City prevailing wage rate requirements established pursuant to Section 20-76, D.R.M.C. City contracts are subject to payment of City Minimum Wage established pursuant to Section 20-82 through 20-84 D.R.M.C.
As the City’s best interests may appear, the Executive Director of the Department of Transportation and Infrastructure reserves the right to waive informalities in, and to reject any or all, submittals.
Publication Date:
May 19, 2026
Published In:
Do Business with DOTI and BidNet
Pre-Bid Meeting: May 28, 2026, at 10:00 a.m.
Questions Deadline: June 4, 2026, at 10:00 a.m. local time.
Bid Opening on June 18, 2026, at 10:00 a.m.
Publication Date: May 19, 2026
Published In: Do Business with DOTI and BidNet
| ITEM NO. | DESCRIPTION | ESTIMATED | UNIT TYPE | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Labor | |||||||||||
| Labor | |||||||||||
| 1 | Estimator | 80 | HR | ||||||||
| 2 | Project Manager | 80 | HR | ||||||||
| 3 | Superintendent | 160 | HR | ||||||||
| 4 | Foreman | 160 | HR | ||||||||
| 5 | Erosion Control Supervisor | 40 | HR | ||||||||
| 6 | Engineer-Civil | 40 | HR | ||||||||
| 7 | Laborer Group 1Construction | 160 | HR | ||||||||
| 8 | Laborer Group 2 Construction | 160 | HR | ||||||||
| 9 | Common Laborer | 160 | HR | ||||||||
| 10 | Concrete Laborer | 160 | HR | ||||||||
| 11 | Landscape/Irrigation Laborer | 40 | HR | ||||||||
| 12 | Landscape Foreman | 40 | HR | ||||||||
| 13 | Pipelayer | 160 | HR | ||||||||
| 14 | Pipefitter | 160 | HR | ||||||||
| 15 | Carpenter: Concrete FormBuilding and Setting | 80 | HR | ||||||||
| 16 | Carpenter: Structures | 80 | HR | ||||||||
| 17 | Carpenter: Flat Work | 80 | HR | ||||||||
| 18 | Carpenter: Concrete All Other Work | 80 | HR | ||||||||
| 19 | Cement Mason | 80 | HR | ||||||||
| 20 | Concrete Finisher | 80 | HR | ||||||||
| 21 | Ironworker, Reinforcing | 80 | HR | ||||||||
| 22 | Master Electrician | 80 | HR | ||||||||
| 23 | Journeyman Electrician | 80 | HR | ||||||||
| 24 | Lift Station Mechanic | 80 | HR | ||||||||
| 25 | Master Plumber | 80 | HR | ||||||||
| 26 | Welder (Certified) | 80 | HR | ||||||||
| 27 | Backhoe Operator | 160 | HR | ||||||||
| 28 | Forklift Operator | 40 | HR | ||||||||
| 29 | Skid Loader Operator | 160 | HR | ||||||||
| 30 | Broom/Sweeper Operator | 40 | HR | ||||||||
| 31 | Motor Grader Operator (Rough and Finish) | 40 | HR | ||||||||
| 32 | Roller/Compactor Operator (Dirt and Grade Compaction) | 160 | HR | ||||||||
| 33 | 100-200 Ton Crane Operator | 40 | HR | ||||||||
| 34 | Excavator Operator (Mini, Small and Large Size) | 160 | HR | ||||||||
| 35 | Loader Operator (Mini, Small and Large Size) | 160 | HR |
CITY AND COUNTY OF DENVER
DEPARTMENT OF TRANSPORTATION AND INFRASTRUCTURE
STATEMENT OF QUANTITIES
UNIT
ESTIMATED
ITEM NO. DESCRIPTION TYPE
Labor
1 Estimator 80 HR
2 Project Manager 80 HR
3 Superintendent 160 HR
4 Foreman 160 HR
5 Erosion Control Supervisor 40 HR
6 Engineer-Civil 40 HR
7 Laborer Group 1Construction 160 HR
8 Laborer Group 2 Construction 160 HR
9 Common Laborer 160 HR
10 Concrete Laborer 160 HR
11 Landscape/Irrigation Laborer 40 HR
12 Landscape Foreman 40 HR
13 Pipelayer 160 HR
14 Pipefitter 160 HR
15 Carpenter: Concrete FormBuilding and Setting 80 HR
16 Carpenter: Structures 80 HR
17 Carpenter: Flat Work 80 HR
18 Carpenter: Concrete All Other Work 80 HR
19 Cement Mason 80 HR
20 Concrete Finisher 80 HR
21 Ironworker, Reinforcing 80 HR
22 Master Electrician 80 HR
23 Journeyman Electrician 80 HR
24 Lift Station Mechanic 80 HR
25 Master Plumber 80 HR
26 Welder (Certified) 80 HR
27 Backhoe Operator 160 HR
28 Forklift Operator 40 HR
29 Skid Loader Operator 160 HR
30 Broom/Sweeper Operator 40 HR
31 Motor Grader Operator (Rough and Finish) 40 HR
32 Roller/Compactor Operator (Dirt and Grade Compaction) 160 HR
33 100-200 Ton Crane Operator 40 HR
34 Excavator Operator (Mini, Small and Large Size) 160 HR
35 Loader Operator (Mini, Small and Large Size) 160 HR
Contract No. 202684500 SQ-1 May 19, 2026
2026 WMD Emergency Repair
| 36 | 40 | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| 37 | Fueler/Oiler | 40 | HR | ||||||||
| 38 | Tandem Dump Truck Driver | 160 | HR | ||||||||
| 39 | End Dump/Side Dump Semi Truck Driver | 160 | HR | ||||||||
| 40 | Lowboy Semi Truck Driver | 40 | HR | ||||||||
| 41 | Water Truck Driver | 40 | HR | ||||||||
| 42 | Traffic Control Flagger | 80 | HR | ||||||||
| 43 | Traffic Control Supervisor | 80 | HR | ||||||||
| 44 | Traffic Control Laborer | 80 | HR | ||||||||
| 45 | Uniform Traffic Control | 40 | HR | ||||||||
| 46 | Profile Epoxy Paint Truck Operator | 40 | HR | ||||||||
| 47 | Multi-Purpose Specialty & Hoisting TruckOperator/Driver | 40 | HR | ||||||||
| 48 | CCTV Inspection Foreman(This will only be used if CCD DOTI WMD TV crews are not able to assist on a project, and this price is based on linear footage of pipe TV'd) | 3200 | LF | ||||||||
| 49 | CCTV Inspection Operator (This will only be used if CCD DOTI WMD TV crews are not able to assist on a project, and this price is based on linear footage of pipe TV'd) | 3200 | LF | ||||||||
| 50 | CCTV Inspection Laborer(This will only be used if CCD DOTI WMD TV crews are not able to assist on a project, and this price is based on linear footage of pipe TV'd) | 3200 | LF | ||||||||
| 50 | |||||||||||
| 51 | Hydro-Excavation/Potholing Crew | 26 | HR | ||||||||
| 52 | Combination Vac/Jet Foreman (This will only be used if CCD DOTI WMD crews are not able to assist on a project, and this price is based on linear footage of pipe cleaned ) | 3200 | LF | ||||||||
| 53 | Combination Vac/Jet Operator (This will only be used if CCD DOTI WMD crews are not able to assist on a project, and this price is based on linear footage of pipe cleaned ) | 3200 | LF | ||||||||
| 54 | Combination Vac/Jet Laborer (This will only be used if CCD DOTI WMD crews are not able to assist on a project, and this price is based on linear footage of pipe cleaned ) | 3200 | LF | ||||||||
| 54 | |||||||||||
| 55 | Structural Engineer | 13 | HR | ||||||||
| 56 | Real Estate Attorney | 8 | HR | ||||||||
| 57 | Environmental Engineer | 13 | HR | ||||||||
| 58 | State of CO Certified Asbestos Building Inspector (CABI) | 13 | HR | ||||||||
| 59 | Asbestos Removal Laborer | 13 | HR | ||||||||
| 60 | Environmental Boring/Sampling Labor | 13 | HR | ||||||||
| 61 | Drill Rig Labor | 13 | HR | ||||||||
| 62 | Drill Rig Operator | 13 | HR | ||||||||
| 63 | Industrial Hygienist | 13 | HR | ||||||||
| 64 | Warranty, Performance and Payment Bonding for Duration of Project | 1 | LS | ||||||||
| Potential Subcontractor Work | |||||||||||
| 65 | Hot Mix Asphalt (HMA) (Patching) (CIP) | 1,000 | Tons |
CITY AND COUNTY OF DENVER
DEPARTMENT OF TRANSPORTATION AND INFRASTRUCTURE
36 Mechanic 40 HR
37 Fueler/Oiler 40 HR
38 Tandem Dump Truck Driver 160 HR
39 End Dump/Side Dump Semi Truck Driver 160 HR
40 Lowboy Semi Truck Driver 40 HR
41 Water Truck Driver 40 HR
42 Traffic Control Flagger 80 HR
43 Traffic Control Supervisor 80 HR
44 Traffic Control Laborer 80 HR
45 Uniform Traffic Control 40 HR
46 Profile Epoxy Paint Truck Operator 40 HR
47 Multi-Purpose Specialty & Hoisting TruckOperator/Driver 40 HR
CCTV Inspection Foreman(This will only be used if CCD DOTI
WMD TV crews are not able to assist on a project, and this price is 3200 LF
48 based on linear footage of pipe TV'd)
CCTV Inspection Operator (This will only be used if CCD DOTI
WMD TV crews are not able to assist on a project, and this price is 3200 LF
49 based on linear footage of pipe TV'd)
CCTV Inspection Laborer(This will only be used if CCD DOTI
WMD TV crews are not able to assist on a project, and this price is 3200 LF
50 based on linear footage of pipe TV'd)
51 Hydro-Excavation/Potholing Crew 26 HR
Combination Vac/Jet Foreman (This will only be used if CCD
DOTI WMD crews are not able to assist on a project, and this 3200 LF
52 price is based on linear footage of pipe cleaned )
Combination Vac/Jet Operator (This will only be used if CCD
DOTI WMD crews are not able to assist on a project, and this 3200 LF
53 price is based on linear footage of pipe cleaned )
Combination Vac/Jet Laborer (This will only be used if CCD
DOTI WMD crews are not able to assist on a project, and this 3200 LF
54 price is based on linear footage of pipe cleaned )
55 Structural Engineer 13 HR
56 Real Estate Attorney 8 HR
57 Environmental Engineer 13 HR
58 State of CO Certified Asbestos Building Inspector (CABI) 13 HR
59 Asbestos Removal Laborer 13 HR
60 Environmental Boring/Sampling Labor 13 HR
61 Drill Rig Labor 13 HR
62 Drill Rig Operator 13 HR
63 Industrial Hygienist 13 HR
Warranty, Performance and Payment Bonding for Duration of
1 LS
64 Project
Potential Subcontractor Work
65 Hot Mix Asphalt (HMA) (Patching) (CIP) 1,000 Tons
Contract No. 202684500 SQ-2 May 19, 2026
2026 WMD Emergency Repair
| 202-00208 | REMOVAL AND RESET FLAGSTONE (INCLUDES SALVAGE AND STORAGE) | 5 | SY | ||
|---|---|---|---|---|---|
| 203-00000 | UNCLASSIFIED EXCAVATION | 600 | CY | ||
| 203-02330 | 3-man subcontractor labor crew | 80 | HR | ||
| 16-3 | Chain Link Fence | 240 | LF | ||
| 202-01000 | REMOVAL OF FENCE | 100 | LF | ||
| 202-00019 | REMOVAL OF INLET | 5 | EA | ||
| 202-00033 | REMOVAL OF SIPHON (excludes connecting inlets) | 5 | EA | ||
| 12.1.6a | COMBINATION CURB, GUTTER &SIDEWALK (4'-11") | 200 | LF | ||
| 202-00200 | REMOVAL OF SIDEWALK | 600 | SY | ||
| 202-00201 | REMOVAL OF CURBHEAD | 80 | LF | ||
| 202-00203 | REMOVAL OF CURB AND GUTTER | 600 | LF | ||
| 202-00204 | REMOVAL OF COMBINATION CURB, GUTTER AND SIDEWALK | 600 | LF | ||
| 202-00210 | REMOVAL OF CONCRETE PAVEMENT | 320 | SY | ||
| 210-04020 | RESET INLET GRATE,FRAME, AND ADJUSTABLE CURB BOX (NEW CASTING) | 5 | EA | ||
| 412-00400 | 4" CONCRETEPAVEMENT | 100 | SY | ||
| 412-00600 | 6" CONCRETE PAVEMENT | 100 | SY | ||
| 412-00800 | 8" CONCRETE PAVEMENT | 250 | SY | ||
| 412-01000 | 10" CONCRETE PAVEMENT | 100 | SY | ||
| 412-01200 | 12" CONCRETE PAVEMENT | 100 | SY | ||
| 413-00100 | CONCRETE PATCHING (STRUCTURAL SURFACE REPAIR <2" DEPTH) | 20 | SF-IN | ||
| 601-00100 | PAVESTONE STACKED PRE-CAST WALL BLOCK | 50 | SF | ||
| 601-00400 | REINFORCED VARIABLE HEIGHT CONCRETE RETAINING WALL | 50 | SF | ||
| 601-06150 | CONCRETE PATCHING (STRUCTURAL CURB REPAIR) | 50 | LF | ||
| 608-00000 | CONCRETE SIDEWALK | 50 | SY | ||
| 608-00010 | CONCRETE CURB RAMP | 50 | SY | ||
| 608-00018 | TRUNCATED DOMES (SPECIAL CAST IRON) MATERIAL ONLY | 90 | SF | ||
| 609-20000 | CONCRETE GUTTER OVERLAY | 100 | LF | ||
| 609-21020 | CURB & GUTTER TYPE II, SECTION 2B | 160 | LF | ||
| 609-21023 | CURB & GUTTER TYPE IIB (9") CURBHEAD | 100 | LF | ||
| 609-22021 | COMBINATION CURB, GUTTER & SIDEWALK (2'-8") | 100 | LF | ||
| 609-22025 | COMBINATION CURB, GUTTER & SIDEWALK (3'-11") | 100 | LF | ||
| 610-00026 | MEDIAN COVER MATERIAL (6" PATTERNED COLORED CONCRETE) | 40 | SY | ||
| Allowance Accounts | |||||
| 01- 21.13.01A | Water Treatment Equipment | 1 | AA$ |
CITY AND COUNTY OF DENVER
DEPARTMENT OF TRANSPORTATION AND INFRASTRUCTURE
202-00220 REMOVAL OF ASPHALT MAT 500 SY
REMOVAL AND RESET FLAGSTONE (INCLUDES
5 SY
202-00208 SALVAGE AND STORAGE)
203-00000 UNCLASSIFIED EXCAVATION 600 CY
203-02330 3-man subcontractor labor crew 80 HR
16-3 Chain Link Fence 240 LF
202-01000 REMOVAL OF FENCE 100 LF
202-00019 REMOVAL OF INLET 5 EA
202-00033 REMOVAL OF SIPHON (excludes connecting inlets) 5 EA
12.1.6a COMBINATION CURB, GUTTER &SIDEWALK (4'-11") 200 LF
202-00200 REMOVAL OF SIDEWALK 600 SY
202-00201 REMOVAL OF CURBHEAD 80 LF
202-00203 REMOVAL OF CURB AND GUTTER 600 LF
REMOVAL OF COMBINATION CURB, GUTTER AND
600 LF
202-00204 SIDEWALK
202-00210 REMOVAL OF CONCRETE PAVEMENT 320 SY
RESET INLET GRATE,FRAME, AND ADJUSTABLE CURB
5 EA
210-04020 BOX (NEW CASTING)
412-00400 4" CONCRETEPAVEMENT 100 SY
412-00600 6" CONCRETE PAVEMENT 100 SY
412-00800 8" CONCRETE PAVEMENT 250 SY
412-01000 10" CONCRETE PAVEMENT 100 SY
412-01200 12" CONCRETE PAVEMENT 100 SY
CONCRETE PATCHING (STRUCTURAL SURFACE REPAIR
20 SF-IN
413-00100 <2" DEPTH)
601-00100 PAVESTONE STACKED PRE-CAST WALL BLOCK 50 SF
REINFORCED VARIABLE HEIGHT CONCRETE RETAINING
50 SF
601-00400 WALL
601-06150 CONCRETE PATCHING (STRUCTURAL CURB REPAIR) 50 LF
608-00000 CONCRETE SIDEWALK 50 SY
608-00010 CONCRETE CURB RAMP 50 SY
TRUNCATED DOMES (SPECIAL CAST IRON) MATERIAL
90 SF
608-00018 ONLY
609-20000 CONCRETE GUTTER OVERLAY 100 LF
609-21020 CURB & GUTTER TYPE II, SECTION 2B 160 LF
609-21023 CURB & GUTTER TYPE IIB (9") CURBHEAD 100 LF
609-22021 COMBINATION CURB, GUTTER & SIDEWALK (2'-8") 100 LF
609-22025 COMBINATION CURB, GUTTER & SIDEWALK (3'-11") 100 LF
MEDIAN COVER MATERIAL (6" PATTERNED COLORED
40 SY
610-00026 CONCRETE)
Allowance Accounts
01-
1 AA$
21.13.01A Water Treatment Equipment
Contract No. 202684500 SQ-3 May 19, 2026
2026 WMD Emergency Repair
| 01- 21.13.01C | All Construction Equipment | 1 | AA$ | ||
|---|---|---|---|---|---|
| 01- 21.26.05A | Water Works | 1 | AA$ | ||
| 01- 21.26.05B | Stone/Aggregates | 1 | AA$ | ||
| 01- 21.26.05C | Concrete/Masonry Products/Forms/Reinforcing Steel | 1 | AA$ | ||
| 01- 21.26.05D | Asphalt materials | 1 | AA$ | ||
| 01- 21.26.05E | Pre-Cast Materials/Reinforced Concrete Pipe and Manholes | 1 | AA$ | ||
| 01- 21.26.05F | ReinforcedPolymer Mortar Pipe Materials | 1 | AA$ | ||
| 01- 21.26.05G | Landscape Products/Materials | 1 | AA$ | ||
| 01- 21.26.05H | Truck Lining and Miscellaneous Environmental Controls Associated with Hauling of Construction Debris & Contaminated Material | 1 | AA$ | ||
| 01- | Erosion Control Measures (Materials Only) | 1 | AA$ | ||
| 21.26.05I | |||||
| 01- | Water Treatment Filter Media, Consumables | 1 | AA$ | ||
| 21.26.05J | |||||
| Textura | Textura Fee = $6,435.00 | 1 | LS |
CITY AND COUNTY OF DENVER
DEPARTMENT OF TRANSPORTATION AND INFRASTRUCTURE
01-
1 AA$
21.13.01B Traffic Control Rental Equipment, Devices, Etc
01-
1 AA$
21.13.01C All Construction Equipment
01-
1 AA$
21.26.05A Water Works
01-
1 AA$
21.26.05B Stone/Aggregates
01-
1 AA$
21.26.05C Concrete/Masonry Products/Forms/Reinforcing Steel
01-
1 AA$
21.26.05D Asphalt materials
01-
1 AA$
21.26.05E Pre-Cast Materials/Reinforced Concrete Pipe and Manholes
01-
1 AA$
21.26.05F ReinforcedPolymer Mortar Pipe Materials
01-
1 AA$
21.26.05G Landscape Products/Materials
Truck Lining and Miscellaneous Environmental Controls
01- Associated with Hauling of Construction Debris & Contaminated 1 AA$
21.26.05H Material
01-
1 AA$
21.26.05I Erosion Control Measures (Materials Only)
01-
1 AA$
21.26.05J Water Treatment Filter Media, Consumables
Textura Textura Fee = $6,435.00 1 LS
Contract No. 202684500 SQ-4 May 19, 2026
2026 WMD Emergency Repair
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
2026 Emergency Wastewater Repairs Closing date August 27, 2026, 01:00 PM Reference number
City of Denver
Bid Due: 8/27/2026
Description: Kenosha Pass Replacement Tower Department: CDPS - Division of Homeland Security &
State Government of Colorado
Bid Due: 8/19/2026
Bid Number: 26-012 Bid Title: Rotary Park Pump House Replacement Category: Construction and
City of Montrose
Bid Due: 8/19/2026
General Information Document ID DQ1-CFCA-2027000045-1 Status Open Description Cable TV Call Out Repair
State Government of Colorado
Bid Due: 8/10/2026