Emergency Slide Repair on SR 178 approximately 0.66 miles south of CR 121, known as Federal Aid Project No. STBG-2906-00(008) / 110153301 in Union County. Project Completion: 8/21/2026

Agency: State Government of Mississippi
State: Mississippi
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237990 - Other Heavy and Civil Engineering Construction
Posted Date: Jun 2, 2026
Due Date: Jun 5, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Call Description Proposal EBS File Addenda EBS Amendment Petroleum Prices Bid List Cadd Files Plan Index permit doc Bid Tabulations
01 Emergency Slide Repair on SR 178 approximately 0.66 miles south of CR 121, known as Federal Aid Project No. STBG-2906-00(008) / 110153301 in Union County.
Project Completion: 8/21/2026
1
1
Request to Bid

Attachment Preview

Marshall
SR 311 over Little Coldwater River
(#11.8) STBG-0035-01(011);
110039-301000
Corps of Engineers Nationwide 3
MDEQ Water Quality Certification

Location Maps

Name: MT PLEASANT Location: 034 degrees 56' 39.9591" N, 089 degrees 30' 43.4638" W Date: 01/22/26 Marshall County Revetment Project SR 311 Scale: 1 inch = 2,000 ft. FMS 110039/301000 (C) Copyright 2016, Trimble Navigation Limited

Name: MT PLEASANT Location: 034 degrees 56' 39.9591" N, 089 degrees 30' 43.4638" W
Date: 01/22/26 Marshall County Revetment Project SR 311
Scale: 1 inch = 2,000 ft. FMS 110039/301000
(C) Copyright 2016, Trimble Navigation Limited

Roadway and Bridge Plans

39'-6" Elevation Top of Riprap 398' Elevation Top of Riprap 395' 40'-0" 39'-6"
B B 2:1 2:1 i o n "0-'06 A
2:1 2:1
"0-'05
39'-6"
Flow 40'-0" 39'-6"

2
1
430'
425'
420'
415'
410'
405'
400'
395'
390'
2'-6"
A A
Flow
RIPRAP PLACEMENT PLAN
"0-'4
2
m '
-
Elevation Top of i n 6
"
.
Riprap 415'
Fill material excavated
10'-0"
Elevation Top of
Riprap 398'
Elevation Top of
Riprap 395'
Geotextile Fabric
under Riprap
39'-6" 40'-0" 39'-6"
1 2 3 4
SECTION B-B
SECTION A-A
NOTE:
level any low spots as instructed by the project engineer.
This work shall be considered as an absorbed item in the
bank reshaping pay item.
Right of Way
B B
10'-0"
(typ.)
2:1 2:1 2:1 2:1
ii Approach Ro
39'-6" 40'-0" 39'-6"
1 2 3 4
"0-'06
"0-'05
N
o
t
F
o
r
C
o
n
s
t
r
u
c
t
i
o
n

2:1 2:1 t i o n "0-'06
2:1 2:1
10'-0"
"0-'05
39'-6"
Flow 40'-0" 39'-6"

NOTE:
1. No dirt can be pushed into the channel.
2. If a platform for working is needed, then riprap may be used.
3. Minimize disturbance to the existing banks.
4. Turbidity curtain may be required.
10'-0"
(typ.)
2:1 2:1 2:1 2:1
ii Approach Ro
Flow
39'-6" 40'-0" 39'-6"
1 2 3 4
RIPRAP PLACEMENT PLAN
"0-'06
"0-'05
N
o
t
F
o
r
C
o
n
s
t
r
u
c
t
i
o
n
Right of Way

N
o
t
F
o
r
C
o
n
s
t
r
u
c
t
i
o
n

Permit Conditions

Conditions
NATIONWIDE PERMIT No. 3
Maintenance
(a) The repair, rehabilitation, or replacement of any previously authorized,
currently serviceable structure or fill, or of any currently serviceable structure or fill
authorized by 33 CFR 330.3, provided that the structure or fill is not to be put to uses
differing from those uses specified or contemplated for it in the original permit or the
most recently authorized modification. Minor deviations in the structure's configuration
or filled area, including those due to changes in materials, construction techniques,
requirements of other regulatory agencies, or current construction codes or safety
standards that are necessary to make the repair, rehabilitation, or replacement are
authorized. This NWP also authorizes the removal of previously authorized structures or
fills. Any stream channel modification is limited to the minimum necessary for the repair,
rehabilitation, or replacement of the structure or fill; such modifications, including the
removal of material from the stream channel, must be immediately adjacent to the
project. This NWP also authorizes the removal of accumulated sediment and debris
within, and in the immediate vicinity of, the structure or fill. This NWP also authorizes the
repair, rehabilitation, or replacement of those structures or fills destroyed or damaged by
storms, floods, fire or other discrete events, provided the repair, rehabilitation, or
replacement is commenced, or is under contract to commence, within two years of the
date of their destruction or damage. In cases of catastrophic events, such as hurricanes
or tornadoes, this two-year limit may be waived by the district engineer, provided the
permittee can demonstrate funding, contract, or other similar delays.
(b) This NWP also authorizes the removal of accumulated sediments and debris
outside the immediate vicinity of existing structures (e.g., bridges, culverted road
crossings, water intake structures, etc.). The removal of sediment is limited to the
minimum necessary to restore the waterway in the vicinity of the structure to the
approximate dimensions that existed when the structure was built, but cannot extend
farther than 200 feet in any direction from the structure. This 200 foot limit does not
apply to maintenance dredging to remove accumulated sediments blocking or restricting
outfall and intake structures or to maintenance dredging to remove accumulated
sediments from canals associated with outfall and intake structures. All dredged or
excavated materials must be deposited and retained in an area that has no waters of
the United States unless otherwise specifically approved by the district engineer under
separate authorization.
(c) This NWP also authorizes temporary structures, fills, and work, including the
use of temporary mats, necessary to conduct the maintenance activity. Appropriate
measures must be taken to maintain normal downstream flows and minimize flooding to
the maximum extent practicable, when temporary structures, work, and discharges of
dredged or fill material, including cofferdams, are necessary for construction activities,
access fills, or dewatering of construction sites. Temporary fills must consist of
materials, and be placed in a manner, that will not be eroded by expected high flows.
After conducting the maintenance activity, temporary fills must be removed in their

entirety and the affected areas returned to pre-construction elevations. The areas
affected by temporary fills must be revegetated, as appropriate.
(d) This NWP does not authorize maintenance dredging for the primary purpose
of navigation. This NWP does not authorize beach restoration. This NWP does not
authorize new stream channelization or stream relocation projects.
Notification: For activities authorized by paragraph (b) of this NWP, the permittee
must submit a pre-construction notification to the district engineer prior to commencing
the activity (see general condition 32). The pre-construction notification must include
information regarding the original design capacities and configurations of the outfalls,
intakes, small impoundments, and canals. (Authorities: Section 10 of the Rivers and
Harbors Act of 1899 and Section 404 of the Clean Water Act (Sections 10 and 404))
Note: This NWP authorizes the repair, rehabilitation, or replacement of any
previously authorized structure or fill that does not qualify for the Clean Water Act
Section 404(f) exemption for maintenance.

This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Procurement Details Smart Number 1701-27-R-IFBD-00004 Advertised Date 07/22/2026 12:00 AM RFx # 3160008165

State Government of Mississippi

Bid Due: 8/27/2026

IFB 3756 - Fire Protection Central Core THE UNIVERSITY OF MISSISSIPPI MEDICAL CENTER

University of Mississippi Medical Center

Bid Due: 8/13/2026

Follow B1806 Repair Control Tower HVAC Active Contract Opportunity Notice ID FA302226R0017 Related

DEPT OF DEFENSE

Bid Due: 8/17/2026

Follow Aircrew Flight Equipment Service FY27 - (Columbus Air Force Base, Columbus MS)

DEPT OF DEFENSE

Bid Due: 8/07/2026