PROJECT INFORMATION SHEET
CONSTRUCTION - GENERAL CONTRACTOR/TRADE CONTRACTOR
INVITATION TO BID
ELIGIBLE PREQUALIFIED BIDDERS: The following Contractors are prequalified and may submit a bid for
this Project:
• All State Construction Inc
• BRD Builders LLC
• Carlin Construction Company, LLC
• Connecticut Carpentry Corporation
• Daniel O'Connells Sons Inc
• DEF Services Group, Ltd
• Dimeo Construction Company
• Diversity Construction Group
• Downes Construction Company
• G. Donovan Associates, Inc.
• JLY Enterprises LLC
• KBE Building Corporation
• Kronenberger & Sons Restoration LLC
• Lee Kennedy Co., Inc.
• Loureiro Building Construction, LLC
• Mattern Construction, Inc.
• Noble Construction & Management Inc
• Nosal Builders, Inc.
• O&G Industries, Inc.
• Pat Munger Construction Company, Inc.
• Richards Corporation
• Sarazin General Contractors, Inc.
• Scope Construction Company Inc.
• The Associated Construction Company
• The Morganti Group, Inc.
• The Whiting-Turner Contracting Company
• Turner Construction Company
• Western Buiders, Inc.
• Wohlsen Construction Company, Inc.
• Zlotnick Construction
Construction GC-Trade ITB, July 2024
Page 1 of 2
PROJECT SCHEDULE/DURATION:
• Anticipated Contract Issuance/Notice to Proceed: February 2026
• Construction is planned to start: March 16, 2026
• Project Duration: 12 weeks
PROJECT DESCRIPTION/SCOPE OF WORK:
The work consists of demolition and disposal of existing building components and equipment not
limited to mechanical units and their CFC’s, and furniture and supplies within the building. Removal of existing
light and pole for owner reuse, and removal and disposal of light pole base. Removal and disposal of
sidewalks, and abandoned utility infrastructure below grade. Piers shall be cut down and disposed. Excavate
and grade area to allow for expansion of the parking lot. Install new subgrade and bituminous in accordance
with the construction documents, install new existing topsoil to be removed, transported, stockpiled,
reloaded, transported and placed back on the project site.
Contractor shall provide test pits, soil samples and testing results as outlined in the construction
documents for Engineer of Record’s review of the soil characterization prior to proceeding with excavation.
Excavate material to the depth outlined within the construction documents, load, deliver and dispose of
material off-site to regulated facilities identified by the contractor in support of the in-scope quantity
allowances.
A note to all contractors: A portion of the building parcel has a landfill liner cap at certain depths.
Contractors are to use extreme care when working in the area of the liner cover system to avoid damage to
it. Hand digging is to be assumed to prevent damaging the integrity of the cover system during all work,
including but not limited to demolition of the building, cutting of existing piers, removal of abandoned
utilities, and excavation to subgrade for new construction.