300285 ELUR – Lots F & C Building Demolition / Parking Lot

Agency: University of Connecticut
State: Connecticut
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237310 - Highway, Street, and Bridge Construction
  • 238910 - Site Preparation Contractors
  • 238990 - All Other Specialty Trade Contractors
Posted Date: Nov 25, 2025
Due Date: Dec 23, 2025
Solicitation No: 300285
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
300285 ELUR – Lots F & C Building Demolition / Parking Lot
Number 300285
Open 11/25/2025
Close 12/23/2025 2:00 PM EDT
Type ITB - Invitation to Bid
Pre-Bid
Non-Mandatory

12/03/2025 10:00 AM EDT

3 Discovery Drive, Purchasing Bid Room
Storrs, Connecticut 06269
United States
Map It

RFI
12/10/2025 2:00 PM
Contact Chris Peters chris.peters@uconn.edu (860) 486-6324
Details Only previously prequalified contractors may submit a bid for this project.
Documents 300172-Solicitation-Information-Sheet-1 .pdf

.pdf

Attachment Preview

SOLICITATION INFORMATION SHEET
CONSTRUCTION - CONSTRUCTION MANAGER AT RISK
REQUEST FOR STATEMENT OF QUALIFICATIONS
The University of Connecticut is accepting Statement of Qualifications for:
RFQ RELEASE DATE: November 10, 2025
PROJECT NUMBER: 300172
PROJECT NAME:
New Commissary Building
PROJECT LOCATION: Storrs Campus – W-Lot
PROCUREMENT AGENT: Cesar Alonzo, cesar.alonzo@uconn.edu, (860) 486-0012
INTENT OF THIS SOLICITATION: The purpose of this Request for Qualifications (“RFQ”) is to solicit
experienced Construction Manager at Risk companies to provide pre-construction, planning, and
construction services construct a New Commissary Building at the Storrs Campus W Lot that is
approximately 28,800 gross square feet in size.
LOCATION OF THIS SOLICITATION: Submit a Statement of Qualifications (“Proposal”) for this solicitation
through the HuskyBuy Portal:
https://bids.sciquest.com/apps/Router/PublicEvent?CustomerOrg=UConnFullSuite.
SBE/MBE PARTICIPATION: The University of Connecticut is committed to providing a professionally
inclusive environment within which small and minority businesses are encouraged to participate in the
procurement experience. As such, we encourage participation by Small (SBE) businesses, Minority-Owned
(MBE) businesses, Woman-Owned (WBE) businesses, and businesses owned by persons with a disability
(DisBE), certified as such by the Connecticut’s Department of Administrative Services Supplier Diversity
Division. For further information, visit: https://portal.ct.gov/DAS/Services/Licensing-Certification-
Permitting-and-Codes/Small-Minority-Business-Center. To learn about the University of Connecticut’s
Supplier Diversity Program, visit: https://supplierdiversity.ubs.uconn.edu. Additionally, the University
encourages Connecticut-based businesses to participate in this public solicitation process.
CRITICAL DATES:
Pre-Proposal Conference Date and Time
Pre-Proposal Conference Location
Q&A (RFI) Due Date and Time
November 18, 2025
10:00 am
PURCHASING BID ROOM, 3 DISCOVERY DRIVE,
STORRS CT 06238
December 3, 2025
2:00 pm
CPFP Construction CM RFQ July 2024
Page 1 of 4
Proposal Due Date and Time
December 11, 2025
2:00 pm
PRE-PROPOSAL CONFERENCE: During the Pre-Proposal Conference, the RFQ and Scope of Work will be
discussed. There also will be an opportunity to view existing conditions (if applicable). The Pre-Proposal
Conference is not mandatory, however, interested Proposers are strongly encouraged to attend.
There are limited short-term and PayByPhone parking spaces around the University Business Services
building. The North Parking Garage is recommended to all vendors as parking on campus is at your own
risk. The North Garage parking is paid via online app (PaybyPhone or Flowbird) or at a kiosk and is required
when
parking
vehicle
and
not
when
exiting
the
garage.
REQUEST FOR INFORMATION QUESTIONS: All Requests for Information (“RFI”) questions are to be posted
under the Q&A Board Tab in the HuskyBuy sourcing event for this Solicitation. No phone calls or RFI
questions emailed directly to the Procurement Agent will be accepted.
CLARIFICATIONS, ADDENDA, and INTERPRETATIONS: Proposers shall promptly notify the University of
any ambiguity, inconsistency, or error which they may discover upon examination of the contract
documents.
Any and all interpretations of the RFI Responses, contract documents, and supplemental instructions, will
be in the form of a clarification/addendum, and posted as part of the HuskyBuy sourcing event. Failure of
a Proposer to receive such clarification/addendum or interpretation shall not release a Proposer from the
obligations under its Proposal as submitted.
CONSIDERATION OF PROPOSALS: This is a two-part Quality-Based Selection solicitation process. During
the first part, a Proposer shall demonstrate, to the satisfaction of the University, that they possess the
proven financial ability, managerial ability, technical ability, and the integrity, necessary to perform the
Scope of Work faithfully and efficiently for this Project, without conflict of interest. Proposals shall be
evaluated utilizing the objective technical criteria listed within the RFQ, as well as any additional
information obtained from persons or other sources identified in the Proposal with the intent of
developing a shortlist of qualified Proposers.
During the second part of the process, the short-listed Proposers are invited to submit a Cost Proposal
during the Request for Proposal phase. The University may choose to interview t h e short-listed
Proposers as part of the selection process; however, the Proposer should not assume interviews will be
conducted. The technical proposal shall be a “stand-alone” document and may be the sole basis of
selection.
PROJECT SCHEDULE/DURATION:
Anticipated Contract Issuance/Notice to Proceed: March 1, 2026
Construction is planned to start: March 1, 2027
Construction Duration: 15 months
PROJECT DESCRIPTION/SCOPE OF WORK: The project will construct a New Commissary Building at W Lot
that is approximately 28,800 gross square feet in size.
CPFP Construction CM RFQ July 2024
Page 2 of 4
Site elements will include site utilities, emergency generator, tractor trailer delivery access, landscape,
hardscape and regrading to adjacent parking areas.
Program elements include but are not limited to a central kitchen, bulk freezers, bulk refrigeration, bulk dry
storage, loading docks, shipping/receiving, Husky Harvest Food Pantry, coffee production, test kitchen, bakery
sales, dish room/pot wash, offices, conference room, laundry and support spaces (ie locker rooms, restrooms,
elevator, stairs, janitorial, MEP tel/data rooms, equipment maintenance room, etc.)
QUALIFICATIONS OF PROPOSER: All Proposers must provide information/documentation with their
submission that demonstrates the following:
- DAS CLASSIFICATION: Proposers must be prequalified by the Department of Administrative Services
in the specified classification for this Project (CONSTRUCTION MANAGER AT RISK GROUP (B OR C))
as of the due date of the RFQ.
- FINANCIAL ABILITY: The Proposer must demonstrate the financial ability and bonding capacity to
complete a construction project with a minimum value of at least $23,000,000. See the Financial
Ability Prequalification Requirements Document for further information.
- NARRATIVE OF PROJECT APPROACH: Prepare a Narrative that demonstrates your Company’s
understanding of the Scope of Work for this Project. Concisely present an approach that includes the
following:
a. Technical Approach: Describe your Company’s approach, which demonstrates your understanding of
the needs of this Project, including your Company's process for completing a Scope of Work within a
proposed schedule, including Pre-Construction and Construction activities.
b. Quality Assurance/Quality Control: Describe your Company’s process and procedure for managing
and assuring quality during construction activities.
c. Cost Control and Budgeting: Describe your Company’s approach to developing both project and
construction cost estimates and managing costs once budgets are developed.
d. Supplier Diversity: Describe your Company’s approach to meeting the set-aside goals and CHRO
requirements for this Project.
e. If submitting as a joint venture, describe the proposed joint venture arrangement between the
joint venture partners.
- PREVIOUS RELEVANT EXPERIENCE: Describe the overall qualifications of the Proposer, including
background in this field and the services that it provides. Utilize the Previous Relevant Experience Form,
Const CM-RFQ provided with this RFQ.
a. It is recommended that the Proposer provide three (3) examples of projects that are in progress or
completed within the past ten (10) years, comparable in size, scope, and similar environment to this
Project, with an emphasis on primary scope of food service and extensive kitchen equipment
installation.
b. It is recommended that the examples have a construction value of $15,000,000.
c. A detailed description of the work performed and how it relates to the Scope of Work outlined in
the RFQ shall be included.
d. Projects with any information on the Form stated as “confidential” may not be considered.
e. If a joint venture is proposed, provide project examples demonstrating that the joint venture
partners have worked together. Include a description and percentage of the work performed by
each joint venture partner.
CPFP Construction CM RFQ July 2024
Page 3 of 4
- PROPOSED TEAM QUALIFICATIONS: The Proposer must demonstrate the ability to staff the Project
with high quality, experienced personnel. Describe the qualifications and responsibilities of the key
personnel who will be assigned to the Project including their experience on similar assignments and
their specific responsibilities for the proposed Project. Utilize the Resume for Proposed Key Personnel,
Const-RFQ/ITB provided with this RFQ.
a. It is recommended that the Proposer provide Resumes for the following positions: Project
Executive, Project Manager, and Project Superintendent. Only provide resumes for the key project
team; do not include resumes for personnel not assigned to the team.
b. Provide an Organizational Chart that identifies the primary team members’ roles, including any
subconsultants for this Project.
MISCELLANEOUS REQUIRED DOCUMENTS: The Proposal shall include the following documents:
1. Supplier Diversity Certificate: If certified, provide your Company’s current Supplier Diversity Certificate
issued by the Connecticut Department of Administrative Services.
2. Joint Venture Agreement: If a joint venture is proposed, provide the Joint Venture Agreement.
CONTRACT: A draft of the contract has been provided with the solicitation documents. The University
reserves the right to modify the contract or waive any informality as it deems to be in the best interest of
the University. By submitting a Proposal, your Company accepts the contract and any modifications that
the University deems necessary to it without exception. Proposers will be notified of any modifications
to the contract made by the University. Any exceptions to the contract submitted by the Proposer will
not be considered.
JOINT VENTURE: If submitting as a joint venture, a new HuskyBuy Vendor Profile must be created with
the joint venture company name and the Proposal must be submitted under this profile; it cannot be
submitted under one of the joint venture partners’ profile.
SELF-PERFORMANCE REQUIREMENT: The Construction Manager At-Risk is not permitted to complete
any portion of the construction work with its own forces. The Construction Manager is responsible for
developing subcontractor bid packages, conducting a solicitation process for each established bid
package, and contracting with the subcontractors to complete the construction work.
SET-ASIDE REQUIREMENTS: The Set-Aside Requirement for this Project is that (1) not less than thirty
percent (30%) of the Guaranteed Maximum Price be awarded to subcontractors who are certified by the
Connecticut Department of Administrative Services as “Small Business Enterprises” (“SBEs”) and (2) not
less than ten percent (10%) of the Guaranteed Maximum Price be awarded to subcontractors who are
certified by the Connecticut Department of Administrative Services as “Minority Business Enterprises”
(“MBEs”) (the 10% set aside for MBEs may be included in the 30% set aside for SBEs). The Construction
Manager is responsible for ensuring that the S/MBEs they have selected are eligible Connecticut-certified
S/MBE contractors.
End of Solicitation Information Sheet
CPFP Construction CM RFQ July 2024
Page 4 of 4
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Roof Replacement at Glastonbury EMS Building The Town of Glastonbury is requesting proposals

State Government of Connecticut

Bid Due: 6/04/2026

Invitation to Bid for Construction Services Troop H Maintenance Facility Repairs 100R Washington

State Government of Connecticut

Bid Due: 7/07/2026

Advancing Resilience Recommendations in the West Beach/Coral Sands/Pilots Point The purpose of this

State Government of Connecticut

Bid Due: 6/16/2026

Invitation to Bid for Construction Services HCC New Roof Installation 287 West Street

State Government of Connecticut

Bid Due: 6/24/2026