ELPS, MSU PH III, And Towner Road Pathways Contract Book
| Agency: | Meridian charter township |
|---|---|
| State: | Michigan |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jul 31, 2026 |
| Due Date: | Aug 19, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Department: Public Works
Start Date: 07/31/2026
Close Date: 08/19/2026 11:00 am
For more details, view the Contract Book and Plans linked below:
- ELPS, MSU PH III, And Towner Road Pathways Contract Book
- MSU To Lake Lansing Phase III Land Preserve Pathway Plans
- Towner Road Pathway Plans
- ELPS Admin Building Pathway Plans
Â
Attachment Preview
| UTILITY COMPANY UTILITIES MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY AT&T TELEPHONE 337 N. ABBOTT, RM. 201 CONSTRUCTION PLANS EAST LANSING, MI 48823 517.337.3660 FOR CONSUMERS ENERGY GAS 530 W. WILLOW ST. ELECTRIC MERIDIAN TOWNSHIP N P.O. BOX 30162 LANSING, MI 48909 . INGHAM COUNTY, MICHIGAN R 517.373.6100 D E COMCAST CABLE TV K A 1070 TROWBRIDGE ROAD STANDARD CONSTRUCTION NOTES L EAST LANSING, MI 48823 PARK ST. 517.332.1012 1. The Contractor shall notify the Charter Township of Meridian, Department of Public Works, Office of Engineering 517-853-4440 a minimum of 72 hours prior to the start of construction of public utilities or of MERIDIAN TOWNSHIP WATER MAINS construction within the public right-of-way. 5151 MARSH RD. SANITARY SEWER 2. All construction shall conform to the current standards and specifications of the Charter Township of R. OKEMOS, MI 48864 PATHWAYS R. Meridian which are included as part of these plans in effect at the time of construction. 517.853.4440 N .DR R E 3. After the completion of construction of public utilities or construction within public right-of-way, the T LAKE LANSING S WOLVERINE PIPE LINE PETROLEUM PIPELINE contractor must request a final inspection. Any punchlist items resulting from the final inspection must be E W 8105 VALLEYWOOD LANE resolved prior to final release and acceptance. HSRAM K N PORTAGE, MI 49024-5251 U 4. The existing utilities indicated on the plans are in accordance with available information. It shall be the R 231.323.2491 T contractor's obligation to verify the exact location of all existing utilities, which might affect this job. D N A R INGHAM COUNTY DRAIN DRAINS 5. The contractor shall notify "MISS DIG" 1-800-482-7171 at least 72 hours prior to the start of construction. G COMMISIONER STORM SEWER 6. The contractor shall at all times be aware of inconvenience caused to the abutting property owners and the COLBY ST. 707 BUHL ST. general public. Where the contractor does not remedy undue inconveniences, the Charter Township of MASON, MI 48854 Meridian, upon four hours notice, reserves the right to perform the work and deduct the cost therefore from 11 517.676.8395 the money due the contractor. INGHAM COUNTY ROAD DEPT PUBLIC ROADS AND 7. A Registered Land Surveyor provided by the contractor at the contractor's expense shall replace all 301 BUSH ST. RIGHTS OF WAY property irons and monuments disturbed or destroyed by the contractor's operations. MASON, MI 48854 .TS .TS .TS 8. Contractor shall provide Owner and Township Engineer a copy of written permission to use private property 517.676.9722 for storage of equipment and materials or for his construction operations. RETTOP WAHS NOSDE 9. Trench backfill under existing or proposed roadways, driveways, and parking areas, shall be sand or gravel, placed in 12" layers (maximum) and consolidated to 95% of maximum density as measured by modified proctor unless otherwise noted. LAKE DR. 10. Trees and shrubs are to be protected during construction and bored where necessary. 11. Existing fences shall be removed and restored to their original condition or better where in conflict with construction. LAKE DR. 12. Driveways, culverts, ditches, drain tile, tile fields, drainage structures, etc., that are disturbed by the contractor's operations shall be immediately restored. 13. All established lawn areas disturbed by the contractor's operations shall be resodded with matching sod. All other areas shall be seeded and mulched. Seeding and mulching shall be done in accordance with the General Specifications. D A O R 14. All ditch slopes shall have established vegetation and be protected from erosion. L AI . R R 15. All utility poles in close proximity to construction shall be supported in a manner satisfactory to the utility N D C owner. .TS P Y A W I 16. Onsite parking and sanitary facilities shall be provided for construction workers. The facilities shall be G E N D constructed and operated (with minimal impact to the surrounding area) to the satisfaction of the Township. RI E NOTLRAC R I D PROJECT G E HASLETT RD. LOCATION PATHWAY NOTES D R HASLETT RD. HASLETT RD. . 1. Pathways and sidewalks shall be four (4) inch thick concrete except at driveways where they shall be six (6) inch (residential) or seven (7) inch (commercial) thick concrete. .DR 2. Three (3) inches of compacted sand base shall be placed under all pathways and sidewalks. Sheet List Table HSRAM 3. All bituminous aprons shall be two and one-half (21) inches thick, unless otherwise noted. .DR 2 Sheet Number Sheet Title 4. Property irons shall be maintained by the Contractor. .TS MAHGNIKCUB . T 1 COVER SHEET 5. All existing concrete and bituminous to be removed shall be sawcut. All bituminous removal shall be TTIBBAB BAYSHORE S considered incidental to construction. 2 OVERALL SITE PLAN L 6. All aggregate base material shall be four (4) inches of 22A. O 3 SITE PLAN TONAWONDA O 7. All tree (less than 6") and shrub removal shall be considered part of subgrade preparation. H YERETNOM 4 SITE PLAN C 8. Location of new plant material shall be as directed by the Engineer, and shall be installed in accordance S with guidelines established by the A.N.L.A. 5 SITE PLAN FLAMINGO 9. All plant material not marked for removal shall be protected. .DR FRANKLIN ST. 6 SESC PLAN .TS 10. Bituminous drives shall be sawcut 18" on either side of proposed pathway. 7 SESC PLAN 11. The maximum longitudinal slope is 5% (up to an absolute maximum of 81% at the direction of the Engineer) ELADNELLAH EDAC 3 WAY 8 SESC PLAN and the maximum cross slope is 2%. ASCOT R O T 9 SESC NOTES AND DETAILS 13. Expansion joints shall be placed at approximately 100' intervals and shall be 1" thick. Contraction joints shall S T. 2 N E C be sawcut to a depth of 1 of the depth of the concrete. 10 GRADING PLAN 4 C WILSHIRE RD. O 14. All lumber to be pressure treated (Osmose 33 or equal) to 0.4 retention. R 11 GRADING PLAN A 15. All items not covered under a specific pay item shall be considered incidental. L .DR 12 GRADING PLAN W .DR A 13 GRADING PLAN - TREE WELLS Y ELLIVDOOW 14 DETAIL SHEETS BISCAYNE WAY LLENROC 15 DETAIL SHEETS . D 16 TYPICAL SECTIONS R REVISIONS: H Meridian Charter Township S DATE BY: COMMENTS: R Ingham County, Michigan 07.31.26 CH BID PLANS A M Call before you dig. PATHWAY MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET: INGHAM COUNTY, MICHIGAN 1 - COVER SHEET DRAWN BY: CH CHECKED BY: YI | |||||||
|---|---|---|---|---|---|---|---|
| UTILITY COMPANY UTILITIES MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY AT&T TELEPHONE 337 N. ABBOTT, RM. 201 CONSTRUCTION PLANS EAST LANSING, MI 48823 517.337.3660 FOR CONSUMERS ENERGY GAS 530 W. WILLOW ST. ELECTRIC MERIDIAN TOWNSHIP N P.O. BOX 30162 LANSING, MI 48909 . INGHAM COUNTY, MICHIGAN R 517.373.6100 D E COMCAST CABLE TV K A 1070 TROWBRIDGE ROAD STANDARD CONSTRUCTION NOTES L EAST LANSING, MI 48823 PARK ST. 517.332.1012 1. The Contractor shall notify the Charter Township of Meridian, Department of Public Works, Office of Engineering 517-853-4440 a minimum of 72 hours prior to the start of construction of public utilities or of MERIDIAN TOWNSHIP WATER MAINS construction within the public right-of-way. 5151 MARSH RD. SANITARY SEWER 2. All construction shall conform to the current standards and specifications of the Charter Township of R. OKEMOS, MI 48864 PATHWAYS R. Meridian which are included as part of these plans in effect at the time of construction. 517.853.4440 N .DR R E 3. After the completion of construction of public utilities or construction within public right-of-way, the T LAKE LANSING S WOLVERINE PIPE LINE PETROLEUM PIPELINE contractor must request a final inspection. Any punchlist items resulting from the final inspection must be E W 8105 VALLEYWOOD LANE resolved prior to final release and acceptance. HSRAM K N PORTAGE, MI 49024-5251 U 4. The existing utilities indicated on the plans are in accordance with available information. It shall be the R 231.323.2491 T contractor's obligation to verify the exact location of all existing utilities, which might affect this job. D N A R INGHAM COUNTY DRAIN DRAINS 5. The contractor shall notify "MISS DIG" 1-800-482-7171 at least 72 hours prior to the start of construction. G COMMISIONER STORM SEWER 6. The contractor shall at all times be aware of inconvenience caused to the abutting property owners and the COLBY ST. 707 BUHL ST. general public. Where the contractor does not remedy undue inconveniences, the Charter Township of MASON, MI 48854 Meridian, upon four hours notice, reserves the right to perform the work and deduct the cost therefore from 11 517.676.8395 the money due the contractor. INGHAM COUNTY ROAD DEPT PUBLIC ROADS AND 7. A Registered Land Surveyor provided by the contractor at the contractor's expense shall replace all 301 BUSH ST. RIGHTS OF WAY property irons and monuments disturbed or destroyed by the contractor's operations. MASON, MI 48854 .TS .TS .TS 8. Contractor shall provide Owner and Township Engineer a copy of written permission to use private property 517.676.9722 for storage of equipment and materials or for his construction operations. RETTOP WAHS NOSDE 9. Trench backfill under existing or proposed roadways, driveways, and parking areas, shall be sand or gravel, placed in 12" layers (maximum) and consolidated to 95% of maximum density as measured by modified proctor unless otherwise noted. LAKE DR. 10. Trees and shrubs are to be protected during construction and bored where necessary. 11. Existing fences shall be removed and restored to their original condition or better where in conflict with construction. LAKE DR. 12. Driveways, culverts, ditches, drain tile, tile fields, drainage structures, etc., that are disturbed by the contractor's operations shall be immediately restored. 13. All established lawn areas disturbed by the contractor's operations shall be resodded with matching sod. All other areas shall be seeded and mulched. Seeding and mulching shall be done in accordance with the General Specifications. D A O R 14. All ditch slopes shall have established vegetation and be protected from erosion. L AI . R R 15. All utility poles in close proximity to construction shall be supported in a manner satisfactory to the utility N D C owner. .TS P Y A W I 16. Onsite parking and sanitary facilities shall be provided for construction workers. The facilities shall be G E N D constructed and operated (with minimal impact to the surrounding area) to the satisfaction of the Township. RI E NOTLRAC R I D PROJECT G E HASLETT RD. LOCATION PATHWAY NOTES D R HASLETT RD. HASLETT RD. . 1. Pathways and sidewalks shall be four (4) inch thick concrete except at driveways where they shall be six (6) inch (residential) or seven (7) inch (commercial) thick concrete. .DR 2. Three (3) inches of compacted sand base shall be placed under all pathways and sidewalks. Sheet List Table HSRAM 3. All bituminous aprons shall be two and one-half (21) inches thick, unless otherwise noted. .DR 2 Sheet Number Sheet Title 4. Property irons shall be maintained by the Contractor. .TS MAHGNIKCUB . T 1 COVER SHEET 5. All existing concrete and bituminous to be removed shall be sawcut. All bituminous removal shall be TTIBBAB BAYSHORE S considered incidental to construction. 2 OVERALL SITE PLAN L 6. All aggregate base material shall be four (4) inches of 22A. O 3 SITE PLAN TONAWONDA O 7. All tree (less than 6") and shrub removal shall be considered part of subgrade preparation. H YERETNOM 4 SITE PLAN C 8. Location of new plant material shall be as directed by the Engineer, and shall be installed in accordance S with guidelines established by the A.N.L.A. 5 SITE PLAN FLAMINGO 9. All plant material not marked for removal shall be protected. .DR FRANKLIN ST. 6 SESC PLAN .TS 10. Bituminous drives shall be sawcut 18" on either side of proposed pathway. 7 SESC PLAN 11. The maximum longitudinal slope is 5% (up to an absolute maximum of 81% at the direction of the Engineer) ELADNELLAH EDAC 3 WAY 8 SESC PLAN and the maximum cross slope is 2%. ASCOT R O T 9 SESC NOTES AND DETAILS 13. Expansion joints shall be placed at approximately 100' intervals and shall be 1" thick. Contraction joints shall S T. 2 N E C be sawcut to a depth of 1 of the depth of the concrete. 10 GRADING PLAN 4 C WILSHIRE RD. O 14. All lumber to be pressure treated (Osmose 33 or equal) to 0.4 retention. R 11 GRADING PLAN A 15. All items not covered under a specific pay item shall be considered incidental. L .DR 12 GRADING PLAN W .DR A 13 GRADING PLAN - TREE WELLS Y ELLIVDOOW 14 DETAIL SHEETS BISCAYNE WAY LLENROC 15 DETAIL SHEETS . D 16 TYPICAL SECTIONS R REVISIONS: H Meridian Charter Township S DATE BY: COMMENTS: R Ingham County, Michigan 07.31.26 CH BID PLANS A M Call before you dig. PATHWAY MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET: INGHAM COUNTY, MICHIGAN 1 - COVER SHEET DRAWN BY: CH CHECKED BY: YI | |||||||
| C . | Meridian Charter Township Ingham County, Michigan PATHWAY | REVISIONS: | |||||
| DATE | BY: | COMMENTS: | |||||
| 07.31.26 | CH | BID PLANS | |||||
| MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, INGHAM COUNTY, MICHIGAN | |||||||
| SHEET: 1 - COVER SHEET | |||||||
| DRAWN BY: CH | CHECKED BY: YI |
| Sheet List Table | |
|---|---|
| Sheet Number | Sheet Title |
| 1 | COVER SHEET |
| 2 | OVERALL SITE PLAN |
| 3 | SITE PLAN |
| 4 | SITE PLAN |
| 5 | SITE PLAN |
| 6 | SESC PLAN |
| 7 | SESC PLAN |
| 8 | SESC PLAN |
| 9 | SESC NOTES AND DETAILS |
| 10 | GRADING PLAN |
| 11 | GRADING PLAN |
| 12 | GRADING PLAN |
| 13 | GRADING PLAN - TREE WELLS |
| 14 | DETAIL SHEETS |
| 15 | DETAIL SHEETS |
| 16 | TYPICAL SECTIONS |
PARK ST.
COLBY ST.
.DR
HSRAM
.TS
NOSDE
.TS
RETTOP
.TS
WAHS
.TS
TTIBBAB
YERETNOM
.TS
NOTLRAC
LAKE DR.
BAYSHORE
TONAWONDA
FLAMINGO
R
O T
N E
S
C
T.
WILSHIRE RD.
BISCAYNE WAY
.DR
ELADNELLAH
.DR
MAHGNIKCUB
C
O
R
A
L
W
A
Y
.DR
ELLIVDOOW
.TS
EDAC
WAY
ASCOT
.DR
LLENROC
.
R
D
E
K
A
L
R.
R.
N
R E
T
LAKE LANSING S
E
W
K
N
U
R
T
D
N
A R
G
11
LAKE DR.
D
A
O
R
L
AI
.
R R
N D
C
P
Y
A
W I
G E N
D
RI E
R
I
D
PROJECT G
E
LOCATION
D
R
HASLETT RD. HASLETT RD. .
. T
S
L
O
O
H
C
S
FRANKLIN ST.
. D
R
H
S
R
A
M
.DR
HSRAM
UTILITY COMPANY UTILITIES
MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY
AT&T TELEPHONE
337 N. ABBOTT, RM. 201 CONSTRUCTION PLANS
EAST LANSING, MI 48823
517.337.3660
FOR
CONSUMERS ENERGY GAS
530 W. WILLOW ST. ELECTRIC MERIDIAN TOWNSHIP
N
P.O. BOX 30162
LANSING, MI 48909
INGHAM COUNTY, MICHIGAN
517.373.6100
COMCAST CABLE TV
1070 TROWBRIDGE ROAD STANDARD CONSTRUCTION NOTES
EAST LANSING, MI 48823
517.332.1012 1. The Contractor shall notify the Charter Township of Meridian, Department of Public Works, Office of
Engineering 517-853-4440 a minimum of 72 hours prior to the start of construction of public utilities or of
MERIDIAN TOWNSHIP WATER MAINS
construction within the public right-of-way.
5151 MARSH RD. SANITARY SEWER
2. All construction shall conform to the current standards and specifications of the Charter Township of
OKEMOS, MI 48864 PATHWAYS
Meridian which are included as part of these plans in effect at the time of construction.
517.853.4440
3. After the completion of construction of public utilities or construction within public right-of-way, the
WOLVERINE PIPE LINE PETROLEUM PIPELINE contractor must request a final inspection. Any punchlist items resulting from the final inspection must be
8105 VALLEYWOOD LANE
resolved prior to final release and acceptance.
PORTAGE, MI 49024-5251
4. The existing utilities indicated on the plans are in accordance with available information. It shall be the
231.323.2491
contractor's obligation to verify the exact location of all existing utilities, which might affect this job.
INGHAM COUNTY DRAIN DRAINS 5. The contractor shall notify "MISS DIG" 1-800-482-7171 at least 72 hours prior to the start of construction.
COMMISIONER STORM SEWER
6. The contractor shall at all times be aware of inconvenience caused to the abutting property owners and the
707 BUHL ST.
general public. Where the contractor does not remedy undue inconveniences, the Charter Township of
MASON, MI 48854
Meridian, upon four hours notice, reserves the right to perform the work and deduct the cost therefore from
517.676.8395
the money due the contractor.
INGHAM COUNTY ROAD DEPT PUBLIC ROADS AND
7. A Registered Land Surveyor provided by the contractor at the contractor's expense shall replace all
301 BUSH ST. RIGHTS OF WAY
property irons and monuments disturbed or destroyed by the contractor's operations.
MASON, MI 48854
8. Contractor shall provide Owner and Township Engineer a copy of written permission to use private property
517.676.9722
for storage of equipment and materials or for his construction operations.
9. Trench backfill under existing or proposed roadways, driveways, and parking areas, shall be sand or gravel,
placed in 12" layers (maximum) and consolidated to 95% of maximum density as measured by modified
proctor unless otherwise noted.
10. Trees and shrubs are to be protected during construction and bored where necessary.
11. Existing fences shall be removed and restored to their original condition or better where in conflict with
construction.
12. Driveways, culverts, ditches, drain tile, tile fields, drainage structures, etc., that are disturbed by the
contractor's operations shall be immediately restored.
13. All established lawn areas disturbed by the contractor's operations shall be resodded with matching sod. All
other areas shall be seeded and mulched. Seeding and mulching shall be done in accordance with the
General Specifications.
14. All ditch slopes shall have established vegetation and be protected from erosion.
15. All utility poles in close proximity to construction shall be supported in a manner satisfactory to the utility
owner.
16. Onsite parking and sanitary facilities shall be provided for construction workers. The facilities shall be
constructed and operated (with minimal impact to the surrounding area) to the satisfaction of the Township.
HASLETT RD.
PATHWAY NOTES
1. Pathways and sidewalks shall be four (4) inch thick concrete except at driveways where they shall be six (6)
inch (residential) or seven (7) inch (commercial) thick concrete.
2. Three (3) inches of compacted sand base shall be placed under all pathways and sidewalks.
Sheet List Table
3. All bituminous aprons shall be two and one-half (21) inches thick, unless otherwise noted. 2
Sheet Number Sheet Title
4. Property irons shall be maintained by the Contractor.
1 COVER SHEET 5. All existing concrete and bituminous to be removed shall be sawcut. All bituminous removal shall be
considered incidental to construction. 2 OVERALL SITE PLAN
6. All aggregate base material shall be four (4) inches of 22A.
3 SITE PLAN
7. All tree (less than 6") and shrub removal shall be considered part of subgrade preparation.
4 SITE PLAN
8. Location of new plant material shall be as directed by the Engineer, and shall be installed in accordance
with guidelines established by the A.N.L.A.
5 SITE PLAN
9. All plant material not marked for removal shall be protected.
6 SESC PLAN
10. Bituminous drives shall be sawcut 18" on either side of proposed pathway.
7 SESC PLAN
11. The maximum longitudinal slope is 5% (up to an absolute maximum of 81% at the direction of the Engineer)
3
8 SESC PLAN and the maximum cross slope is 2%.
9 SESC NOTES AND DETAILS 13. Expansion joints shall be placed at approximately 100' intervals and shall be 1" thick. Contraction joints shall
2
be sawcut to a depth of 1 of the depth of the concrete.
10 GRADING PLAN 4
14. All lumber to be pressure treated (Osmose 33 or equal) to 0.4 retention.
11 GRADING PLAN
15. All items not covered under a specific pay item shall be considered incidental.
12 GRADING PLAN
13 GRADING PLAN - TREE WELLS
14 DETAIL SHEETS
15 DETAIL SHEETS
16 TYPICAL SECTIONS
REVISIONS:
Meridian Charter Township
DATE BY: COMMENTS:
Ingham County, Michigan
07.31.26 CH BID PLANS
Call before you dig.
PATHWAY
MSU TO LAKE LANSING PHASE III -
LAND PRESERVE PATHWAY
NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET:
INGHAM COUNTY, MICHIGAN
1 - COVER SHEET
DRAWN BY: CH CHECKED BY: YI
gwd.evreserP
dnaL
TEEHSREVOC\snalP\SNALP
NGISED\SNALP\evreserP
dnaL
III
hP
gnisnaL
ekaL
ot
USM\6202\stcejorP\sklawediS
&
syawhtaP\skroW
cilbuP
&
gnireenignE\:G
| LEGEND PROPERTY LINE ASPHALT PATHWAY CONCRETE PATHWAY WETLAND INVASIVE PLANT E V RI D E K A L TEERTS NOTLRAC HASLETT ROAD REVISIONS: Meridian Charter Township DATE BY: COMMENTS: Ingham County, Michigan 07.31.26 CH BID PLANS Call before you dig. PATHWAY MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET: INGHAM COUNTY, MICHIGAN 2 - OVERALL SITE PLAN DRAWN BY: CH CHECKED BY: YI | |||||||
|---|---|---|---|---|---|---|---|
| LEGEND PROPERTY LINE ASPHALT PATHWAY CONCRETE PATHWAY WETLAND INVASIVE PLANT E V RI D E K A L TEERTS NOTLRAC HASLETT ROAD REVISIONS: Meridian Charter Township DATE BY: COMMENTS: Ingham County, Michigan 07.31.26 CH BID PLANS Call before you dig. PATHWAY MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET: INGHAM COUNTY, MICHIGAN 2 - OVERALL SITE PLAN DRAWN BY: CH CHECKED BY: YI | |||||||
| Meridian Charter Township Ingham County, Michigan PATHWAY | REVISIONS: | ||||||
| DATE | BY: | COMMENTS: | |||||
| 07.31.26 | CH | BID PLANS | |||||
| MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, INGHAM COUNTY, MICHIGAN | |||||||
| SHEET: 2 - OVERALL SITE PLAN | |||||||
| DRAWN BY: CH | CHECKED BY: YI |
E
V
RI
D
E
K
A
L
TEERTS
NOTLRAC
LEGEND
PROPERTY LINE
HASLETT
ROAD
REVISIONS:
Meridian Charter Township
DATE BY: COMMENTS:
Ingham County, Michigan
07.31.26 CH BID PLANS
Call before you dig.
PATHWAY
MSU TO LAKE LANSING PHASE III -
LAND PRESERVE PATHWAY
NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET:
INGHAM COUNTY, MICHIGAN
2 - OVERALL SITE PLAN
DRAWN BY: CH CHECKED BY: YI
gwd.evreserP
dnaL
NALP
ETIS\snalP\SNALP
NGISED\SNALP\evreserP
dnaL
III
hP
gnisnaL
ekaL
ot
USM\6202\stcejorP\sklawediS
&
syawhtaP\skroW
cilbuP
&
gnireenignE\:G
ASPHALT PATHWAY
CONCRETE PATHWAY
WETLAND
INVASIVE PLANT
| LEGEND PROPERTY LINE FENCE SEE SHEET 4 ASPHALT PATHWAY CONCRETE PATHWAY RIPRAP TO PREVENT EROSION. LANDING PAD COORDINATE THE LOCATION WITH THE ENGINEER WETLAND INVASIVE PLANT INVASIVE PLANT, NOT TO BE DISTURBED (TYP.) TREE WELL #4 RIPRAP TO PREVENT EROSION. COORDINATE THE LOCATION WITH THE ENGINEER TREE WELL #3 TREE WELL #2 TREE WELL #1 10.00' RELOCATE (2) TIMBER LAND PRESERVE SIGNS OUT OF PATHWAY HASLETT ROAD TIE INTO EXISTING 7' PATHWAY ON HASLETT ROAD REVISIONS: Meridian Charter Township DATE BY: COMMENTS: Ingham County, Michigan 07.31.26 CH BID PLANS Call before you dig. PATHWAY MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET: INGHAM COUNTY, MICHIGAN 3 - SITE PLAN DRAWN BY: CH CHECKED BY: YI | |||||||
|---|---|---|---|---|---|---|---|
| LEGEND PROPERTY LINE FENCE SEE SHEET 4 ASPHALT PATHWAY CONCRETE PATHWAY RIPRAP TO PREVENT EROSION. LANDING PAD COORDINATE THE LOCATION WITH THE ENGINEER WETLAND INVASIVE PLANT INVASIVE PLANT, NOT TO BE DISTURBED (TYP.) TREE WELL #4 RIPRAP TO PREVENT EROSION. COORDINATE THE LOCATION WITH THE ENGINEER TREE WELL #3 TREE WELL #2 TREE WELL #1 10.00' RELOCATE (2) TIMBER LAND PRESERVE SIGNS OUT OF PATHWAY HASLETT ROAD TIE INTO EXISTING 7' PATHWAY ON HASLETT ROAD REVISIONS: Meridian Charter Township DATE BY: COMMENTS: Ingham County, Michigan 07.31.26 CH BID PLANS Call before you dig. PATHWAY MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET: INGHAM COUNTY, MICHIGAN 3 - SITE PLAN DRAWN BY: CH CHECKED BY: YI | |||||||
| . | Meridian Charter Township Ingham County, Michigan PATHWAY | REVISIONS: | |||||
| DATE | BY: | COMMENTS: | |||||
| 07.31.26 | CH | BID PLANS | |||||
| MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, INGHAM COUNTY, MICHIGAN | |||||||
| SHEET: 3 - SITE PLAN | |||||||
| DRAWN BY: CH | CHECKED BY: YI |
LEGEND
PROPERTY LINE
FENCE
ASPHALT PATHWAY
CONCRETE PATHWAY
RIPRAP TO PREVENT EROSION. LANDING PAD
COORDINATE THE LOCATION
WITH THE ENGINEER
WETLAND
INVASIVE PLANT, NOT TO
BE DISTURBED (TYP.)
TREE WELL #4
RIPRAP TO PREVENT EROSION.
COORDINATE THE LOCATION
WITH THE ENGINEER
TREE WELL #3
TREE WELL #2
TREE WELL #1
10.00'
RELOCATE (2) TIMBER
LAND PRESERVE SIGNS
OUT OF PATHWAY
HASLETT
ROAD
TIE INTO EXISTING 7'
PATHWAY ON HASLETT ROAD
REVISIONS:
Meridian Charter Township
DATE BY: COMMENTS:
Ingham County, Michigan
07.31.26 CH BID PLANS
Call before you dig.
PATHWAY
MSU TO LAKE LANSING PHASE III -
LAND PRESERVE PATHWAY
NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET:
INGHAM COUNTY, MICHIGAN
3 - SITE PLAN
DRAWN BY: CH CHECKED BY: YI
gwd.evreserP
dnaL
NALP
ETIS\snalP\SNALP
NGISED\SNALP\evreserP
dnaL
III
hP
gnisnaL
ekaL
ot
USM\6202\stcejorP\sklawediS
&
syawhtaP\skroW
cilbuP
&
gnireenignE\:G
SEE SHEET 4
INVASIVE PLANT
| LEGEND PROPERTY LINE FENCE ASPHALT PATHWAY CONCRETE PATHWAY LANDING PAD WETLAND RAILROAD TRACKS E V RI D E K A L 5 TEEHS EES 25 LF OF 8" CORRUGATED STEEL PIPE 20' WETLAND BUFFER 10.00' INVASIVE PLANT, NOT TO BE DISTURBED (TYP.) SEE SHEET 3 REVISIONS: Meridian Charter Township DATE BY: COMMENTS: Ingham County, Michigan 07.31.26 CH BID PLANS Call before you dig. PATHWAY MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET: INGHAM COUNTY, MICHIGAN 4 - SITE PLAN DRAWN BY: CH CHECKED BY: YI | |||||||
|---|---|---|---|---|---|---|---|
| LEGEND PROPERTY LINE FENCE ASPHALT PATHWAY CONCRETE PATHWAY LANDING PAD WETLAND RAILROAD TRACKS E V RI D E K A L 5 TEEHS EES 25 LF OF 8" CORRUGATED STEEL PIPE 20' WETLAND BUFFER 10.00' INVASIVE PLANT, NOT TO BE DISTURBED (TYP.) SEE SHEET 3 REVISIONS: Meridian Charter Township DATE BY: COMMENTS: Ingham County, Michigan 07.31.26 CH BID PLANS Call before you dig. PATHWAY MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET: INGHAM COUNTY, MICHIGAN 4 - SITE PLAN DRAWN BY: CH CHECKED BY: YI | |||||||
| Meridian Charter Township Ingham County, Michigan PATHWAY | REVISIONS: | ||||||
| DATE | BY: | COMMENTS: | |||||
| 07.31.26 | CH | BID PLANS | |||||
| MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, INGHAM COUNTY, MICHIGAN | |||||||
| SHEET: 4 - SITE PLAN | |||||||
| DRAWN BY: CH | CHECKED BY: YI |
LEGEND
PROPERTY LINE
FENCE
ASPHALT PATHWAY
CONCRETE PATHWAY
LANDING PAD
WETLAND
RAILROAD TRACKS
E
V
RI
D
E
K
A
L
25 LF OF 8"
CORRUGATED
STEEL PIPE
20' WETLAND BUFFER
10.00'
INVASIVE PLANT, NOT TO
BE DISTURBED (TYP.)
REVISIONS:
Meridian Charter Township
DATE BY: COMMENTS:
Ingham County, Michigan
07.31.26 CH BID PLANS
Call before you dig.
PATHWAY
MSU TO LAKE LANSING PHASE III -
LAND PRESERVE PATHWAY
NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET:
INGHAM COUNTY, MICHIGAN
4 - SITE PLAN
DRAWN BY: CH CHECKED BY: YI
gwd.evreserP
dnaL
NALP
ETIS\snalP\SNALP
NGISED\SNALP\evreserP
dnaL
III
hP
gnisnaL
ekaL
ot
USM\6202\stcejorP\sklawediS
&
syawhtaP\skroW
cilbuP
&
gnireenignE\:G
SEE SHEET 3
5
TEEHS
EES
| LEGEND PROPERTY LINE FENCE ASPHALT PATHWAY CONCRETE PATHWAY LANDING PAD RAILROAD TRACKS WETLAND GRAVEL SHOULDER / PARKING AREA UTILITY POLE EDGE OF ASPHALT 10.00' 20' WETLAND BUFFER TEERTS NOTLRAC 25 LF OF 8" CORRUGATED STEEL PIPE 4 TEEHS EES REVISIONS: Meridian Charter Township DATE BY: COMMENTS: Ingham County, Michigan 07.31.26 CH BID PLANS Call before you dig. PATHWAY MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET: INGHAM COUNTY, MICHIGAN 5 - SITE PLAN DRAWN BY: CH CHECKED BY: YI | |||||||
|---|---|---|---|---|---|---|---|
| LEGEND PROPERTY LINE FENCE ASPHALT PATHWAY CONCRETE PATHWAY LANDING PAD RAILROAD TRACKS WETLAND GRAVEL SHOULDER / PARKING AREA UTILITY POLE EDGE OF ASPHALT 10.00' 20' WETLAND BUFFER TEERTS NOTLRAC 25 LF OF 8" CORRUGATED STEEL PIPE 4 TEEHS EES REVISIONS: Meridian Charter Township DATE BY: COMMENTS: Ingham County, Michigan 07.31.26 CH BID PLANS Call before you dig. PATHWAY MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET: INGHAM COUNTY, MICHIGAN 5 - SITE PLAN DRAWN BY: CH CHECKED BY: YI | |||||||
| . | Meridian Charter Township Ingham County, Michigan PATHWAY | REVISIONS: | |||||
| DATE | BY: | COMMENTS: | |||||
| 07.31.26 | CH | BID PLANS | |||||
| MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, INGHAM COUNTY, MICHIGAN | |||||||
| SHEET: 5 - SITE PLAN | |||||||
| DRAWN BY: CH | CHECKED BY: YI |
TEERTS
NOTLRAC
LEGEND
PROPERTY LINE
FENCE
ASPHALT PATHWAY
CONCRETE PATHWAY
LANDING PAD
RAILROAD TRACKS
WETLAND
GRAVEL SHOULDER
/ PARKING AREA
UTILITY POLE
EDGE OF ASPHALT
20' WETLAND BUFFER
25 LF OF 8"
CORRUGATED
STEEL PIPE
REVISIONS:
Meridian Charter Township
DATE BY: COMMENTS:
Ingham County, Michigan
07.31.26 CH BID PLANS
Call before you dig.
PATHWAY
MSU TO LAKE LANSING PHASE III -
LAND PRESERVE PATHWAY
NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET:
INGHAM COUNTY, MICHIGAN
5 - SITE PLAN
DRAWN BY: CH CHECKED BY: YI
gwd.evreserP
dnaL
NALP
ETIS\snalP\SNALP
NGISED\SNALP\evreserP
dnaL
III
hP
gnisnaL
ekaL
ot
USM\6202\stcejorP\sklawediS
&
syawhtaP\skroW
cilbuP
&
gnireenignE\:G
4
TEEHS
EES
10.00'
| LEGEND Na PROPERTY LINE Sb EXISTING CONTOUR SEE SHEET 7 PROPOSED CONTOUR LIMIT OF DISTURBANCE SILT FENCE (S51) SOIL BOUNDARY CONSTRUCTION ACCESS (S53) WETLAND INVASIVE PLANT SILT FENCE (S51) TYP. Sb UeB HASLETT ROAD REVISIONS: Meridian Charter Township DATE BY: COMMENTS: Ingham County, Michigan 07.31.26 CH BID PLANS Call before you dig. PATHWAY MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET: INGHAM COUNTY, MICHIGAN 6 - SESC PLAN DRAWN BY: CH CHECKED BY: YI | ||||||
|---|---|---|---|---|---|---|
| LEGEND Na PROPERTY LINE Sb EXISTING CONTOUR SEE SHEET 7 PROPOSED CONTOUR LIMIT OF DISTURBANCE SILT FENCE (S51) SOIL BOUNDARY CONSTRUCTION ACCESS (S53) WETLAND INVASIVE PLANT SILT FENCE (S51) TYP. Sb UeB HASLETT ROAD REVISIONS: Meridian Charter Township DATE BY: COMMENTS: Ingham County, Michigan 07.31.26 CH BID PLANS Call before you dig. PATHWAY MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET: INGHAM COUNTY, MICHIGAN 6 - SESC PLAN DRAWN BY: CH CHECKED BY: YI | ||||||
| . | Meridian Charter Township Ingham County, Michigan 0 PATHWAY | REVISIONS: | ||||
| DATE | BY: | COMMENTS: | ||||
| 7.31.2 | 6 CH | BID PLANS | ||||
| MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, S INGHAM COUNTY, MICHIGAN DRAWN BY: CH CHECKED BY: YI | ||||||
| HEET: 6 - SESC PLAN | ||||||
| DRAWN BY: CH |
LEGEND
Na
PROPERTY LINE
Sb
EXISTING CONTOUR
PROPOSED CONTOUR
LIMIT OF DISTURBANCE
SILT FENCE (S51)
SOIL BOUNDARY
CONSTRUCTION ACCESS (S53)
WETLAND
SILT FENCE (S51) TYP.
Sb
UeB
HASLETT ROAD
REVISIONS:
Meridian Charter Township
DATE BY: COMMENTS:
Ingham County, Michigan
07.31.26 CH BID PLANS
Call before you dig.
PATHWAY
MSU TO LAKE LANSING PHASE III -
LAND PRESERVE PATHWAY
NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET:
INGHAM COUNTY, MICHIGAN
6 - SESC PLAN
DRAWN BY: CH CHECKED BY: YI
ggwwdd..eevvrreesseerrPP
ddnnaaLL
--
SSLLIIAATTEEDD
ddnnaa
NNAALLPP
CCSSEESS\\ssnnaallPP\\SSNNAALLPP
NNGGIISSEEDD\\SSNNAALLPP\\eevvrreesseerrPP
ddnnaaLL
IIIIII
hhPP
ggnniissnnaaLL
eekkaaLL
oott
UUSSMM\\66220022\\ssttcceejjoorrPP\\sskkllaawweeddiiSS
&&
ssyyaawwhhttaaPP\\sskkrrooWW
cciillbbuuPP
&&
ggnniirreeeenniiggnnEE\\::GG
SEE SHEET 7
INVASIVE PLANT
| LEGEND PROPERTY LINE EXISTING CONTOUR PROPOSED CONTOUR LIMIT OF DISTURBANCE SILT FENCE (S51) SOIL BOUNDARY CONSTRUCTION ACCESS (S53) WETLAND INVASIVE PLANT 8 TEEHS EES SILT FENCE (S51) TYP. Na Sb SEE SHEET 6 REVISIONS: Meridian Charter Township DATE BY: COMMENTS: Ingham County, Michigan 07.31.26 CH BID PLANS Call before you dig. PATHWAY MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET: INGHAM COUNTY, MICHIGAN 7 - SESC PLAN DRAWN BY: CH CHECKED BY: YI | ||||||
|---|---|---|---|---|---|---|
| LEGEND PROPERTY LINE EXISTING CONTOUR PROPOSED CONTOUR LIMIT OF DISTURBANCE SILT FENCE (S51) SOIL BOUNDARY CONSTRUCTION ACCESS (S53) WETLAND INVASIVE PLANT 8 TEEHS EES SILT FENCE (S51) TYP. Na Sb SEE SHEET 6 REVISIONS: Meridian Charter Township DATE BY: COMMENTS: Ingham County, Michigan 07.31.26 CH BID PLANS Call before you dig. PATHWAY MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET: INGHAM COUNTY, MICHIGAN 7 - SESC PLAN DRAWN BY: CH CHECKED BY: YI | ||||||
| Meridian Charter Township Ingham County, Michigan 0 PATHWAY | REVISIONS: | |||||
| DATE | BY: | COMMENTS: | ||||
| 7.31.2 | 6 CH | BID PLANS | ||||
| MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, S INGHAM COUNTY, MICHIGAN DRAWN BY: CH CHECKED BY: YI | ||||||
| HEET: 7 - SESC PLAN | ||||||
| DRAWN BY: CH |
LEGEND
PROPERTY LINE
EXISTING CONTOUR
PROPOSED CONTOUR
LIMIT OF DISTURBANCE
SILT FENCE (S51)
SOIL BOUNDARY
CONSTRUCTION ACCESS (S53)
WETLAND
SILT FENCE (S51) TYP.
Na
Sb
REVISIONS:
Meridian Charter Township
DATE BY: COMMENTS:
Ingham County, Michigan
07.31.26 CH BID PLANS
Call before you dig.
PATHWAY
MSU TO LAKE LANSING PHASE III -
LAND PRESERVE PATHWAY
NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET:
INGHAM COUNTY, MICHIGAN
7 - SESC PLAN
DRAWN BY: CH CHECKED BY: YI
gwd.evreserP
dnaL
-
SLIATED
dna
NALP
CSES\snalP\SNALP
NGISED\SNALP\evreserP
dnaL
III
hP
gnisnaL
ekaL
ot
USM\6202\stcejorP\sklawediS
&
syawhtaP\skroW
cilbuP
&
gnireenignE\:G
SEE SHEET 6
8
TEEHS
EES
INVASIVE PLANT
| LEGEND PROPERTY LINE EXISTING CONTOUR PROPOSED CONTOUR LIMIT OF DISTURBANCE SILT FENCE (S51) SOIL BOUNDARY CONSTRUCTION ACCESS (S53) WETLAND INVASIVE PLANT SILT FENCE (S51) TYP. Na Sb CONSTRUCTION ENTRANCE (S53) 7 TEEHS EES REVISIONS: Meridian Charter Township DATE BY: COMMENTS: Ingham County, Michigan 07.31.26 CH BID PLANS Call before you dig. PATHWAY MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET: INGHAM COUNTY, MICHIGAN 8 - SESC PLAN DRAWN BY: CH CHECKED BY: YI | ||||||
|---|---|---|---|---|---|---|
| LEGEND PROPERTY LINE EXISTING CONTOUR PROPOSED CONTOUR LIMIT OF DISTURBANCE SILT FENCE (S51) SOIL BOUNDARY CONSTRUCTION ACCESS (S53) WETLAND INVASIVE PLANT SILT FENCE (S51) TYP. Na Sb CONSTRUCTION ENTRANCE (S53) 7 TEEHS EES REVISIONS: Meridian Charter Township DATE BY: COMMENTS: Ingham County, Michigan 07.31.26 CH BID PLANS Call before you dig. PATHWAY MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET: INGHAM COUNTY, MICHIGAN 8 - SESC PLAN DRAWN BY: CH CHECKED BY: YI | ||||||
| . | Meridian Charter Township Ingham County, Michigan 0 PATHWAY | REVISIONS: | ||||
| DATE | BY: | COMMENTS: | ||||
| 7.31.2 | 6 CH | BID PLANS | ||||
| MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, S INGHAM COUNTY, MICHIGAN DRAWN BY: CH CHECKED BY: YI | ||||||
| HEET: 8 - SESC PLAN | ||||||
| DRAWN BY: CH |
LEGEND
PROPERTY LINE
EXISTING CONTOUR
PROPOSED CONTOUR
LIMIT OF DISTURBANCE
SILT FENCE (S51)
SOIL BOUNDARY
CONSTRUCTION ACCESS (S53)
WETLAND
SILT FENCE (S51) TYP.
Na
Sb
CONSTRUCTION
ENTRANCE (S53)
REVISIONS:
Meridian Charter Township
DATE BY: COMMENTS:
Ingham County, Michigan
07.31.26 CH BID PLANS
Call before you dig.
PATHWAY
MSU TO LAKE LANSING PHASE III -
LAND PRESERVE PATHWAY
NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET:
INGHAM COUNTY, MICHIGAN
8 - SESC PLAN
DRAWN BY: CH CHECKED BY: YI
gwd.evreserP
dnaL
-
SLIATED
dna
NALP
CSES\snalP\SNALP
NGISED\SNALP\evreserP
dnaL
III
hP
gnisnaL
ekaL
ot
USM\6202\stcejorP\sklawediS
&
syawhtaP\skroW
cilbuP
&
gnireenignE\:G
7
TEEHS
EES
INVASIVE PLANT
| Ct G D | W L | |||||||
|---|---|---|---|---|---|---|---|---|
| OLYAB . OODWIND TR Taylor PIKE ST. Hillcurve Ave. C L A O K LU E V M IE .TS NAMNEERG .TS .TS .TS B BUCKTHORN IA PEPPERIDGE S T . vac. 1/21/99 W S T . SSERPYC SUNITRAM YEVRAH LAKE LANSING R. D PARK SOUTH ES SING RD. PARK ST. E K A GL L A E E. vac. 1/28/97 LAKE CT. alley R.R. (vac. 4/15/82) WESTERN Hickory Island Dr. COLBY ST. (vac. 8/26/97) TRUNK HICKORY ISLAND DR. 11 GRAND SHERBROOK WAY E. .TS .TS .TS alley N (vac. 9/26/97) V A NOSDE RETTOP WAHS AI R 10 WILKSHIRE SCHOOL LIH LS . O L L E B E T N D E K A L E N YAW LAKE DR. O M .DR DR. PI alley (vac. 10/01/01) PROJECT LOCATION N HSRAM O S N E CIMEDACA .TS RIDGEWAY P INE .RD B NOTLRAC HASLETT RD. R IDG WEIVLLIH E DR HASLETT RD. . ).cav( .TS .TS .ts nosde LOOHCS raby rd. vac. .TS .LP ARUTNEV TONAWANDA BAYSHORE CLIFFDALE DR. RABY RD. (vac. 1998) TTIBBAB YERETNOM RALYA (vac. 7/10/97) SCHOOL CAPITAL EDAC .DR .DR WOODSIDE DR. FLAMINGO AREA LIBRARY ELADNELLAH MAHGNIKCUB FRANKLIN ST. R ASCOT WAY .DR C O R A R D . L NESTOR W BUCKINGHAM WILSHIRE RD. CT. HITE ASH JEFFRIES DRAIN . W T C ELLIVDOOW A Y LN. HASLETT THE PROJECT IS LOCATED WITHIN 400' FROM LAKE LANSING. TAX ID: 11-302-039 LOT 2 & A PART OF LOTS 1 & 7 SUPR PLAT OF HASLETT ALSO PART OF LOTS 57 & 66 SUPR PLAT OF HASLETT NO. 1 DESC AS BEG AT THE SW COR LOT 2 - N 01 DEG 32'16"E ON E LOT LN 304.30 FT - N 59 DEG 24'39"E ON N LN LOT 7 & S LN OF GTW RR 120.09 FT - S 0 DEG 37'54" E 78.73 FT TO SE COR LOT 7 - N 89 DEG 28' E 5.75 FT - S 0 DEG 37'40" E 300.27 FT - N 84'59" W 5.75 FT - N 0 DEG 37'54" W 150 FT - N 83 DEG 42'41" W 58.24 FT - S 0 DEG 37'54" E 150 FT - N 83 DEG 21'12" W 58.23 FT TO THE POB SEC 11 T 4 N R 1 W TAX ID: 11-302-005 MP 2850 LOT 65 SUPERVISOR'S PLAT OF HASLETT NO. 1. TAX ID: 11-302-006 MP 2851 2852 THAT PT OF LOT 66 DESC AS COM AT PT 5.75 FT S 84 DEG E OF SW COR OF LOT 66, S 84 DEG E 93.25 FT TO NE COR OF LOT 56, SUP PLAT OF HASLETT- N TO S LINE OF LOT 65- W'LY ALONG SAID S LINE OF LOT 65 TO A PT 5.75 FT E'LY OF W LINE OF LOT 66- S PLL WITH W LINE OF LOT 66 TO BEG SUP PLAT OF HASLETT NO 1 TAX ID: 11-302-025 MP 2853 & 2854 LOT 67 ENTIRE & THAT PT OF LOT 66 COM AT NE COR OF LOT 56, SUP PLAT OF HASLETT- TH N TO S LINE OF LOT 65, SUP PLAT OF HASLETT- E 25 FT- N 112.3 FT ON E LINE OF SAID LOT 65 TO RAILROAD ST- NE'LY 82 FT- E 114 FT TO NE COR OF LOT 66, S 209 FT TO NE COR OF LOT 67, - N 84 DEG W 10 FT TO NW COR OF LOT 67- S 132 FT TO SW COR OF LOT 67- N 84 DEG W 196 FT TO BEG SUPERVISOR'S PLAT OF HASLETT NO 1 TAX ID: 11-302-036 MP 2855 2862-63 VACATED RAILROAD STREET. ALSO A PART OF LOT 68 SUP PLAT OF HASLETT NO. 1 DESC AS , BEG @ THE NE COR. OF SAID LOT 68 -S 0 DEG 15'47"E, ON LOT LN. 147.46 FT. TO THE NE COR. LOT 77 SAID PLAT -N 89 DEG 50'24"W, 131.55 FT. TO NW COR. LOT 77 -S 0 DEG 25'14"W, 210 FT. M/L TO SW COR. LOT 74 SAID PLAT -N 89 DEG 51'55"W, 118.62 FT. -S 0 DEG 23'24"W, 122.92 FT. -N 84 DEG 54'40"W, 132 FT. TO NW COR LOT 51 SUP. PLAT OF HASLETT -N 0 DEG 23'24"E, 209 FT. TO NE COR LOT 66 -W. TO RAILROAD ST. -NE'LY ALONG RAILROAD ST TO P.O.B. SEC 11 T4N,R1W SOIL EROSION & SEDIMENTATION CONTROL NOTES 1. All soil erosion and sediment control (SESC) work shall conform to the standards and specifications of the Ingham County Drain Commissioner's Office and Meridian Township. 2. Daily inspections shall be made by the contractor for effectiveness of SESC measures. Any necessary repairs shall be performed without delay. 3. Erosion of any sediment from work on the site shall be contained on-site and not allowed to collect on any off-site areas or in waterways. Waterways include both natural and man-made open ditches, streams, storm drains, lakes, ponds, and wetlands. 4. The Contractor shall apply temporary SESC measures when required and as directed on these plans. The Contractor shall remove temporary measures as soon as permanent stabilization of slopes, ditches, and other changes have been established. 5. Staging the work shall be done by the Contractor as directed in these plans and as required to ensure progressive stabilization of disturbed earth. 6. Soil erosion control practice shall be established in the early stages of construction by the Contractor. Sedimentation control practices shall be applied as a perimeter defense against any transporting of soil off the site. 7. The Contractor shall preserve natural vegetation as much as possible. 8. Vegetative stabilization of all disturbed areas shall be established within 15 days of completion of the final grading. SOILS Na NAPOLEON MUCK Sb SEBEWA LOAM 0 - 2% UeB URBAN LAND BOYER-SPINKS COMPLEX 0 TO 10% 72' REBMETPES YRAURBEF REBMEVON REBMECED REBOTCO RECOMMENDED CONSTRUCTION YRAUNAJ TSUGUA HCRAM SCHEDULING & SEQUENCING LIRPA ENUJ YLUJ YAM INSTALL SESC MEASURES REVISIONS: GRADE PATHWAY Meridian Charter Township DATE BY: COMMENTS: Ingham County, Michigan PAVE PATHWAY AND INSTALL FENCE 07.31.26 CH BID PLANS Call before you dig. PATHWAY SITE CLEANUP AND RESTORATION MSU TO LAKE LANSING PHASE III - REMOVE SESC MEASURES LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET: INGHAM COUNTY, MICHIGAN 9 - SESC NOTES AND DETAILS DRAWN BY: CH CHECKED BY: YI | ||||||||
| REVISIONS: Meridian Charter Township DATE BY: COMMENTS: Ingham County, Michigan 07.31.26 CH BID PLANS dig. PATHWAY MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET: INGHAM COUNTY, MICHIGAN 9 - SESC NOTES AND DETAILS DRAWN BY: CH CHECKED BY: YI | ||||||||
| DATE BY: COMMENTS: | ||||||||
| 07.31.26 CH BID PLANS | ||||||||
| MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, INGHAM COUNTY, MICHIGAN | ||||||||
| SHEET: 9 - SESC NOTES AND DETAILS | ||||||||
| DRAWN BY: CH | CHECKED BY: YI |
| 72' RECOMMENDED CONSTRUCTION YRAUNAJ SCHEDULING & SEQUENCING | YRAURBEF HCRAM LIRPA | YAM | ENUJ | YLUJ | TSUGUA | REBMETPES REBOTCO | REBMEVON | REBMECED |
|---|---|---|---|---|---|---|---|---|
| INSTALL SESC MEASURES | ||||||||
| GRADE PATHWAY | ||||||||
| PAVE PATHWAY AND INSTALL FENCE SITE CLEANUP AND RESTORATION |
Hickory Island Dr.
11
10 WILKSHIRE SCHOOL
raby rd. vac.
.TS NAMNEERG
LIH LS .
N
O S N E
B
LADY SLIPPER
.TS
SSERPYC
.TS
YEVRAH
ES
GL
A E
WESTERN
R.R.
GRAND
TRUNK
HASLETT RD.
ASCOT WAY
.
T C
.DR
ELLIVDOOW
.TS EDAC .LP ARUTNEV
YAW
CIMEDACA
C O R A R D . L
W
A Y
.DR
ELADNELLAH
.DR
MAHGNIKCUB
SHERBROOK WAY
LAKE DR.
HASLETT RD.
TONAWANDA BAYSHORE CLIFFDALE DR. RABY RD. (vac. 1998) WOODSIDE DR. FLAMINGO
NESTOR W BUCKINGHAM WILSHIRE RD. CT. HITE ASH
LN.
.TS TTIBBAB YERETNOM
.TS
NOTLRAC
E.
V A
O L L E B E T N
O M .DR
HSRAM
.TS
NOSDE
.TS
RETTOP
.TS
WAHS
LAKE LANSING RD. PARK ST.
LAKE CT.
COLBY ST.
.TS
SUNITRAM
Taylor
Ct
Hillcurve Ave.
on
.tS
egdoH
.RD
GOLYAB
M
A
R
S H
R D .
PIKE ST.
W OODWIND TRL.
C
O
LU
M
B BUCKTHORN IA PEPPERIDGE S T .
LAKE LANSING
PARK SOUTH
DR.
RIDGEWAY P INE
R IDG
E
DR
.
R.
D
E K A
L
E.
HICKORY ISLAND DR.
.RD
WEIVLLIH
(vac. 4/15/82)
(vac. 8/26/97)
).cav(
.ts nosde
453 AC.
L A
K
E
V
IE
vac. 1/21/99 W S T .
PINE LAKE DRAIN
vac. 1/28/97
alley
alley N (vac. 9/26/97)
AI R
D E K A L E N
PI alley (vac. 10/01/01)
P IN E L RALYA A K (vac. 7/10/97) SCHOOL E D R L A I R B E R A ARY A
IN
FRANKLIN ST.
JEFFRIES DRAIN
HASLETT
.TS
LOOHCS
PROJECT LOCATION
CAPITAL
THE PROJECT IS LOCATED WITHIN 400' FROM LAKE LANSING.
TAX ID: 11-302-039
LOT 2 & A PART OF LOTS 1 & 7 SUPR PLAT OF HASLETT ALSO PART OF LOTS 57 & 66 SUPR PLAT OF HASLETT NO. 1
DESC AS BEG AT THE SW COR LOT 2 - N 01 DEG 32'16"E ON E LOT LN 304.30 FT - N 59 DEG 24'39"E ON N LN LOT 7 & S
LN OF GTW RR 120.09 FT - S 0 DEG 37'54" E 78.73 FT TO SE COR LOT 7 - N 89 DEG 28' E 5.75 FT - S 0 DEG 37'40" E
300.27 FT - N 84'59" W 5.75 FT - N 0 DEG 37'54" W 150 FT - N 83 DEG 42'41" W 58.24 FT - S 0 DEG 37'54" E 150 FT - N 83
DEG 21'12" W 58.23 FT TO THE POB SEC 11 T 4 N R 1 W
TAX ID: 11-302-005
MP 2850 LOT 65 SUPERVISOR'S PLAT OF HASLETT NO. 1.
TAX ID: 11-302-006
MP 2851 2852 THAT PT OF LOT 66 DESC AS COM AT PT 5.75 FT S 84 DEG E OF SW COR OF LOT 66, S 84 DEG E 93.25
FT TO NE COR OF LOT 56, SUP PLAT OF HASLETT- N TO S LINE OF LOT 65- W'LY ALONG SAID S LINE OF LOT 65 TO A
PT 5.75 FT E'LY OF W LINE OF LOT 66- S PLL WITH W LINE OF LOT 66 TO BEG SUP PLAT OF HASLETT NO 1
TAX ID: 11-302-025
MP 2853 & 2854 LOT 67 ENTIRE & THAT PT OF LOT 66 COM AT NE COR OF LOT 56, SUP PLAT OF HASLETT- TH N TO S
LINE OF LOT 65, SUP PLAT OF HASLETT- E 25 FT- N 112.3 FT ON E LINE OF SAID LOT 65 TO RAILROAD ST- NE'LY 82
FT- E 114 FT TO NE COR OF LOT 66, S 209 FT TO NE COR OF LOT 67, - N 84 DEG W 10 FT TO NW COR OF LOT 67- S
132 FT TO SW COR OF LOT 67- N 84 DEG W 196 FT TO BEG SUPERVISOR'S PLAT OF HASLETT NO 1
TAX ID: 11-302-036
MP 2855 2862-63 VACATED RAILROAD STREET. ALSO A PART OF LOT 68 SUP PLAT OF HASLETT NO. 1 DESC AS ,
BEG @ THE NE COR. OF SAID LOT 68 -S 0 DEG 15'47"E, ON LOT LN. 147.46 FT. TO THE NE COR. LOT 77 SAID PLAT -N
89 DEG 50'24"W, 131.55 FT. TO NW COR. LOT 77 -S 0 DEG 25'14"W, 210 FT. M/L TO SW COR. LOT 74 SAID PLAT -N 89
DEG 51'55"W, 118.62 FT. -S 0 DEG 23'24"W, 122.92 FT. -N 84 DEG 54'40"W, 132 FT. TO NW COR LOT 51 SUP. PLAT OF
HASLETT -N 0 DEG 23'24"E, 209 FT. TO NE COR LOT 66 -W. TO RAILROAD ST. -NE'LY ALONG RAILROAD ST TO P.O.B.
SEC 11 T4N,R1W
SOIL EROSION & SEDIMENTATION CONTROL NOTES
1. All soil erosion and sediment control (SESC) work shall conform to the standards and
specifications of the Ingham County Drain Commissioner's Office and Meridian Township.
2. Daily inspections shall be made by the contractor for effectiveness of SESC measures. Any
necessary repairs shall be performed without delay.
3. Erosion of any sediment from work on the site shall be contained on-site and not allowed to collect
on any off-site areas or in waterways. Waterways include both natural and man-made open
ditches, streams, storm drains, lakes, ponds, and wetlands.
4. The Contractor shall apply temporary SESC measures when required and as directed on these
plans. The Contractor shall remove temporary measures as soon as permanent stabilization of
slopes, ditches, and other changes have been established.
5. Staging the work shall be done by the Contractor as directed in these plans and as required to
ensure progressive stabilization of disturbed earth.
6. Soil erosion control practice shall be established in the early stages of construction by the
Contractor. Sedimentation control practices shall be applied as a perimeter defense against any
transporting of soil off the site.
7. The Contractor shall preserve natural vegetation as much as possible.
8. Vegetative stabilization of all disturbed areas shall be established within 15 days of completion of
the final grading.
REVISIONS:
Meridian Charter Township
DATE BY: COMMENTS:
Ingham County, Michigan
07.31.26 CH BID PLANS
Call before you dig.
PATHWAY
MSU TO LAKE LANSING PHASE III -
LAND PRESERVE PATHWAY
NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET:
INGHAM COUNTY, MICHIGAN
9 - SESC NOTES AND DETAILS
DRAWN BY: CH CHECKED BY: YI
72'
YRAUNAJ
YRAURBEF
HCRAM
LIRPA
YAM
ENUJ YLUJ
TSUGUA
REBMETPES
REBOTCO
REBMEVON REBMECED
RECOMMENDED CONSTRUCTION
SCHEDULING & SEQUENCING
INSTALL SESC MEASURES
GRADE PATHWAY
PAVE PATHWAY AND INSTALL FENCE
SITE CLEANUP AND RESTORATION
REMOVE SESC MEASURES
gwd.evreserP
dnaL
-
SLIATED
dna
NALP
CSES\snalP\SNALP
NGISED\SNALP\evreserP
dnaL
III
hP
gnisnaL
ekaL
ot
USM\6202\stcejorP\sklawediS
&
syawhtaP\skroW
cilbuP
&
gnireenignE\:G
SOILS
Na NAPOLEON MUCK
Sb SEBEWA LOAM 0 - 2%
UeB URBAN LAND BOYER-SPINKS COMPLEX 0 TO 10%
| LEGEND THE PATHWAY IS DESIGNED TO BE CONSTRUCTED PROPERTY LINE ENTIRELY ON FILL (ASPHALT MILLINGS) TO LIMIT THE FENCE SEE SHEET 11 EARTH DISTURBANCE AND SPREAD OF INVASIVE PLANTS. ASPHALT PATHWAY CONCRETE PATHWAY LANDING PAD WETLAND INVASIVE PLANT INVASIVE PLANT, NOT TO BE DISTURBED (TYP.) 11 PROP. GRADE TEEHS EES EXIST. GROUND BENCHMARK TOP OF POST: 867.52' PATHWAY PROFILE SCALE: 1"=40' HORZ. 1"=4' VERT. HASLETT ROAD REVISIONS: Meridian Charter Township DATE BY: COMMENTS: Ingham County, Michigan 07.31.26 CH BID PLANS Call before you dig. PATHWAY MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET: INGHAM COUNTY, MICHIGAN 10 - GRADING PLAN DRAWN BY: CH CHECKED BY: YI | |||||||
|---|---|---|---|---|---|---|---|
| LEGEND THE PATHWAY IS DESIGNED TO BE CONSTRUCTED PROPERTY LINE ENTIRELY ON FILL (ASPHALT MILLINGS) TO LIMIT THE FENCE SEE SHEET 11 EARTH DISTURBANCE AND SPREAD OF INVASIVE PLANTS. ASPHALT PATHWAY CONCRETE PATHWAY LANDING PAD WETLAND INVASIVE PLANT INVASIVE PLANT, NOT TO BE DISTURBED (TYP.) 11 PROP. GRADE TEEHS EES EXIST. GROUND BENCHMARK TOP OF POST: 867.52' PATHWAY PROFILE SCALE: 1"=40' HORZ. 1"=4' VERT. HASLETT ROAD REVISIONS: Meridian Charter Township DATE BY: COMMENTS: Ingham County, Michigan 07.31.26 CH BID PLANS Call before you dig. PATHWAY MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET: INGHAM COUNTY, MICHIGAN 10 - GRADING PLAN DRAWN BY: CH CHECKED BY: YI | |||||||
| Meridian Charter Township Ingham County, Michigan PATHWAY | REVISIONS: | ||||||
| DATE | BY: | COMMENTS: | |||||
| 07.31.26 | CH | BID PLANS | |||||
| MSU TO LAKE LANSING PHASE III - LAND PRESERVE PATHWAY NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, INGHAM COUNTY, MICHIGAN | |||||||
| SHEET: 10 - GRADING PLAN | |||||||
| DRAWN BY: CH | CHECKED BY: YI |
| P | ROP. GR | ADE | |||||||||||||||
| EXIST. | GROU | ND | |||||||||||||||
LEGEND
PROPERTY LINE
FENCE
SEE SHEET 11
ASPHALT PATHWAY
CONCRETE PATHWAY
LANDING PAD
WETLAND
INVASIVE PLANT, NOT TO
BE DISTURBED (TYP.)
PROP. GRADE
EXIST. GROUND
BENCHMARK TOP OF
POST: 867.52'
PATHWAY PROFILE
SCALE: 1"=40' HORZ. 1"=4' VERT.
HASLETT
ROAD
REVISIONS:
Meridian Charter Township
DATE BY: COMMENTS:
Ingham County, Michigan
07.31.26 CH BID PLANS
Call before you dig.
PATHWAY
MSU TO LAKE LANSING PHASE III -
LAND PRESERVE PATHWAY
NE 1/4 AND SW 1/4 SECTION 11, T4N, R1W, MERIDIAN TOWNSHIP, SHEET:
INGHAM COUNTY, MICHIGAN
10 - GRADING PLAN
DRAWN BY: CH CHECKED BY: YI
gwd.evreserP
dnaL
NALP
GNIDARG\snalP\SNALP
NGISED\SNALP\evreserP
dnaL
III
hP
gnisnaL
ekaL
ot
USM\6202\stcejorP\sklawediS
&
syawhtaP\skroW
cilbuP
&
gnireenignE\:G
11
TEEHS
EES
THE PATHWAY IS DESIGNED TO BE CONSTRUCTED
ENTIRELY ON FILL (ASPHALT MILLINGS) TO LIMIT THE
EARTH DISTURBANCE AND SPREAD OF INVASIVE PLANTS.
INVASIVE PLANT
See Also
General Information Document ID RFP-171-260000002566-1 Status Open Description 751/26404.MNB; Harley BAS - BAS
State of Michigan
Due by 10/08/2026