Ellison Meadows Fence Restoration
| Agency: | AGRICULTURE, DEPARTMENT OF |
|---|---|
| State: | Nevada |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Dec 4, 2024 |
| Due Date: | Feb 14, 2025 |
| Solicitation No: | 1240LT25B0001 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Presolicitation (Updated)
- Updated Published Date: Dec 04, 2024 12:47 pm PST
- Original Published Date: Dec 04, 2024 10:30 am PST
- Updated Response Date: Feb 14, 2025 09:00 am PST
- Original Response Date: Feb 14, 2025 09:00 am PST
- Inactive Policy: 15 days after response date
- Updated Inactive Date: Mar 01, 2025
- Original Inactive Date: Mar 01, 2025
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 5660 - FENCING, FENCES, GATES AND COMPONENTS
-
NAICS Code:
- 238990 - All Other Specialty Trade Contractors
-
Place of Performance:
NVUSA
The intent of this project is to remove and replace approximately 13.1 miles of existing barbwire fence lines near Ellison Meadows on the Ely Ranger District, Humboldt- Toiyabe National Foest.
B. This project includes the removal of approximately 69,064 feet of existing barbwire fence as a lump sum. Approximately 69,064 feet of new barbwire fence are to be installed including an estimated fifteen 12-foot wire gates. All brace and anchor posts are to be schedule-40, galvanized steel except for wood posts located at the wire gates. Clearing of vegetation is allowed as needed to ensure a straight fence, however heavy equipment will not be allowed to clear the fence lines. Chainsaws are allowed for vegetation clearing. Fence runs should not deviate more than 12-inches from a straight line between braces.
C. The Schedule A work includes removing and replacing barbwire fences in locations A, B, and C.
D. The Option A work includes removing and replacing barbwire fences in locations D, E, F, G, H, I and J.
E. Work shall be performed in accordance with specifications and drawings in the plan sheets, followed by the ‘Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14).’
- SUPERVISOR'S OFFICE 1200 FRANKLIN WAY
- SPARKS , NV 89431
- USA
- Derrick Dodson
- derrick.dodson@usda.gov
- Dec 04, 2024 12:47 pm PSTPresolicitation (Updated)
- Dec 04, 2024 10:30 am PST Presolicitation (Original)
Related Document
| Dec 20, 2024 | [Solicitation (Original)] Ellison Meadows Fence Restoration |
| Jan 30, 2025 | [Solicitation (Updated)] Ellison Meadows Fence Restoration |
See Also
Bid Solicitation # 43ADG-S4000 Bid Solicitation # 43ADG-S4000 Organization Name Adjutant General Contract
State Government of Nevada
Due by 9/24/2026
Bid Solicitation # 80DOT-S4003 Bid Solicitation # 80DOT-S4003 Organization Name Department of Transportation
State Government of Nevada
Due by 9/30/2026