Electric Vehicle (EV) Chargers: Phase 4 Round 3
| Agency: | Efficiency Maine |
|---|---|
| State: | Maine |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Apr 16, 2025 |
| Due Date: | Jul 1, 2025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
RFP EM-017-2025
Phase 4 Round 3
Efficiency Maine (Efficiency Maine Trust or the Trust) seeks qualified bidders to rapidly install and operate public Level 3/DC fast chargers and/or Level 2/AC chargers for electric vehicles (EVs) in select Maine locations: Presque Isle, Fort Kent, Medway, Baileyville or within 15 miles thereof, Howland, Sherman, Turner, Hermon, Blue Hill or within 15 miles thereof, Milbridge, Caribou, and along Route 11 from Portage Lake to Masardis.
Efficiency Maine will consider bids that propose upgrading existing locations as well as bids that propose installing new locations. Bids that propose to upgrade existing locations are NOT eligible for a demand charge or battery incentive. Efficiency Maine will also consider bids that propose serving only one location as well as bids that propose serving multiple locations. Efficiency Maine has a limited budget and may not issue an award for all eligible locations.
This RFP is a continuation of earlier RFPs (“Phase 4” and “Phase 4 Round 2”). It prioritizes areas that have not been commissioned. The scope of work, incentive structure, and scoring criteria have been updated based on feedback from previous RFPs.
This RFP uses funds from the Maine Jobs and Recovery Plan (MJRP), which Maine must expend before the end of 2026. Projects awarded under this RFP must be commissioned by 6/1/2026, and awardees must submit reimbursement requests for capital and battery incentives by 7/1/2026.
Documents- Request for Proposal (PDF)
- Attachment A – Project Cost Proposal Form (.xlsx)
- Attachment B – Standard Agreement (.docx)
-
Attachment C – Utility Load Form – Central Maine Power
(.xlsx)
-
To initiate a cost opinion for new three-phase power in CMP territory:
- Call New Service Team 1-866-225-4200
- Create an Account unless you will be connecting to an existing meter.
- Create a Notification for cost opinion with a location.
- For questions about utility capacity and rate structures in CMP territory, contact Aaron Smith ( Aaron.Smith@cmpco.com ; 207-414-9313 )
-
To initiate a cost opinion for new three-phase power in CMP territory:
-
Attachment D – Utility Load Form – Versant Power (See hyperlinks below for relevant Load Sheet)
-
To initiate a cost opinion for new three-phase power in Versant territory:
- Call Customer Contact Center ( 207-973-2000 ) with the physical address of the location where work is to be completed.
- Submit appropriate Load Sheet ( Bangor Hydro District or Maine Public District ) via email to loadsheet@versantpower.com .
- Locations with a battery must follow Versant’s Distribution & Interconnection Process .
-
To initiate a cost opinion for new three-phase power in Versant territory:
- Attachment E – W-9 (PDF)
- For questions about utility capacity and rate structures in Eastern Maine Electric Cooperative, contact Charlie McAlpin ( cmcalpin@emec.com ; 207-454-1524 )
- Host Site Interest Form (Phase 4 Round 3)
- List of EV Charging Service Providers (PDF)
- Maine Accessible EV Charging Guide and Checklists: Guide to locating and installing accessible and usable AC Level 2 and Level 3 electric vehicle chargers for public use.
See Also
Description Opening Date/Time Closing Date/Time Request for Proposals: 2026/2027 Chevrolet Tahoe 4WD Police
Cumberland County
Due by 9/28/2026
Bid Number: P27-22 Bid Title: 3/4 Ton Trucks (2) Category: Vehicles Status: Open
City of Bangor
Due by 9/30/2026
Bid Number: P27-15 Bid Title: Log Loader Trailer Category: Equipment Services & Purchase
City of Bangor
Due by 9/23/2026
RFP EM-008-2026 Public Level 2 Electric Vehicle Chargers Efficiency Maine seeks qualified bidders
Efficiency Maine
Due by 3/03/2027