EIE488 - REPLACE GENERATORS AT CHPP, EIELSON AIR FORCE BASE, ALASKA
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Alaska |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | 8(a) Set-Aside (FAR 19.8) |
| Posted Date: | Jul 31, 2025 |
| Due Date: | May 2, 2025 |
| Solicitation No: | W911KB25RA010 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: Jul 31, 2025 02:11 pm AKDT
- Original Published Date: Mar 26, 2025 05:47 pm AKDT
- Updated Date Offers Due: May 02, 2025 12:00 pm AKDT
- Original Date Offers Due: Apr 25, 2025 03:00 pm AKDT
- Inactive Policy: Manual
- Updated Inactive Date: Apr 24, 2026
- Original Inactive Date: Mar 27, 2026
-
Initiative:
- None
- Original Set Aside: 8(a) Set-Aside (FAR 19.8)
- Product Service Code: Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
-
NAICS Code:
- 236220 - Commercial and Institutional Building Construction
-
Place of Performance:
POWER PLANT B6203, EIELSON AIR FORCE BASE, ALASKA 99702
***********************************************************************
THIS IS TO IDENTIFY THE CONTRACTORS SELECTED TO MOVE TO PHASE 2 FOR THIS ACQUISITION. THE THREE CONTRACTORS ARE AS FOLLOWS:
BRISTOL BUILDING CONSTRUCTORS, LLC
RED POINT CONSTRUCTION, LLC
STG PACIFIC, LLC
***********************************************************************
This is a Design Build project to design and replace the existing four 1,500 kW standby generators and associated electrical equipment that provide primary power to the Eielson Air Force Base (EAFB) Power Plant Building B6203. The two bulk fuel storage tanks are to remain but are required to be inspected and a status report provided, detailing any concerns, issues and deficiencies. The bulk fuel tank fuel gauge equipment is not functioning and must be replaced. The signage for the generators and bulk fuel storage tanks must be replaced.
Contractor must maintain a minimum of 4,500kW (standby rated) power and 4,095kW (Prime rated) power available for the site and power plant from April 15th through September 15th. The contractor must maintain a minimum of 3,000kW (standby rated) power and 2,730kW (Prime rated) power available for the site and power plant from May 1st to July 31st. All other times of the year the contractor is not allowed to shut down a generator. 30-day notification of anticipated electrical shutdowns are required. The contractor must provide construction phasing plan, schedule, and assumptions in the Engineering Considerations and Instructions for Field Personnel (ECIFP) Report and within the design drawings and specifications.
- CONTRACTING OFFICE KO 2204 3RD STREET
- ANCHORAGE , AK 99506-0898
- USA
- Mark Corn
- mark.r.corn@usace.army.mil
- Phone Number 9077532817
- THERESA AFRANK
- THERESA.M.AFRANK@USACE.ARMY.MIL
- Phone Number 9077532739
- Jul 31, 2025 02:11 pm AKDTSolicitation (Updated)
- Apr 24, 2025 08:42 am AKDT Solicitation (Updated)
- Apr 18, 2025 08:45 am AKDT Solicitation (Updated)
- Mar 26, 2025 05:47 pm AKDT Solicitation (Original)
Related Document
| Mar 8, 2025 | [Presolicitation (Original)] REPLACE GENERATORS, CHPP, EIELSON AIR FORCE BASE, ALASKA (EIE488) |
| Mar 27, 2025 | [Solicitation (Original)] EIE488 - REPLACE GENERATORS AT CHPP, EIELSON AIR FORCE BASE, ALASKA |
| Apr 18, 2025 | [Solicitation (Updated)] EIE488 - REPLACE GENERATORS AT CHPP, EIELSON AIR FORCE BASE, ALASKA |
| Apr 24, 2025 | [Solicitation (Updated)] EIE488 - REPLACE GENERATORS AT CHPP, EIELSON AIR FORCE BASE, ALASKA |
See Also
Bid Name Port Capital Improvements - Phase I ID 26-67 Status Open Categories
City of Ketchikan
Due by 12/02/2026
Basic Information Solicitation Number 2026-01 Title IFB 2026-01 UAS Juneau Campus Water Line
State Government of Alaska
Due by 11/25/2026
Lake Aleknagik SRS Facility Improvements, Project No. 71043-3 Area: Dillingham, AK Bid Opening
State Of Alaska
Due by 11/24/2026
2026-2027 Pre-Qualified Electrical Construction Contractors Response Due by Dec 31, 2027 4:00 PM
Matanuska Electric Association
Due by 12/31/2027