618-26-702 EHRM Install DDPO 2

Agency: VETERANS AFFAIRS, DEPARTMENT OF
State: Minnesota
Type of Government: Federal
FSC Category:
  • Z - Maintenance, Repair or Alteration of Real Property
NAICS Category:
  • 238210 - Electrical Contractors and Other Wiring Installation Contractors
Set Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Posted Date: May 5, 2026
Due Date: Jun 9, 2026
Solicitation No: 36C26326B0030
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Follow
618-26-702 EHRM Install DDPO 2
Active
Contract Opportunity
Notice ID
36C26326B0030
Related Notice
36C26326B0030
Department/Ind. Agency
VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
NETWORK CONTRACT OFFICE 23 (36C263)
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Solicitation (Original)
  • Original Published Date: May 05, 2026 04:12 pm CDT
  • Original Date Offers Due: Jun 09, 2026 10:00 am CDT
  • Inactive Policy: Manual
  • Original Inactive Date: Dec 31, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
  • Product Service Code: Z1DZ - MAINTENANCE OF OTHER HOSPITAL BUILDINGS
  • NAICS Code:
    • 238210 - Electrical Contractors and Other Wiring Installation Contractors
  • Place of Performance:
    Minneapolis , MN 55417
    USA
Description

The intent of this project is to provide construction services for a Department of Veteran Affairs Electronic Health Records Modernization (EHRM) project initiative and a 2026 Current State Review (CSR) at the Minneapolis VA Medical Center, One Veterans Drive, Minneapolis, MN 55417-2309. The initiative is an implementation and the deployment of new Electronic Health Record (EHR) system across federal entities and install additional Data Drop and Power Outlets (DDPO’s) as identified during the CSR assessment.




  1. The construction contractor shall supply all equipment, labor, materials, and supervision to complete project upgrades which includes the installation of Data Drops and Power Outlets, mounting of Over-Current Elements (OCE’s), Tracking Boards and Wall mounts.






  1. Conduct and incorporate pre-construction risk assessments (PCRA) and Infection Control Risk Assessments (ICRA) for air quality, infection control, noise, vibration, or any other hazards applicable to their work per Veterans Affairs (VA) Standard Environment of Care Standard (EC) 02 06 05. See ICRA Matrix of Precautions for Construction and Renovation. See Attachment 3 ICRA Assessments, Level 2 through 4 (three [3] total).






  1. Power and transmission cable pulls will be installed in separate raceways/conduits/ and or separated, per manufacturer performance data information.






  1. All data cabling to be Category CAT 6A.






  1. Install quantity (QTY) (29) CAT 6A cable drops from new Telecommunication Rooms (TRs) to identified locations. See Building Plan Views for 618-26-702 for room and wall locations of installs.

    • Telecommunication Cable pulls/drops not to exceed 300 feet for estimating purposes.

    • QTY (1) cable drop location will require QTY (29) CAT 6A cables to be pulled.

    • The QTY (29) cable drops installed within wall space to be protected in conduit requiring demolition of a wall section, repair and paint finishing.

    • Furnish and install wall boxes and cover plates as needed for network connections or power installations.

    • Follow current telecommunication or efficient routing paths above or below ceiling from Telecommunications Room (TR) patch panels to wall room outlets. All cables shall be in continuous lengths for origin to destination and secured to cable support structures per National Electric Code (NEC) requirements. (Any and all Cable splices will have to be approved by the COR)

    • All new CAT 6A cable installations shall be tested and certified. Certification reports shall be submitted to the COR Bi-Weekly.

    • All new cable pulls to be terminated at both ends. Termination locations in TR closets will be identified by site Subject Matter Experts (SME’s)

    • Contractor to follow current VA Standards for cable, patch panel, and outlet labeling. All labels to be machine generated (not hand-written) using labeling software or machine.



  2. Install QTY (50) duplex 120 Volts Alternating Current (VAC) emergency power sourced outlets.




  • Contractor to consider emergency power installations not to exceed 250 feet.



      • Contractor to conduct a load test in the nearest junction box to verify the suitability for both new and existing outlets.

      • The combined loads in a circuit shall not exceed 80% of the circuit’s total load capacity.



    • If extending from an existing junction box to surface mounted raceway, flexible conduit may be used if it does not exceed 6 feet in length.






  1. Analog Phone List. Contractor to complete all work in accordance with:

    • VA standards and Construction Specifications.

    • NEC Standards

    • Office of Electronic Health Record Modernization (OEHRM) Site Infrastructure, and End user Device (EUD) requirements (Latest Revision)

    • Office of Information Technology (OIT) Design Guide, and design templates

    • Infrastructure Standard for Telecommunication Spaces (ISTS) (Latest Version).



  2. Replace any damaged ceiling tiles due to the course of work.

  3. Touchup/repair/paint and damaged walls or ceilings due to new installation of wire and cable, conduit installations,etc. This project shall be completed within Ninety-Five (95) calendar days once NTP is issued.


Attachments/Links
Contact Information
Contracting Office Address
  • 316 Robert Street N Suite 506
  • Saint Paul , MN 55101
  • USA
Primary Point of Contact
Secondary Point of Contact
History

Related Document

Apr 22, 2026[Presolicitation (Original)] 618-26-702 EHRM Install DDPO 2
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

26-40 Garage Door Replacement - Public Works Maintenance Garage City of Bloomington is

City of Bloomington

Bid Due: 8/25/2026

Bid Title: 26-01 - Rice Lake Woods Area Street Rehabilitation Category: General bid

City of Maple Grove

Bid Due: 2/01/2027

Bid Title: 26-13 - 2026 Sanitary Sewer Forcemain Category: General bid opportunities Status:

City of Maple Grove

Bid Due: 8/30/2026

Follow B752 Repair Facade and Tuckpointing Active Contract Opportunity Notice ID FA663326Q0007 Related

DEPT OF DEFENSE

Bid Due: 8/19/2026