EDSON WILDFIRE RECLAMATION of WILDHAY COMPLEX 2023

Agency: Government of Alberta
State: Alberta
Type of Government: State & Local
Posted Date: Oct 31, 2024
Due Date: Nov 28, 2024
Solicitation No: AB-2024-09214
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Open & competitive opportunity
Open
Forestry and Parks
Request for Proposal
EDSON WILDFIRE RECLAMATION of WILDHAY COMPLEX 2023
Alberta Forestry and Parks, in its mandate to prevent and suppress wildfires within the Province is required to reclaim disturbed forest land caused by wildfire suppression operations. These sites were essential for effective wildfire operations and include fireguards, creek crossings, pipeline crossings, and helipads. Wildfire reclamation is required to prevent or reduce the potential of soil erosion and ensure soil stabilization on or near the fire line. Reclamation of disturbances also promotes the recovery of the disturbed land base for wildlife habitat (i.e. caribou) and vegetative growth. Due to soil conditions, the reclamation work must be done when the ground conditions are in a frozen state.

The Wildhay Complex consists of two wildfires; EWF-037, located at N53 54.603 W117 33.543 and EWF-040, located at N53 56.135 W117 46.570.

EWF-037 is 554.3 hectares in size. During suppression efforts, there was approximately 20 km of fireguard constructed. This involves heavy equipment pushing ground vegetation (shrubs, grasses, and trees) aside to expose mineral soil and restrict/slow wildfire progression. To assist ground crews; 3 stream crossings, 1 pipeline crossing and 1 staging area were built and will require reclamation as well.

EWF-040 is 607.5 hectares in size. During suppression efforts, there was approximately 18 km of fireguard constructed. This involves heavy equipment pushing ground vegetation (shrubs, grasses, and trees) aside to expose mineral soil and restrict/slow wildfire progression. To assist ground crews; 2 helipads, 1 stream crossing, 1 pipeline crossing and 1 staging area were built and will need reclamation as well.

Reclamation with mechanical equipment is required to recover the land base to a near natural state. The fireguard travels through mainly spruce and pine stands, taking advantage of natural clearings when possible. Reclaiming the fireguard will require pulling back the topsoil, woody debris, and any displaced trees onto the grubbed fire guard. The trees are to be broken up mechanically or manually slashed so to be made to lie flat to the ground. Leaning or damaged trees that cannot be reached mechanically without causing significant additional damage to the forest, will be manually felled and/or bucked to lie flat to the ground.
APC Reference # AB-2024-09214
Category Services
Posting Date • Time Oct 31, 2024 • 8:59 am (MT)
Closing Date • Time Nov 28, 2024 • 2:00:59 pm (MT)
Region(s) of Delivery Alberta
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Basic Information APC Reference # AB-2026-06342 Internal Reference # Project ID. 005849.01 Title

Government of Alberta

Due by 10/01/2026

Basic Information APC Reference # AB-2026-06389 Internal Reference # 2026-09 Title RFQ #2026-09:

Government of Alberta

Due by 10/19/2026

Basic Information APC Reference # AB-2026-06308 Internal Reference # RFP 2026-0132 Title Arc

Government of Alberta

Due by 10/01/2026

Basic Information APC Reference # AB-2026-05906 Internal Reference # 27TDRPARREV05 Title FACILITY OPERATING

Government of Alberta

Due by 10/13/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.