Edison High School CTE Shade Structure Project

Agency: Stockton Unified School District
State: California
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
Posted Date: Jun 11, 2026
Due Date: Jun 30, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
  • Edison High School CTE Shade Structure Project - Bid No. 26-21

    DIV 00 & 01 PROJECT BID MANUAL - EDISON CTE SHADE STRUCTURE

    DSA 103 - EDISON CTE SHADE STRUCTURE

    DSA APPROVED DRAWINGS- EDISON CTE SHADE STRUCTURE DRAWINGS

    SIGNED STOCKTON USD CWTA PLA

  • Attachment Preview

    TYPE BY TYPE BY
    S1 | SOILS - GENERAL C1 | CAST-IN-PLACE CONCRETE
    S1a: Site Preparation See Notes PI C1a: Mix Design C1b: Reinforcing Steel C1c: Concrete Material C1d: Strength Test C1e: Batch Plant Inspection Continuous Test Test Test Periodic SI LOR LOR LOR SI
    S2 | COMPACTION AND FILL
    S2a: Fill Materials S2b: Fill Placement S2c: Compaction Test Continuous Test LOR* LOR* LOR*
    S3 | DRIVEN DEEP FOUNDATIONS (PILES) C2 | PRESTRESSED CONCRETE
    S3a: Materials and Members S3b: Pile Capacity S3c: Driving Operations S3d: Pile Installation S3e: Specialty Piles Continuous Test Continuous Continuous * GE* LOR* GE* GE* * C2a: Tendons and Anchorage C2b: Tendon Placement C2c: Concrete Strength C2d: Stressing Operations Test Periodic Periodic Continuous LOR SI SI SI
    C3 | PRECAST CONCRETE
    S4 | CAST-IN-PLACE DEEP FOUNDATIONS (PIERS) C3a: General Fabrication C3b: General Erection C3c: Diaphragm Connections C3d: Diaphragm Tolerances Continuous Periodic Continuous Periodic SI SI* SI SI
    S4a: Drilling Operations S4b: Pier Construction S4c: Bearing Strata Continuous Continuous Continuous PI PI GE*
    S5 | RETAINING WALLS C4 | SHOTCRETE
    S5a: Backfill Placement S5b: Soil Reinf. and Drainage S5c: Segmental Retaining Walls Continuous Continuous Continuous GE* GE* GE* C4a: Placement C4b: Shotcrete Material Continuous Test SI LOR
    C5 | POST-INSTALLED ANCHORS
    S6 | OTHER SOILS C5a: Inspection C5b: Test See notes Test SI* LOR
    S6a: Soil Improvement Test S6b: Soil Improvement Inspection S6c: Not used. S6d: Not used. S6e: Not used. S6f: Not used. S6g: Not used. S6h: Not used. S6i: Not used. S6j: Not used. S6k: Not used. S6l: Not used. S6m: Not used. S6n: Not used. Test Continuous N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A GE* GE* N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
    C6 | OTHER CONCRETE
    C6a: Not used. C6b: Not used. C6c: Not used. C6d: Not used. C6e: Not used. C6f: Not used. C6g: Not used. C6h: Not used. C6i: Not used. C6k: Not used. C6l: Not used. Not used. N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
    * See Appendix for additional information. * See Appendix for additional information.

    103-22
    Test Mark
    LIST OF STRUCTURAL TESTS AND SPECIAL INSPECTIONS
    Project has a geotechnical report or construction documents require special inspection by a geotechnical engineer.
    Project does NOT have and does NOT require a geotechnical report.
    TYPE BY TYPE BY
    S1 | SOILS - GENERAL C1 | CAST-IN-PLACE CONCRETE
    S1a: Site Preparation See Notes PI C1a: Mix Design Continuous SI
    S2 | COMPACTION AND FILL C1b: Reinforcing Steel Test LOR
    S2a: Fill Materials Test LOR* C1c: Concrete Material Test LOR
    S2b: Fill Placement Continuous LOR* C1d: Strength Test Test LOR
    S2c: Compaction Test LOR* C1e: Batch Plant Inspection Periodic SI
    S3 | DRIVEN DEEP FOUNDATIONS (PILES) C2 | PRESTRESSED CONCRETE
    S3a: Materials and Members Continuous GE* C2a: Tendons and Anchorage Test LOR
    S3b: Pile Capacity Test LOR* C2b: Tendon Placement Periodic SI
    S3c: Driving Operations Continuous GE* C2c: Concrete Strength Periodic SI
    S3d: Pile Installation Continuous GE* C2d: Stressing Operations Continuous SI
    S3e: Specialty Piles * * C3 | PRECAST CONCRETE
    S4 | CAST-IN-PLACE DEEP FOUNDATIONS (PIERS) C3a: General Fabrication Continuous SI
    S4a: Drilling Operations Continuous PI C3b: General Erection Periodic SI*
    S4b: Pier Construction Continuous PI C3c: Diaphragm Connections Continuous SI
    S4c: Bearing Strata Continuous GE* C3d: Diaphragm Tolerances Periodic SI
    S5 | RETAINING WALLS C4 | SHOTCRETE
    S5a: Backfill Placement Continuous GE* C4a: Placement Continuous SI
    S5b: Soil Reinf. and Drainage Continuous GE* C4b: Shotcrete Material Test LOR
    S5c: Segmental Retaining Walls Continuous GE* C5 | POST-INSTALLED ANCHORS
    S6 | OTHER SOILS C5a: Inspection See notes SI*
    S6a: Soil Improvement Test Test GE* C5b: Test Test LOR
    S6b: Soil Improvement Inspection Continuous GE* C6 | OTHER CONCRETE
    S6c: Not used. N/A N/A C6a: Not used. N/A N/A
    S6d: Not used. N/A N/A C6b: Not used. N/A N/A
    S6e: Not used. N/A N/A C6c: Not used. N/A N/A
    S6f: Not used. N/A N/A C6d: Not used. N/A N/A
    S6g: Not used. N/A N/A C6e: Not used. N/A N/A
    S6h: Not used. N/A N/A C6f: Not used. N/A N/A
    S6i: Not used. N/A N/A C6g: Not used. N/A N/A
    S6j: Not used. N/A N/A C6h: Not used. N/A N/A
    S6k: Not used. N/A N/A C6i: Not used. N/A N/A
    S6l: Not used. N/A N/A C6k: Not used. N/A N/A
    S6m: Not used. N/A N/A C6l: Not used.
    S6n: Not used. N/A N/A Not used.
    * See Appendix for additional information. * See Appendix for additional information.
    Project Name: Edison High School Application No.: 02-123614 Increment:
    School District: Stockton Unified File No.: 39-H7
    DGS DSA 130 (3R-e2v2i s(eRde v1i2s/e0d1 7/2/32)4 /25) Page 1 of 4 2 of 10
    DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

    TYPE BY TYPE BY
    M1 | STRUCTURAL MASONRY S/A1 | STEEL AND ALUMINUM
    f'm PSI:
    M1a: Mill Certificates - Reinf. M1b: Material Certificates M1c: Strength Test M1d: Mortar Proportions M1e: Grout Proportions M1f: Batch Plant Inspection M1g: Core Tests M1h: Prisms M1i: Dowels and Supports M1j: Reinforcement and Members M1k: Reinforcement Placement M1l: Grout Placement M1m: Unit Layup and Joints M1n: Cold/Hot Weather Work M1o: Anchors and Embeds M1p: Grout Cavity Periodic Test Test Periodic Periodic Test Continuous Periodic Periodic Continuous Continsuous Periodic Periodic Continuous Continuous SI* LOR LOR SI SI SI LOR SI SI SI SI SI SI* SI SI SI S/A1a: Material Identification S/A1b: Unidentified Material S/A1c: Steel Fabrication S/A1d: Buckling Restrained Brace Periodic Test Periodic Test* * LOR SI LOR
    S/A2 | HIGH-STRENGTH BOLTS
    S/A2a: Product Verification S/A2b: Bolts, Nuts, and Washers S/A2c: Snug Tight S/A2d: Pretensioned / Slip-Critical Periodic Test Periodic * SI LOR SI SI
    S/A3 | WELDING
    S/A3a: Weld Material S/A3b: Certificate of Compliance S/A3c: WPS and Qualifications Periodic Periodic Periodic SI SI SI
    S/A4 | SHOP WELDING
    S/A4a: Weld Category A S/A4b: Weld Category B S/A4c: Stairs and Railing S/A4d: Reinf. Steel Weldability S/A4e: Reinforcing Steel Continuous Periodic Periodic Periodic Continuous SI SI SI SI SI
    M2 | VENEER OR GLASS BLOCK PARTITIONS
    M2a: Mortar and Grout M2b: Unit Layup and Joints M2c: Wires and Connector M2d: Anchors and Embeds M2e: Cold/Hot Weather Work M2f: Adhered Veneer Bond Periodic Periodic Periodic Periodic Periodic Test SI SI SI SI SI* LOR
    S/A5 | FIELD WELDING
    S/A5a: Weld Category A S/A5b: Weld Category B S/A5c: End Welded Studs S/A5d: Deck Welds S/A5e: Cold-Formed Steel S/A5f: Stairs and Railing S/A5g: Reinf. Steel Weldability S/A5h: Reinforcing Steel Continuous Periodic Periodic Periodic Periodic Periodic Periodic Continuous SI SI SI SI SI SI SI SI
    M3 | POST-INSTALLED ANCHORS
    M3a: Inspection M3b: Test Varies* Test SI* LOR
    M4 | OTHER MASONRY
    M4a: Not used. M4b: Not used. M4c: Not used. M4d: Not used. M4e: Not used. M4f: Not used. M4g: Not used. M4h: Not used. M4i: Not used. M4j: Not used. M4k: Not used. M4l: Not used. M4m: Not used. N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
    S/A6 | NONDESTRUCTIVE TESTING
    S/A6a: Ultrasonic S/A6b: Magnetic Particle S/A6c:Not used. S/A6d:Not used. S/A6e:Not used. Test Test N/A N/A N/A LOR LOR N/A N/A N/A
    S/A7 | STEEL JOISTS AND TRUSSES
    S/A7a: Fabrication Continuous SI
    S/A8 | SPRAYED FIRE-RESISTANT MATERIALS
    S/A8a: Surface and Installation S/A8b: Density S/A8c: Bond: Adhesion/Cohesion Periodic Test Test SI LOR LOR
    * See Appendix for additional information. * See Appendix for additional information.

    DSA 103 - 22
    LIST OF STRUCTURAL TESTS AND SPECIAL INSPECTIONS
    TYPE BY TYPE BY
    M1 | STRUCTURAL MASONRY S/A1 | STEEL AND ALUMINUM
    f'm PSI:
    M1a: Mill Certificates - Reinf. Periodic SI* S/A1a: Material Identification Periodic *
    M1b: Material Certificates Test LOR S/A1b: Unidentified Material Test LOR
    M1c: Strength Test Test LOR S/A1c: Steel Fabrication Periodic SI
    M1d: Mortar Proportions Periodic SI S/A1d: Buckling Restrained Brace Test* LOR
    M1e: Grout Proportions Periodic SI S/A2 | HIGH-STRENGTH BOLTS
    M1f: Batch Plant Inspection SI S/A2a: Product Verification Periodic SI
    M1g: Core Tests Test LOR S/A2b: Bolts, Nuts, and Washers Test LOR
    M1h: Prisms Continuous SI S/A2c: Snug Tight Periodic SI
    M1i: Dowels and Supports Periodic SI S/A2d: Pretensioned / Slip-Critical * SI
    M1j: Reinforcement and Members Periodic SI S/A3 | WELDING
    M1k: Reinforcement Placement Continuous SI S/A3a: Weld Material Periodic SI
    M1l: Grout Placement Continsuous SI S/A3b: Certificate of Compliance Periodic SI
    M1m: Unit Layup and Joints Periodic SI* S/A3c: WPS and Qualifications Periodic SI
    M1n: Cold/Hot Weather Work Periodic SI S/A4 | SHOP WELDING
    M1o: Anchors and Embeds Continuous SI S/A4a: Weld Category A Continuous SI
    M1p: Grout Cavity Continuous SI S/A4b: Weld Category B Periodic SI
    M2 | VENEER OR GLASS BLOCK PARTITIONS S/A4c: Stairs and Railing Periodic SI
    M2a: Mortar and Grout Periodic SI S/A4d: Reinf. Steel Weldability Periodic SI
    M2b: Unit Layup and Joints Periodic SI S/A4e: Reinforcing Steel Continuous SI
    M2c: Wires and Connector Periodic SI S/A5 | FIELD WELDING
    M2d: Anchors and Embeds Periodic SI S/A5a: Weld Category A Continuous SI
    M2e: Cold/Hot Weather Work Periodic SI* S/A5b: Weld Category B Periodic SI
    M2f: Adhered Veneer Bond Test LOR S/A5c: End Welded Studs Periodic SI
    M3 | POST-INSTALLED ANCHORS S/A5d: Deck Welds Periodic SI
    M3a: Inspection Varies* SI* S/A5e: Cold-Formed Steel Periodic SI
    M3b: Test Test LOR S/A5f: Stairs and Railing Periodic SI
    M4 | OTHER MASONRY S/A5g: Reinf. Steel Weldability Periodic SI
    M4a: Not used. N/A N/A S/A5h: Reinforcing Steel Continuous SI
    M4b: Not used. N/A N/A S/A6 | NONDESTRUCTIVE TESTING
    M4c: Not used. N/A N/A S/A6a: Ultrasonic Test LOR
    M4d: Not used. N/A N/A S/A6b: Magnetic Particle Test LOR
    M4e: Not used. N/A N/A S/A6c:Not used. N/A N/A
    M4f: Not used. N/A N/A S/A6d:Not used. N/A N/A
    M4g: Not used. N/A N/A S/A6e:Not used. N/A N/A
    M4h: Not used. N/A N/A S/A7 | STEEL JOISTS AND TRUSSES
    M4i: Not used. N/A N/A S/A7a: Fabrication Continuous SI
    M4j: Not used. N/A N/A S/A8 | SPRAYED FIRE-RESISTANT MATERIALS
    M4k: Not used. S/A8a: Surface and Installation Periodic SI
    M4l: Not used. S/A8b: Density Test LOR
    M4m: Not used. S/A8c: Bond: Adhesion/Cohesion Test LOR
    * See Appendix for additional information. * See Appendix for additional information.
    Project Name: Edison High School Application No.: 02-123614 Increment:
    School District: Stockton Unified File No.: 39-H7
    DGS DSA 130 (3R-e2v2i s(eRde v1i2s/e0d1 7/2/32)4 /25) Page 2 of 4 2 of 10
    DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

    TYPE BY TYPE BY
    S/A9 | ANCHOR BOLTS AND ANCHOR RODS X | OTHER
    S/A9a: Anchor Rods and Bolts S/A9b: Other Threaded Rods Test Test LOR LOR X01: Product Load Test* X02: Non-HSB Installation Torque X03: Not used. X04: Not used. X05: Not used. X06: Not used. X07: Not used. X08: Not used. X09: Not used. X10: Not used. Test Continuous N/A N/A N/A N/A N/A N/A N/A N/A LOR SI* N/A N/A N/A N/A N/A N/A N/A N/A
    S/A10 | STORAGE RACK SYSTEMS
    S/A10a: Material Verification S/A10b: Fabrication S/A10c: Anchorage S/A10d: Completed System Periodic Periodic Periodic Periodic SI SI SI SI*
    S/A11 | OTHER STEEL AND ALUMINUM
    S/A11a: Not used. S/A11b: Not used. S/A11c: Not used. S/A11d: Not used. S/A11e: Not used. S/A11f: Not used. S/A11g: Not used. S/A11h: Not used. S/A11i: Not used. S/A11j: Not used. N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
    EXEMPTIONS
    Those items identified on the DSA-approved construction documents with a note indicating they are not part of the DSA approval or those items checked below are exempt from test and special inspection requirements. The project inspector shall verify all construction complies with the approved construction documents. Soils: Eligible shallow foundation elements**. Soils: Eligible deep foundation elements - type 1**. Soils: Eligible deep foundation elements - type 2**. Concrete/Masonry: Eligible post-installed anchors**. Concrete: Batch plant inspection for items listed in and complying with CBC Section 1705A.3.3.2. Concrete: Epoxy shear dowels in nonstructural slab-on-grade per CBC Section 1910A.5.4, Exception #4. Concrete/Masonry: Reinforcing bar testing for items listed in and complying with CBC Section 1910A.2. Masonry: Freestanding site walls and retaining walls per DSA IR 21-1. Concrete: Eligible precast elements**. Welding: Eligible fences and gates**. Welding: Eligible railing and ramps**. Welding: Eligible interior cold-formed steel framing**. Welding: Eligible equipment curbs**. Welding: Eligible components supporting MEP distribution systems**. Welding: Eligible mounts and recreational equipment**. Welding: Eligible nonstructural components**.
    W1 | PREFABRICATED WOOD TRUSSES
    W1a: Open Web Truss Fabrication W1b: Metal Plate Truss Fabrication Continuous Continuous SI SI
    W2 | MANUFACTURED WOOD ELEMENTS
    W2a: GL Timber Fabrication W2b: CLT Fabrication W2c: Mass Timber Erection W2d: Connections Type A W2e: Connections Type B W2f: Sealants Continuous Continuous Periodic Periodic Continuous Periodic SI SI SI SI SI SI
    W3 | OTHER WOOD
    W3a: Not used. W3b: Not used. W3c: Not used. W3d: Not used. W3e: Not used. W3f: Not used. W3g: Not used. W3h: Not used. N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
    * See Appendix for additional information. ** See Appendix for eligibility requirements.

    DSA 103 - 22
    LIST OF STRUCTURAL TESTS AND SPECIAL INSPECTIONS
    TYPE BY TYPE BY
    S/A9 | ANCHOR BOLTS AND ANCHOR RODS X | OTHER
    S/A9a: Anchor Rods and Bolts Test LOR X01: Product Load Test* Test LOR
    S/A9b: Other Threaded Rods Test LOR X02: Non-HSB Installation Torque Continuous SI*
    S/A10 | STORAGE RACK SYSTEMS X03: Not used. N/A N/A
    S/A10a: Material Verification Periodic SI X04: Not used. N/A N/A
    S/A10b: Fabrication Periodic SI X05: Not used. N/A N/A
    S/A10c: Anchorage Periodic SI X06: Not used. N/A N/A
    S/A10d: Completed System Periodic SI* X07: Not used. N/A N/A
    S/A11 | OTHER STEEL AND ALUMINUM X08: Not used. N/A N/A
    S/A11a: Not used. N/A N/A X09: Not used. N/A N/A
    S/A11b: Not used. N/A N/A X10: Not used. N/A N/A
    S/A11c: Not used. N/A N/A EXEMPTIONS
    S/A11d: Not used. N/A N/A Those items identified on the DSA-approved construction
    documents with a note indicating they are not part of the
    S/A11e: Not used. N/A N/A
    DSA approval or those items checked below are exempt
    S/A11f: Not used. N/A N/A
    from test and special inspection requirements. The project
    S/A11g: Not used. N/A N/A inspector shall verify all construction complies with the
    S/A11h: Not used. N/A N/A approved construction documents.
    S/A11i: Not used. N/A N/A
    S/A11j: Not used. N/A N/A Soils: Eligible shallow foundation elements**.
    W1 | PREFABRICATED WOOD TRUSSES Soils: Eligible deep foundation elements - type 1**.
    W1a: Open Web Truss Fabrication Continuous SI Soils: Eligible deep foundation elements - type 2**.
    Concrete/Masonry: Eligible post-installed anchors**.
    W1b: Metal Plate Truss Fabrication Continuous SI
    Concrete: Batch plant inspection for items listed in and
    W2 | MANUFACTURED WOOD ELEMENTS
    W2a: GL Timber Fabrication Continuous SI complying with CBC Section 1705A.3.3.2.
    Concrete: Epoxy shear dowels in nonstructural
    W2b: CLT Fabrication Continuous SI
    slab-on-grade per CBC Section 1910A.5.4, Exception #4.
    W2c: Mass Timber Erection Periodic SI Concrete/Masonry: Reinforcing bar testing for items
    W2d: Connections Type A Periodic SI listed in and complying with CBC Section 1910A.2.
    W2e: Connections Type B Continuous SI Masonry: Freestanding site walls and retaining walls
    W2f: Sealants Periodic SI per DSA IR 21-1.
    W3 | OTHER WOOD Concrete: Eligible precast elements**.
    W3a: Not used. N/A N/A Welding: Eligible fences and gates**.
    Welding: Eligible railing and ramps**.
    W3b: Not used. N/A N/A
    Welding: Eligible interior cold-formed steel framing**.
    W3c: Not used. N/A N/A Welding: Eligible equipment curbs**.
    W3d: Not used. N/A N/A Welding: Eligible components supporting MEP
    distribution systems**.
    W3e: Not used. N/A N/A
    Welding: Eligible mounts and recreational equipment**.
    W3f: Not used. N/A N/A Welding: Eligible nonstructural components**.
    W3g: Not used. N/A N/A
    W3h: Not used. N/A N/A
    * See Appendix for additional information. ** See Appendix for eligibility requirements.
    Project Name: Edison High School Application No.: 02-123614 Increment:
    School District: Stockton Unified File No.: 39-H7
    DGS DSA 130 (3R-e2v2i s(eRde v1i2s/e0d1 7/2/32)4 /25) Page 3 of 4 2 of 10
    DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

    STAMP
    IDENTIFICATION STAMP DIV. OF THE STATE ARCHITECT DDDDSSSSAAAA APP:02-123614 INC: REVIEWED FOR SS 4 DDDDFIIIIVVVVLIIIISSSSSIIIIOOOONNNN OOOO4FFFF TTTTHHHHEEEE SSSSTTTTAAAAATTTTEEEEC AAAARRRRSCCCCHHHHIIII4TTTTEEEECCCCTTTT DEPARTMENT OF GENERAL SERVICES DATE: 03/17/2026
    4

    DSA 103 - 22
    LIST OF STRUCTURAL TESTS AND SPECIAL INSPECTIONS
    IMPORTANT: This form is only a summary list of structural tests and some of the special inspections required for
    the project. Any items indicated on the approved construction documents with a note stating that the items are not part of
    the DSA approval are not considered in this form. Generally, the structural tests and special inspections noted on this
    form are those that will be performed by the Geotechnical Engineer of Record, Laboratory of Record, or Special
    Inspector. The actual complete test and inspection program must be performed as detailed on the DSA approved
    documents. The exemption appendix at the end of this form identifies work NOT subject to DSA requirements for
    special inspection or structural testing. The project inspector is responsible for providing inspection of all facets of
    construction, including but not limited to, special inspections not listed on this form such as structural wood
    framing, high-load wood diaphragms, cold-formed steel framing, anchorage of nonstructural components, etc., per
    Title 24, Part 2, Chapter 17A.
    Legend to TYPE and BY Columns:
    Continuous - Indicates continuous special inspection is required.
    Periodic - Indicates periodic special inspection is required.
    Test - Indicates a test is required.
    GE - Indicates special inspection shall be performed by a registered geotechnical engineer or his/her authorized
    representative, usually associated with the Laboratory of Record.
    LOR - Indicates test or special inspection shall be performed by a testing laboratory accepted in the DSA Laboratory
    Evaluation and Acceptance (LEA) Program (i.e., the Laboratory of Record for the project). See CAC Section 4-335.
    PI - Indicates special inspection may be performed by a project inspector when specifically approved by DSA.
    SI - Indicates special inspection shall be performed by an appropriately qualified/approved special inspector.
    Required Verified Reports:
    Verified reports are required on
    1. Structural Testing and Inspection: Form DSA 291
    2. Concrete Batch Plant Inspection: Form DSA 291 the following DSA forms:
    3. Post-installed Anchors: Form DSA 291 or DSA 292 DSA 291: Laboratory of
    4. Shop Welding Inspection: Form DSA 291 or DSA 292 Record Verified Report
    5. High-Strength Bolting Inspection: Form DSA 291 or DSA 292
    DSA 292: Special Inspectors
    Employed Directly by the
    District Verified Report
    DSA 293: Geotechnical Verified
    Report
    Note: To facilitate DSA electronic
    mark-ups and identification stamp
    application, DSA recommends
    against using secured electronic
    or digital signatures.
    Name of Design Professional in General Responsible Charge: STAMP
    Timothy L. Dearborn
    IDENTIFICATION STAMP
    DIV. OF THE STATE ARCHITECT
    Name of Structural Engineer of Record (when applicable): DDDDSSSSAAAA
    APP:02-123614 INC:
    REVIEWED FOR
    SS 4 DDDDFIIIIVVVVLIIIISSSSSIIIIOOOONNNN OOOO4FFFF TTTTHHHHEEEE SSSSTTTTAAAAATTTTEEEEC AAAARRRRSCCCCHHHHIIII4TTTTEEEECCCCTTTT
    DEPARTMENT OF GENERAL SERVICES
    Signature of Architect or Structural Engineer: Date: DATE: 03/17/2026
    03/06/2026
    Project Name: Edison High School Application No.: 02-123614 Increment:
    School District: Stockton Unified File No.: 39-H7
    DGS DSA 130 (3R-e2v2i s(eRde v1i2s/e0d1 7/2/32)4 /25) Page 4 of 4 2 of 10
    DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

    S1. GENERAL:
    Test or Special Inspection Code References and Notes
    S1a: Site Preparation | Verify that: * Site has been prepared properly prior to placement of controlled fill and/or excavations for foundations. * Foundation excavations are extended to proper depth and have reached proper material. * Materials below footings are adequate to achieve the design bearing capacity. Refer to specific items identified in the Appendix listing exemptions for limitations. Placement of controlled fill exceeding 12'' depth under foundations is not permitted without a geotechnical report.
    S2. SOIL COMPACTION AND FILL:
    Test or Special Inspection Code References and Notes
    S2a: Fill Materials | Perform classification and testing of fill materials. * Under the supervision of the geotechnical engineer.
    S2b: Fill Placement | Verify use of proper materials, densities and inspect lift thicknesses, placement and compaction during placement of fill. * Under the supervision of a geotechnical engineer or LOR's engineering manager. Refer to specific items identified in the end of this form listing exemptions for limitations.
    S2c: Compaction | Compaction testing. Refer to specific items identified in the Appendix listing exemptions for limitations. Placement of controlled fill exceeding 12'' depth under foundations is not permitted without a geotechnical report.
    S3. DRIVEN DEEP FOUNDATIONS (PILES):
    Test or Special Inspection Code References and Notes
    S3a: Materials and Members | Verify pile materials, sizes and lengths comply with the requirements. * By geotechnical engineer or his or her qualified representative.
    S3b: Pile Capacity | Determine capacities of test piles and conduct additional load tests as required. * Under the supervision of the geotechnical engineer.
    S3c: Driving Operations | Inspect driving operations and maintain complete and accurate records for each pile. * By geotechnical engineer or his or her qualified representative.

    DSA 103 - 22
    Appendix: LIST OF STRUCTURAL TESTS AND SPECIAL INSPECTIONS
    NOTE: Undefined sections and table references found in this appendix are from the CBC, or California Building Code
    S1. GENERAL:
    Test or Special Inspection Code References and Notes
    S1a: Site Preparation | Verify that:
    * Site has been prepared properly prior to placement of
    Refer to specific items identified in the Appendix listing
    controlled fill and/or excavations for foundations.
    exemptions for limitations. Placement of controlled fill
    * Foundation excavations are extended to proper depth
    exceeding 12'' depth under foundations is not permitted
    and have reached proper material.
    without a geotechnical report.
    * Materials below footings are adequate to achieve the
    design bearing capacity.
    S2. SOIL COMPACTION AND FILL:
    Test or Special Inspection Code References and Notes
    S2a: Fill Materials | Perform classification and testing of fill
    * Under the supervision of the geotechnical engineer.
    materials.
    S2b: Fill Placement | Verify use of proper materials, * Under the supervision of a geotechnical engineer or LOR's
    densities and inspect lift thicknesses, placement and engineering manager. Refer to specific items identified in the
    compaction during placement of fill. end of this form listing exemptions for limitations.
    Refer to specific items identified in the Appendix listing
    exemptions for limitations. Placement of controlled fill
    S2c: Compaction | Compaction testing.
    exceeding 12'' depth under foundations is not permitted
    without a geotechnical report.
    S3. DRIVEN DEEP FOUNDATIONS (PILES):
    Test or Special Inspection Code References and Notes
    S3a: Materials and Members | Verify pile materials, * By geotechnical engineer or his or her qualified
    sizes and lengths comply with the requirements. representative.
    S3b: Pile Capacity | Determine capacities of test
    piles and conduct additional load tests as * Under the supervision of the geotechnical engineer.
    required.
    S3c: Driving Operations | Inspect driving operations
    * By geotechnical engineer or his or her qualified
    and maintain complete and accurate records for each
    representative.
    pile.
    Project Name: Edison High School Application No.: 02-123614 Increment:
    School District: Stockton Unified File No.: 39-H7
    DGS DSA 130 (3R-e2v2i s(eRde v1i2s/e0d1 7/2/32)4 /25) 2 of 10
    DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

    S3d: Pile Installation | Verify locations of piles and their plumbness, confirm type and size of hammer, record number of blows per foot of penetration, determine required penetrations to achieve design capacity, record tip and butt elevations and record any pile damage. * By geotechnical engineer or his or her qualified representative.
    S3e: Specialty Piles | For specialty piles, perform additional inspections as determined by the registered design professional in responsible charge. * As defined on drawings or specifications.
    S4. CAST-IN-PLACE DEEP FOUNDATIONS (PIERS):
    Test or Special Inspection Code References and Note
    S4a: Drilling Operations | Inspect drilling operations and maintain complete and accurate records for each pier. Continuous inspection to be provided by project inspector. Refer to specific items identified in the Appendix (end of this form) listing exemptions for limitations.
    S4b: Pier Construction | Verify pier locations, diameters, plumbness, bell diameters (if applicable), lengths and embedment into bedrock (if applicable); record concrete or grout volumes. Continuous inspection to be provided by project inspector. Refer to specific items identified in the Appendix (end of this form) listing exemptions for limitations.
    S4c: Bearing Strata | Confirm adequate end strata bearing capacity. Provide tests and inspections per CONCRETE section below.
    S5. RETAINING WALLS:
    Test or Special Inspection Code References and Notes
    S5a: Backfill Placement | Placement, compaction and inspection of backfill. 1705A.6.1. * By geotechnical engineer or his or her qualified representative. (See section S2 above).
    S5b: Soil Reinf. and Drainage | Placement of soil reinforcement and/or drainage devices. * By geotechnical engineer or his or her qualified representative.
    S5c: Segmental Retaining Walls | Segmental retaining walls; inspect placement of units, dowels, connectors, etc. * By geotechnical engineer or his or her qualified representative. See DSA IR 18-2.

    DSA 103 - 22
    Appendix: LIST OF STRUCTURAL TESTS AND SPECIAL INSPECTIONS
    S3d: Pile Installation | Verify locations of piles and
    their plumbness, confirm type and size of hammer,
    record number of blows per foot of penetration, * By geotechnical engineer or his or her qualified
    determine required penetrations to achieve design representative.
    capacity, record tip and butt elevations and record
    any pile damage.
    S3e: Specialty Piles | For specialty piles, perform
    additional inspections as determined by the registered * As defined on drawings or specifications.
    design professional in responsible charge.
    S4. CAST-IN-PLACE DEEP FOUNDATIONS (PIERS):
    Test or Special Inspection Code References and Note
    S4a: Drilling Operations | Inspect drilling operations Continuous inspection to be provided by project
    and maintain complete and accurate records for each inspector. Refer to specific items identified in the
    pier. Appendix (end of this form) listing exemptions for
    limitations.
    S4b: Pier Construction | Verify pier locations, Continuous inspection to be provided by project
    diameters, plumbness, bell diameters (if applicable), inspector. Refer to specific items identified in the
    lengths and embedment into bedrock (if applicable); Appendix (end of this form) listing exemptions for
    record concrete or grout volumes. limitations.
    S4c: Bearing Strata | Confirm adequate end strata Provide tests and inspections per CONCRETE section
    bearing capacity. below.
    S5. RETAINING WALLS:
    Test or Special Inspection Code References and Notes
    S5a: Backfill Placement | Placement, compaction and 1705A.6.1. * By geotechnical engineer or his or her qualified
    inspection of backfill. representative. (See section S2 above).
    S5b: Soil Reinf. and Drainage | Placement of soil * By geotechnical engineer or his or her qualified
    reinforcement and/or drainage devices. representative.
    S5c: Segmental Retaining Walls | Segmental retaining
    * By geotechnical engineer or his or her qualified
    walls; inspect placement of units, dowels, connectors,
    representative. See DSA IR 18-2.
    etc.
    Project Name: Edison High School Application No.: 02-123614 Increment:
    School District: Stockton Unified File No.: 39-H7
    DGS DSA 130 (3R-e2v2i s(eRde v1i2s/e0d1 7/2/32)4 /25) 2 of 10
    DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

    S6 | OTHER SOILS
    Test or Special Inspection Code References and Notes
    S6a | Soil Improvements Submit a comprehensive report documenting final soil improvements constructed, construction observation and the results of the confirmation testing and analysis to CGS (California Geological Survey) for final acceptance. * By geotechnical engineer or his or her qualified representative.
    S6b | Inspection of Soil Improvements * By geotechnical engineer or his or her qualified representative.
    S6c. | Not used. N/A
    S6d. | Not used. N/A
    S6e. | Not used. N/A
    S6f. | Not used. N/A
    S6g. | Not used. N/A
    S6h. | Not used. N/A
    S6i. | Not used. N/A
    S6j. | Not used. N/A
    S6k. | Not used. N/A
    S6l. | Not used. N/A
    S6m. | Not used. N/A
    S6n. | Not used. N/A

    DSA 103 - 22
    Appendix: LIST OF STRUCTURAL TESTS AND SPECIAL INSPECTIONS
    S6 | OTHER SOILS
    Test or Special Inspection Code References and Notes
    Submit a comprehensive report documenting final soil
    improvements constructed, construction observation and the
    S6a | Soil Improvements results of the confirmation testing and analysis to CGS (California
    Geological Survey) for final acceptance.
    * By geotechnical engineer or his or her qualified representative.
    S6b | Inspection of Soil Improvements * By geotechnical engineer or his or her qualified representative.
    S6c. | Not used. N/A
    S6d. | Not used. N/A
    S6e. | Not used. N/A
    S6f. | Not used. N/A
    S6g. | Not used. N/A
    S6h. | Not used. N/A
    S6i. | Not used. N/A
    S6j. | Not used. N/A
    S6k. | Not used. N/A
    S6l. | Not used. N/A
    S6m. | Not used. N/A
    S6n. | Not used. N/A
    Project Name: Edison High School Application No.: 02-123614 Increment:
    School District: Stockton Unified File No.: 39-H7
    DGS DSA 130 (3R-e2v2i s(eRde v1i2s/e0d1 7/2/32)4 /25) 2 of 10
    DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

    C1. CAST-IN-PLACE CONCRETE
    Test or Special Inspection Code References and Notes
    C1a: Mix Design | Verify use of required design mix. Table 1705A.3 Item 5, 1903A.5, 1903A.7, 1904A.1, 1904A.2, 1910A.1 ; ACI 318 Ch. 19, 26.4, 26.13.3.2.
    C1b: Reinforcing Steel | Identify, sample, and test reinforcing steel. Table 1705A.3 Item 1, 1705A.3.9, 1908A.1, 1910A.2; ACI 318 Ch. 20 and Sections 25.2, 25.3, 25.5.1, 26.6.1; DSA IR 17-10 and BU 24-02. (See Appendix (end of this form) for exemptions.)
    C1c: Concrete Material | During concrete placement, fabricate specimens for strength tests, perform slump and air content tests, and determine the temperature of the concrete. Table 1705A.3 Item 6, 1705A.3.9, 1905A.1.17; ASTM C31, ASTM C172; ACI 318 Sections 26.4, 26.5 & 26.12.
    C1d: Strength Test | Test concrete (f'c). 1905A.1.17; ACI 318 Section 26.12.
    C1e: Batch Plant Inspection | Batch plant inspection: Continuous Default of "Continuous" per 1705A.3.3. If approved by DSA, batch plant inspection may be reduced to "Periodic" subject to requirements in Section 1705A.3.3.1, or not required per 1705A.3.3.2. See IR 17-13. (See Appendix (end of this form) for exemptions.)
    C2. PRESTRESSED / POST-TENSIONED CONCRETE (IN ADDITION TO SECTION C1):
    Test or Special Inspection Code References and Notes
    C2a: Tendons and Anchorage | Sample and test prestressing tendons and anchorages. 1705A.3.4 Table 1705A.3 Item 1, 1910A.3; ACI 318 Ch. 20 and Sections 25.2, 26.6.1.
    C2b: Tendon Placement | Inspect placement of prestressing tendons. 1705A.3.4, Table 1705A.3 Items 1 & 9; ACI 318 Ch. 20 and Sections 25.2, 26.6.1-26.6.3.
    C2c: Concrete Strength | Verify in-situ concrete strength prior to stressing of post-tensioning tendons. Table 1705A.3 Item 13; ACI 318 Sections 26.10.2, 26.11.2, 26.13.3.3. Special inspector to verify specified concrete strength test prior to stressing.
    C2d: Stressing Operations | Inspect application of post-tensioning or prestressing forces and grouting of bonded prestressing tendons. 1705A.3.4, Table 1705A.3 Item 9; ACI 318 Sections 26.10.2, 26.13.1, 26.13.3.2.
    C3. PRECAST CONCRETE (IN ADDITION TO SECTION C1):
    Test or Special Inspection Code References and Notes
    C3a: General Fabrication | 1. Inspect fabrication of precast concrete members. * 2. Inspect reinforcement of the following precast concrete elements or system(s): a. special moment frames. b. boundary elements of special structural walls. c. coupling beams. 1705A.3 Item 1, 7. See Appendix for exemptions. *May be periodic where fabrication occurs in a PCI-certified plant. For underground structures, NPCA plant certification is acceptable. PCI MNL-116-21; PCI MNL-117-13; NPCA Quality Control Manual (QCM) 17th Edition. See IR A-15.

    DSA 103 - 22
    Appendix: LIST OF STRUCTURAL TESTS AND SPECIAL INSPECTIONS
    C1. CAST-IN-PLACE CONCRETE
    Test or Special Inspection Code References and Notes
    Table 1705A.3 Item 5, 1903A.5, 1903A.7, 1904A.1, 1904A.2,
    C1a: Mix Design | Verify use of required design mix.
    1910A.1 ; ACI 318 Ch. 19, 26.4, 26.13.3.2.
    Table 1705A.3 Item 1, 1705A.3.9, 1908A.1, 1910A.2; ACI 318
    Ch. 20 and Sections 25.2, 25.3, 25.5.1, 26.6.1; DSA IR 17-10
    C1b: Reinforcing Steel | Identify, sample, and test
    and BU 24-02. (See Appendix (end of this form) for
    reinforcing steel.
    exemptions.)
    C1c: Concrete Material | During concrete
    Table 1705A.3 Item 6, 1705A.3.9, 1905A.1.17; ASTM C31,
    placement, fabricate specimens for strength
    ASTM C172; ACI 318 Sections 26.4, 26.5 & 26.12.
    tests, perform slump and air content tests, and
    determine the temperature of the concrete.
    1905A.1.17; ACI 318 Section 26.12.
    C1d: Strength Test | Test concrete (f'c).
    Default of "Continuous" per 1705A.3.3. If approved by DSA,
    batch plant inspection may be reduced to "Periodic"
    C1e: Batch Plant Inspection | Batch plant inspection: subject to requirements in Section 1705A.3.3.1, or not
    Continuous required per 1705A.3.3.2. See IR 17-13. (See Appendix (end
    of this form) for exemptions.)
    C2. PRESTRESSED / POST-TENSIONED CONCRETE (IN
    ADDITION TO SECTION C1):
    Test or Special Inspection Code References and Notes
    1705A.3.4 Table 1705A.3 Item 1, 1910A.3; ACI 318 Ch. 20
    C2a: Tendons and Anchorage | Sample and test
    and Sections 25.2, 26.6.1.
    prestressing tendons and anchorages.
    C2b: Tendon Placement | Inspect placement of 1705A.3.4, Table 1705A.3 Items 1 & 9; ACI 318 Ch. 20 and
    prestressing tendons. Sections 25.2, 26.6.1-26.6.3.
    Table 1705A.3 Item 13; ACI 318 Sections 26.10.2, 26.11.2,
    C2c: Concrete Strength | Verify in-situ concrete 26.13.3.3. Special inspector to verify specified concrete
    strength prior to stressing of post-tensioning tendons. strength test prior to stressing.
    C2d: Stressing Operations | Inspect application of 1705A.3.4, Table 1705A.3 Item 9; ACI 318 Sections 26.10.2,
    post-tensioning or prestressing forces and grouting of 26.13.1, 26.13.3.2.
    bonded prestressing tendons.
    C3. PRECAST CONCRETE (IN ADDITION TO SECTION
    C1):
    Test or Special Inspection Code References and Notes
    C3a: General Fabrication | 1. Inspect fabrication of
    1705A.3 Item 1, 7. See Appendix for exemptions. *May be
    precast concrete members. *
    periodic where fabrication occurs in a PCI-certified plant.
    2. Inspect reinforcement of the following precast concrete
    For underground structures, NPCA plant certification is
    elements or system(s):
    acceptable. PCI MNL-116-21; PCI MNL-117-13; NPCA
    a. special moment frames.
    Quality Control Manual (QCM) 17th Edition. See IR A-15.
    b. boundary elements of special structural walls.
    c. coupling beams.
    Project Name: Edison High School Application No.: 02-123614 Increment:
    School District: Stockton Unified File No.: 39-H7
    DGS DSA 130 (3R-e2v2i s(eRde v1i2s/e0d1 7/2/32)4 /25) 2 of 10
    DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

    C3b: General Erection | Inspect erection of precast concrete members. Table 1705A.3 Item 10.
    C3c: Diaphragm Connections | For precast concrete diaphragm connections or reinforcement at joints classified as moderate or high deformability elements (MDE or HDE) in structures assigned to Seismic Design Category D, E or F, inspect such connections and reinforcement in the field for: 1. Installation of the embedded parts. 2. Completion of the continuity of reinforcement across joints. 3. Completion of connections in the field. Table 1705A.3 Item 11.
    C3d: Diaphragm Tolerances | Inspect installation tolerances of precast concrete diaphragm connections for compliance with ACI 550.5. Table 1705A.3 Item 12
    C4. SHOTCRETE (IN ADDITION TO SECTION C1):
    Test or Special Inspection Code References and Notes
    C4a: Placement | Inspect shotcrete placement for proper application techniques. 1705A.3.9, Table 1705A.3 Item 7, 1908A.1, 1908A.2, 1908A.3. See ACI 506.2 Section 3.4, and ACI 506R.
    C4b: Shotcrete Material | Sample and test shotcrete (f'c). 1908A.2 and 1705A.3.9.
    C5. POST-INSTALLED ANCHORS:
    Test or Special Inspection Code References and Notes
    C5a: Inspection | Inspect installation of post-installed anchors 1617A.1.19, Table 1705A.3 Item 4a (Continuous) & 4b (Periodic), 1705A.3.8 (See Appendix (end of this form) for exemptions). ACI 318 Sections 26.7.2, 26.13.1, 26.13.3.2, 26.13.3.3. * May be performed by the project inspector when specifically approved by DSA.
    C5b: Test | Test post-installed anchors. 1910A.5. (See Appendix (end of this form) for exemptions.)

    DSA 103 - 22
    Appendix: LIST OF STRUCTURAL TESTS AND SPECIAL INSPECTIONS
    C3b: General Erection | Inspect erection of precast
    Table 1705A.3 Item 10.
    concrete members.
    C3c: Diaphragm Connections | For precast
    concrete diaphragm connections or reinforcement
    at joints classified as moderate or high deformability
    elements (MDE or HDE) in structures assigned to
    Seismic Design Category D, E or F, inspect such
    connections and reinforcement in the field for: Table 1705A.3 Item 11.
    1. Installation of the embedded parts.
    2. Completion of the continuity of
    reinforcement across joints.
    3. Completion of connections in the field.
    C3d: Diaphragm Tolerances | Inspect installation
    tolerances of precast concrete diaphragm connections Table 1705A.3 Item 12
    for compliance with ACI 550.5.
    C4. SHOTCRETE (IN ADDITION TO SECTION C1):
    Test or Special Inspection Code References and Notes
    1705A.3.9, Table 1705A.3 Item 7, 1908A.1, 1908A.2, 1908A.3.
    C4a: Placement | Inspect shotcrete
    See ACI 506.2 Section 3.4, and ACI 506R.
    placement for proper application techniques.
    C4b: Shotcrete Material | Sample and test shotcrete 1908A.2 and 1705A.3.9.
    (f'c).
    C5. POST-INSTALLED ANCHORS:
    Test or Special Inspection Code References and Notes
    1617A.1.19, Table 1705A.3 Item 4a (Continuous) & 4b
    (Periodic), 1705A.3.8 (See Appendix (end of this form) for
    C5a: Inspection | Inspect installation of post-installed
    exemptions). ACI 318 Sections 26.7.2, 26.13.1, 26.13.3.2,
    anchors
    26.13.3.3. * May be performed by the project inspector when
    specifically approved by DSA.
    C5b: Test | Test post-installed anchors. 1910A.5. (See Appendix (end of this form) for exemptions.)
    Project Name: Edison High School Application No.: 02-123614 Increment:
    School District: Stockton Unified File No.: 39-H7
    DGS DSA 130 (3R-e2v2i s(eRde v1i2s/e0d1 7/2/32)4 /25) 2 of 10
    DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

    C6. OTHER CONCRETE:
    Test or Special Inspection Code References and Notes
    C6a. | Not used. N/A
    C6b. | Not used. N/A
    C6c. | Not used. N/A
    C6d. | Not used. N/A
    C6e. | Not used. N/A
    C6f. | Not used. N/A
    C6g. | Not used. N/A
    C6h. | Not used. N/A
    C6i. | Not used. N/A
    C6j. | Not used. N/A
    C6k. | Not used. Not used.
    C6l. | Not used. Not used.

    DSA 103 - 22
    Appendix: LIST OF STRUCTURAL TESTS AND SPECIAL INSPECTIONS
    C6. OTHER CONCRETE:
    Test or Special Inspection
    Code References and Notes
    C6a. | Not used. N/A
    C6b. | Not used. N/A
    C6c. | Not used. N/A
    C6d. | Not used. N/A
    C6e. | Not used. N/A
    C6f. | Not used. N/A
    C6g. | Not used. N/A
    C6h. | Not used. N/A
    C6i. | Not used. N/A
    C6j. | Not used. N/A
    C6k. | Not used. Not used.
    C6l. | Not used. Not used.
    Project Name: Edison High School Application No.: 02-123614 Increment:
    School District: Stockton Unified File No.: 39-H7
    DGS DSA 130 (3R-e2v2i s(eRde v1i2s/e0d1 7/2/32)4 /25) 2 of 10
    DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

    This page summarizes the opportunity, including an overview and a preview of the attached documents.
    * Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

    Sign-up for a Free Trial, Government Bid Alerts

    With Free Trial, you can:

    You will have a full access to bids, website, and receive daily bid report via email and web.

    Try One Week FREE Now

    See Also

    Follow Y--GOGA 244458 & FOPO 186401 Construct Bike Path at West Bluff Trailhead

    INTERIOR, DEPARTMENT OF THE

    Follow USACE SPK DBB Construction - Natomas PP5, Sacramento, CA Active Contract Opportunity

    Federal Agency

    Project: TEC Modernization Addition Ref. #: 2026-1683 Type: ITB Status: Open Open Date:

    Alameda-Contra Costa Transit District

    Bid Due: 7/28/2026

    Follow 127EAW26Q0050 - Ash Creek Helispot Construction Active Contract Opportunity Notice ID 127EAW26Q0050

    AGRICULTURE, DEPARTMENT OF

    Bid Due: 8/13/2026