ECS Bay Lifts
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Georgia |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | No Set aside used |
| Posted Date: | Oct 9, 2025 |
| Due Date: | Oct 15, 2025 |
| Solicitation No: | FA857126R0001 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
- Original Published Date: Oct 09, 2025 12:17 pm EDT
- Original Date Offers Due: Oct 15, 2025 12:00 pm EDT
- Inactive Policy: Manual
- Original Inactive Date: Oct 16, 2025
-
Initiative:
- None
- Original Set Aside: No Set aside used
- Product Service Code: 3990 - MISCELLANEOUS MATERIALS HANDLING EQUIPMENT
-
NAICS Code:
- 333923 - Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
-
Place of Performance:
GA 30188USA
This is a Brand Name, Sole Source commercial acquisition. The Contractor shall provide all the tools, parts, materials, equipment, and transportation for two (2) each of the Environmental Control System (ECS) Bay Lifts (Low Profile Double Pantographs) to the 402d Aircraft Maintenance Group (AMXG) at Robins Air Force Base (AFB), Georgia.
The Contractor shall provide approval drawings to the Government for review prior to beginning fabrication of the ECS Bay LIfts.
The Contractor shall electronically send the drawings in Adobe Portable Document Format (PDF) to the Government Point of
Contacts (POCs) at Robins AFB within five (5) weeks after contract award. The
Government shall review the drawings and approve them within two (2) weeks of receiving the drawings. The Contractor shall
manufacture the Bay Lifts within fourteen (14) weeks.
Shipping/Delivery: The Contractor shall ship the products according to their commercial package recommendations no later
than fourteen (14) weeks after contract award. Delivery will be FOB
Destination.
- CP 478 926 7509 235 PERRY ST BLDG 255
- ROBINS AFB , GA 31098-1672
- USA
- Nikia Streeter
- nikia.streeter@us.af.mil
- Lasonia Anderson
- lasonia.anderson@us.af.mil
- Oct 09, 2025 12:17 pm EDTCombined Synopsis/Solicitation (Original)
Related Document
| Oct 21, 2025 | [Combined Synopsis/Solicitation (Updated)] ECS Bay Lifts |
See Also
Project: State Mandated Annual Elevator Inspections Ref. #: 27-16-1620 Type: RFQ Status: Open
Forsyth County
Due by 9/17/2026