DIVISION 00 - Division 00 - Procurement and Contracting Requirements
SECTION 00 01 01 - Project Title Page
PORT OF TACOMA
TACOMA, WASHINGTON
EBC SILVERBACK TEMPORARY RELOCATION
PROJECT NO. 101686.01
CONTRACT NO. POT-PA-0000000292
Thais Howard, PE
Sr. Director, Engineering
Elly Bulega, PE
Project Manager
END OF SECTION
Project No. 101686.01 00 01 01 - 1
Contract No. POT-PA-0000000292
| SEAL & SIGNATURE | SECTION(S) |
|---|---|
| 05 50 00 - Metal Fabrications 07 92 00 - Joint Sealants 08 10 00 - Steel Doors and Frames 08 36 00 - Overhead Sectional Doors 08 71 00 - Door Hardware 09 91 00 - Painting 10 52 00 - Specialties 10 81 13 - Grid Wire Bird Deterrent System 13 34 19 - Metal Building Systems 32 31 13 - Chain Link Fencing and Gates | |
| 23 00 00 - General Mechanical Requirements 23 05 29 - Hangers and Supports 23 05 53 - Identification for Piping and Equipment 23 05 93 - Testing, Adjusting, and Balancing for HVAC 23 09 00 - Instrumentation and Controls 23 09 93 - Sequence of Operation 23 31 00 - Ducts and Casings 23 33 00 - Air Duct Accessories 23 34 00 - HVAC Fans 23 37 00 - Air Outlets and Inlets 23 54 00 - Heaters | |
| 26 00 00 - Electrical Work General 26 01 00 - Operation and Maintenance Manuals 26 05 00 - Common Work Results for Electrical 26 05 19 - Low Voltage Electrical Power Conductors and Cables 26 05 26 - Grounding and Bonding for Electrical Systems 26 05 29 - Hangers and Supports for Electrical Systems 26 05 33 - Raceway and Boxes for Electrical Systems 26 05 43 - Underground Ducts and Raceways for Electrical Systems 26 05 48 - Vibration and Seismic Controls 26 05 53 - Electrical Identification 26 08 00 - Commissioning of Electrical Systems 26 08 01 - Electrical Testing 26 22 00 - Dry-Type Transformers 26 24 16 - Panelboards 26 27 16 - Cabinets and Enclosures 26 28 13 - Fuses 26 28 16 - Enclosed Switches and Circuit Breakers 26 43 13 - Transient Voltage Surge Suppression (TVSS) |
DIVISION 00 - Division 00 - Procurement and Contracting Requirements
SECTION 00 01 07 - Seals Page
The undersigned Engineer of Record hereby certifies that the Technical Specifications for the following
portions of this project were written by me, or under my direct supervision, and that I am duly registered
under the laws of the State of Washington, and hereby affix my Professional Seal and signature.
Those Sections prepared under my direct supervision and being certified by my seal and signature below
are as follows:
SEAL & SIGNATURE SECTION(S)
05 50 00 - Metal Fabrications
07 92 00 - Joint Sealants
08 10 00 - Steel Doors and Frames
08 36 00 - Overhead Sectional Doors
08 71 00 - Door Hardware
09 91 00 - Painting
10 52 00 - Specialties
10 81 13 - Grid Wire Bird Deterrent System
13 34 19 - Metal Building Systems
32 31 13 - Chain Link Fencing and Gates
23 00 00 - General Mechanical Requirements
23 05 29 - Hangers and Supports
23 05 53 - Identification for Piping and Equipment
23 05 93 - Testing, Adjusting, and Balancing for HVAC
23 09 00 - Instrumentation and Controls
23 09 93 - Sequence of Operation
23 31 00 - Ducts and Casings
23 33 00 - Air Duct Accessories
23 34 00 - HVAC Fans
23 37 00 - Air Outlets and Inlets
23 54 00 - Heaters
26 00 00 - Electrical Work General
26 01 00 - Operation and Maintenance Manuals
26 05 00 - Common Work Results for Electrical
26 05 19 - Low Voltage Electrical Power Conductors and Cables
26 05 26 - Grounding and Bonding for Electrical Systems
26 05 29 - Hangers and Supports for Electrical Systems
26 05 33 - Raceway and Boxes for Electrical Systems
26 05 43 - Underground Ducts and Raceways for Electrical Systems
26 05 48 - Vibration and Seismic Controls
26 05 53 - Electrical Identification
26 08 00 - Commissioning of Electrical Systems
26 08 01 - Electrical Testing
26 22 00 - Dry-Type Transformers
26 24 16 - Panelboards
26 27 16 - Cabinets and Enclosures
26 28 13 - Fuses
26 28 16 - Enclosed Switches and Circuit Breakers
26 43 13 - Transient Voltage Surge Suppression (TVSS)
Project No. 101686.01 00 01 07 - 1
Contract No. POT-PA-0000000292
DIVISION 00 - Division 00 - Procurement and Contracting Requirements
SECTION 00 01 10 - Table of Contents
PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 01 - Project Title Page
00 01 07 - Seals Page
00 01 10 - Table of Contents
00 01 15 - List of Drawing Sheets
00 11 13 - Advertisement for Bids
00 21 00 - Instructions to Bidders
00 26 00 - Substitution Procedures
00 31 00 - Available Project Information
00 31 26 - Existing Hazardous Material Information
00 41 00 - Bid Form
00 43 13 - Bid Security Form
00 45 13 - Responsibility Detail Form
00 52 00 - Agreement Form
00 61 13.13 - Performance Bond
00 61 13.16 - Payment Bond
00 61 23 - Retainage Bond
00 72 00 - General Conditions
00 73 16 - Insurance Requirements
00 73 46 - Washington State Prevailing Wage Rates
00 73 63 - Security Requirements
SPECIFICATIONS
DIVISION 01 -- GENERAL REQUIREMENTS
01 10 00 - Summary
01 14 00 - Work Restrictions
01 20 00 - Price and Payment Procedures
01 26 00 - Change Management Procedures
01 29 73 - Schedule of Values
01 30 00 - Administrative Requirements
01 31 23 - Web-based Construction Management
01 32 16 - Construction Progress Schedule
01 33 00 - Submittal Procedures
Project No. 101686.01 00 01 10 - 1
Contract No. POT-PA-0000000292
DIVISION 00 - Division 00 - Procurement and Contracting Requirements
SECTION 00 01 10 - Table of Contents
01 35 29 - Health, Safety, and Emergency Response Procedures
01 35 43.13 - Hazardous Materials Handling Procedure
01 35 43.19 - Export Soil Management
01 35 47 - Air and Noise Control Procedures
01 41 00 - Regulatory Requirements
01 42 19 - Reference Standards
01 45 00 - Quality Control
01 50 00 - Temporary Facilities and Controls
01 55 00 - Vehicular Access and Parking
01 57 13 - TESC and Project SWPPP
01 60 00 - Product Requirements
01 70 00 - Execution and Closeout Requirements
01 71 00 - Examination and Preparation
01 74 13 - Construction Cleaning
DIVISION 02 -- EXISTING CONDITIONS
DIVISION 03 -- CONCRETE
DIVISION 05 -- METALS
05 50 00 - Metal Fabrications
DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
07 92 00 - Joint Sealants
DIVISION 08 -- OPENINGS
08 10 00 - Steel Doors and Frames
08 36 00 - Overhead Sectional Doors
08 71 00 - Door Hardware
DIVISION 09 -- FINISHES
09 91 00 - Painting
DIVISION 10 -- SPECIALTIES
10 52 00 - Specialties
10 81 13 - Grid Wire Bird Deterrent System
DIVISION 13 -- SPECIAL CONSTRUCTION
13 34 19 - Metal Building Systems
DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 00 00 - General Mech Requirements
23 05 29 - Hangers and Supports for HVAC Piping and Equipment
Project No. 101686.01 00 01 10 - 2
Contract No. POT-PA-0000000292
DIVISION 00 - Division 00 - Procurement and Contracting Requirements
SECTION 00 01 10 - Table of Contents
23 05 53 - Identification for HVAC Piping and Equipment
23 05 93 - Testing, Adjusting, and Balancing for HVAC
23 09 00 - Instrumentation and Control Devices for HVAC
23 09 93 - Sequence of Operations for HVAC Controls
23 31 00 - HVAC Ducts and Casings
23 33 00 - Air Duct Accessories
23 34 00 - HVAC Fans
23 37 00 - Air Outlets and Inlets
23 54 00 - HVAC Heaters
DIVISION 26 -- ELECTRICAL
26 00 00 - Electrical Work General
26 01 00 - Operation and Maintenance Manuals
26 05 00 - Common Work Results for Electrical
26 05 19 - Low-Voltage Electrical Power Conductors and Cables
26 05 26 - Grounding and Bonding for Electrical Systems
26 05 29 - Hangers and Supports for Electrical Systems
26 05 33 - Raceway and Boxes for Electrical Systems
26 05 43 - Underground Ducts and Raceways for Electrical Systems
26 05 48 - Vibration and Seismic Controls for Electrical Systems
26 05 53 - Electrical Identification
26 08 00 - Commissioning of Electrical Systems
26 08 01 - Electrical Testing
26 22 00 - Dry -Type Transformers
26 24 16 - Panelboards
26 27 16 - Cabinets and Enclosures
26 28 13 - Fuses
26 28 16 - Enclosed Switches and Circuit Breakers
26 43 13 - Transient Voltage Surge Suppression
DIVISION 32 -- EXTERIOR IMPROVEMENTS
32 31 13 - Chain Link Fences and Gates
APPENDICES
Appendix A - Prefabricated Metal Building Permit No. BLDCN25-0026
Appendix B - Silverback Modular Building Permit No. To be Applied for with Contractor
Appendix C - Motive Modular Building Permit No. To be Applied for with Contractor
Project No. 101686.01 00 01 10 - 3
Contract No. POT-PA-0000000292
DIVISION 00 - Division 00 - Procurement and Contracting Requirements
SECTION 00 01 10 - Table of Contents
Appendix D - Restroom Modular Building Permit No. To be Applied for with Contractor
Appendix E - Site Development Permit No. SDEV25-0024, FRC25-0251
Appendix F - Fence Building Permit No. BLDCA25-0368
Appendix G - SWPPP Short Form
END OF SECTION
Project No. 101686.01 00 01 10 - 4
Contract No. POT-PA-0000000292
| Sheet Designation | Sheet No. | Drawing Title |
|---|---|---|
| 1 | G1.0 | COVER SHEET |
| 2 | G1.1 | GENERAL NOTES AND ABBREVIATIONS |
| 3 | G1.2 | CODE ANALYSIS |
| 4 | G1.3 | SITE PLAN |
| 5 | A1.0 | ARCHITECTURAL SITE PLAN |
| 6 | A0.1 | ENLARGED UTILITY CONNECTIONS |
| 7 | A0.3 | SITE DETAILS |
| 8 | A1.1 | METAL BUILDING FLOOR PLAN |
| 9 | A1.2 | METAL BUILDING ROOF PLAN |
| 10 | A1.3 | MODULAR OFFICE #1 - BASIS OF DESIGN |
| 11 | A1.4 | MODULAR OFFICE #2 - BASIS OF DESIGN |
| 12 | A1.5 | RESTROOM TRAILER - BASIS OF DESIGN |
| 13 | A1.6 | MODULAR BUILDING SCOPE MATRIX |
| 14 | A2.1 | METAL BUILDING EXTERIOR ELEVATIONS |
| 15 | A2.2 | METAL BUILDING SECTIONS |
| 16 | A3.1 | ROOF AND WALL ASSEMBLIES |
| 17 | A5.1 | DETAILS |
| 18 | A6.1 | SCHEDULES AND DETAILS |
| 19 | S1.0 | GENERAL NOTES AND SPECIAL INSPECTIONS |
| 20 | S1.1 | LOADING DIAGRAMS AND DETAILS |
| 21 | S1.2 | REFERENCE RECORD DRAWING |
| 22 | M0.1 | MECHANICAL LEGEND AND NOTES |
| 23 | M0.2 | MECHANICAL SCHEDULES |
| 24 | M1.1 | MECHANICAL FLOOR PLAN |
| 25 | E0.0 | ELECTRICAL SYMBOLS |
| 26 | E0.1 | ABBREVIATIONS |
| 27 | E1.0 | SITE PLAN - POWER |
| 28 | E2.0 | FIRST FLOOR PLAN - POWER |
| 29 | E3.0 | FIRST FLOOR PLAN - LIGHTING |
| 30 | E3.1 | LIGHTING DETAILS |
| 31 | E3.2 | SILVERBACK BUILDING INTERIOR PHOTOMETRIC STUDY |
| 32 | E3.3 | SILVERBACK BUILDING EXTERIOR PHOTOMETRIC STUDY |
| 33 | E5.0 | FIRST FLOOR PLAN - FIRE ALARM |
| 34 | E6.0 | DETAILS |
| 35 | E6.1 | GROUNDING DETAILS |
| 36 | E10.0 | ONE-LINE DIAGRAM |
| 37 | E10.1 | PANEL SCHEDULES |
DIVISION 00 - Division 00 - Procurement and Contracting Requirements
SECTION 00 01 15 - List of Drawing Sheets
PART 1 - GENERAL
1.01 SUMMARY
A. Contract Drawings: The following drawings are a part of the Contract Documents:
Sheet
Sheet No. Drawing Title
Designation
1 G1.0 COVER SHEET
2 G1.1 GENERAL NOTES AND ABBREVIATIONS
3 G1.2 CODE ANALYSIS
4 G1.3 SITE PLAN
5 A1.0 ARCHITECTURAL SITE PLAN
6 A0.1 ENLARGED UTILITY CONNECTIONS
7 A0.3 SITE DETAILS
8 A1.1 METAL BUILDING FLOOR PLAN
9 A1.2 METAL BUILDING ROOF PLAN
10 A1.3 MODULAR OFFICE #1 - BASIS OF DESIGN
11 A1.4 MODULAR OFFICE #2 - BASIS OF DESIGN
12 A1.5 RESTROOM TRAILER - BASIS OF DESIGN
13 A1.6 MODULAR BUILDING SCOPE MATRIX
14 A2.1 METAL BUILDING EXTERIOR ELEVATIONS
15 A2.2 METAL BUILDING SECTIONS
16 A3.1 ROOF AND WALL ASSEMBLIES
17 A5.1 DETAILS
18 A6.1 SCHEDULES AND DETAILS
19 S1.0 GENERAL NOTES AND SPECIAL INSPECTIONS
20 S1.1 LOADING DIAGRAMS AND DETAILS
21 S1.2 REFERENCE RECORD DRAWING
22 M0.1 MECHANICAL LEGEND AND NOTES
23 M0.2 MECHANICAL SCHEDULES
24 M1.1 MECHANICAL FLOOR PLAN
25 E0.0 ELECTRICAL SYMBOLS
26 E0.1 ABBREVIATIONS
27 E1.0 SITE PLAN - POWER
28 E2.0 FIRST FLOOR PLAN - POWER
29 E3.0 FIRST FLOOR PLAN - LIGHTING
30 E3.1 LIGHTING DETAILS
31 E3.2 SILVERBACK BUILDING INTERIOR PHOTOMETRIC STUDY
32 E3.3 SILVERBACK BUILDING EXTERIOR PHOTOMETRIC STUDY
33 E5.0 FIRST FLOOR PLAN - FIRE ALARM
34 E6.0 DETAILS
35 E6.1 GROUNDING DETAILS
36 E10.0 ONE-LINE DIAGRAM
37 E10.1 PANEL SCHEDULES
Project No. 101686.01 00 01 15 - 1
Contract No. POT-PA-0000000292
| 38 | E10.2 | PANEL SCHEDULES |
|---|---|---|
| 39 | E10.3 | PANEL SCHEDULES |
| 40 | E10.4 | TEMPORARY SERVICE MOUNTING DETAIL |
| 41 | E10.5 | WEATHERHEAD MAST AND MOUNTING DETAIL |
DIVISION 00 - Division 00 - Procurement and Contracting Requirements
SECTION 00 01 15 - List of Drawing Sheets
38 E10.2 PANEL SCHEDULES
39 E10.3 PANEL SCHEDULES
40 E10.4 TEMPORARY SERVICE MOUNTING DETAIL
41 E10.5 WEATHERHEAD MAST AND MOUNTING DETAIL
PART 2 - PRODUCTS - NOT USED
PART 3 - EXECUTION - NOT USED
END OF SECTION
Project No. 101686.01 00 01 15 - 2
Contract No. POT-PA-0000000292
DIVISION00-Division00-ProcurementandContractingRequirements
SECTION001113-AdvertisementforBids
EBC SILVERBACK TEMPORARY RELOCATION
PROJECT NO. 101686.01 | CONTRACT NO. POT-PA-0000000292
Scope of Work: The Work required for this Project includes:
Design, procurement and installation of a new prefabricated metal
building on an existing slab, procurement and installation of modular
buildings, connecting modular buildings to utilities, and all other
miscellaneous work as described in the project documents.
Bid Estimate: Estimated cost range is $4,000,000 to $4,400,000,
plus Washington State Sales Tax (WSST).
In accordance with RCW 39.04.320, fifteen (15) percent apprenticeship
participation is required for certain projects estimated to cost one million
($1,000,000) dollars or more. Bidders may contact the Department of Labor
and Industries, Specialty Compliance Services Division, Apprenticeship
Section, P.O. Box 44530, Olympia, WA 98504-4530, by phone (360) 902-
5320, or e-mail at Apprentice@lni.wa.gov, to obtain information on available
apprenticeship programs.
Sealed Bid Date/ Bids will be received at the Front Reception Desk, Port
Time/Location: Administration Office, One Sitcum Plaza, Tacoma, Washington
98421 until 2:00 P.M. on April 22nd, at which time they will be publicly
opened and read aloud and the apparent low bid will be determined.
Pre-Bid A pre-bid conference and site visit have been set for April 8th
Conference and 2026 at 11:00 AM. The site visit will convene at the project site.
Site Tour: The following Personal Protective Equipment
is required for the site visit: sturdy shoes, reflective vest, gloves, safety
glasses, hearing protection, and hardhat.
Attendees will be required to sign a Release and Acceptance of Responsibility
and Acknowledgement of Risks Form prior to entering the site and shall
provide their own Personal Protection Equipment (PPE) as required above.
Bid Security: Each Bid must be accompanied by a Bid security in an amount
equal to five (5) percent of the Base Bid in a form allowed by the Instructions
to Bidders.
ProjectNo.101686.01 001113-1
ContractNo.POT-PA-0000000292
DIVISION00-Division00-ProcurementandContractingRequirements
SECTION001113-AdvertisementforBids
Contact Any questions to the Port may be submitted to the Procurement
Information: Department through the Procurement and Question Submission
Portal (Portal link is accessible via this specific procurements website. See left
side of page.). A direct link is also available here: Procurement and Question
Portal Link. No oral responses will be binding by the Port.
Instructions for utilizing the portal can be found here: Procurement and
Question Submission Portal Instructions.
Questions will not be accepted after seven (7) days prior to the Bid Date.
Bidding Plans, Specifications, Addenda, and Plan Holders List for this
Documents: Project are available on-line through The Port of Tacoma's Website
portoftacoma.com. Click on "Contracts," "Procurement," and then the
Procurement Number POT-PA-0000000292. Bidders must subscribe to the
Holder's List on the right hand side of the screen in order to receive automatic
email notification of future addenda and to be placed on the Holder's List.
Holder's Lists will be updated regularly and posted to the specific
procurements page. Additional Instructions available in Section 00 21 00 -
Instructions to Bidders.
Public Works Effective July 1, 2019, all businesses are required to have training
Training before bidding on public works projects and prevailing wage under
Requirements: RCW 39.04.359 and RCW 39.12, or is on the list of exempt
businesses maintained by the Department of Labor and Industries. The bidder
must designate a person or persons to be trained on these requirements. The
training will be provided by the Department of Labor and Industries or by a
training provider whose curriculum is approved by the Department of Labor
and Industries.
Please refer to Labor and Industries' web site
(https://www.lni.wa.gov/TradesLicensing/PrevWage/Contractors/Training.asp?
utm_medium=email&utm_source=govdelivery ) for more information and
training dates, requirements, and exemptions. Failure to attend this training
could result in a determination of "not responsible" and the bidder not being
awarded a public works contract.
ProjectNo.101686.01 001113-2
ContractNo.POT-PA-0000000292
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Bid Title: Edgewood Nyholm Windmill Relocation Category: Bids, RFPs & RFQs Status: Open
City of Edgewood
Bid Due: 8/04/2026
Number Document(s) Updates Status Agency Contact Name RFQ - 2027-03 School Bus Quotations
Office of Superintendent of Public Instruction
Bid Due: 8/03/2026
Number Document(s) Updates Status Agency Contact Name RFQ - 2027-03 School Bus Quotations
Office of Superintendent of Public Instruction
Bid Due: 8/03/2026
Project ID: CTY-CR-2025-10 Title: CITYWIDE CONSULTANT ROSTER: Transportation Consulting Addenda: 0 Release Date:
City of Seattle
Bid Due: 12/30/2030