East Palatka Septic to Sewer Project - Phase IV
| Agency: | Putnam County Board of County Commissioners |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Apr 14, 2025 |
| Due Date: | Apr 29, 2025 |
| Solicitation No: | Bid 25-14 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Main
Agency
Putnam County Board of County Commissioners
Putnam County Board of County Commissioners
Status
Active
Active
Fiscal Year
2025
2025
Type
Announcement
Announcement
Department
Online Submissions
No
No
Project Estimate
Piggyback Solicitation
No
No
Insurance Required
No
No
Bid Bond Required
Yes
Yes
Bid Bond Amount
5% of total bid amount
5% of total bid amount
Performance Bond Required
Yes
Yes
Performance Bond Amount
100% of total of total bid amount if $200,000 or greater
100% of total of total bid amount if $200,000 or greater
Construction Bond Required
Yes
Yes
Construction Bond Amount
100% of total bid amount if $200,000 or greater
100% of total bid amount if $200,000 or greater
Scope of Services
The Putnam County Board of County Commissioners is requesting sealed bids from qualified contractors for East Palatka Septic to Sewer Phase IV Project. This work shall take place in the Dunns Creek area on San Mateo Rd., Butler Dr., Belle Dr., Sanjan Dr., Gail Dr., Riverside Ave., Waterside Ave., Shoreline Ave., Waterway Ave., and US 17 (SR 15) in Putnam County. The work encompasses the construction of individual residential grinder pump stations, small diameter sanitary force main piping and master pump station and force main piping. The CONTRACTOR shall be responsible to ensure that all sanitary force main piping shall be constructed in accordance with the Florida Department of Environmental Protection (FDEP) permit, specifications, and guidelines. The sanitary force main and directional bores under roadways and driveways along US 17 (SR 15) shall be constructed in accordance with the Florida Department of Transportation (FDOT) utility permit and specifications as outlined in the latest edition of the Standard Specifications for Road and Bridge Construction and the latest addition of the FDOT Roadway Design Standards. Bid
The Bid portion of this project will consist of the construction of individual residential grinder pump stations, small diameter sanitary force main piping and master pump station and force main piping, as well as directional bores under roadways and driveways along US 17 (SR 15) connecting to the existing 6-inch sanitary force main at the southwest corner of US 17 (SR 15) and Horse Landing Road in compliance with current FDEP and FDOT standard specifications. Bid Documents, Construction Specifications and Drawings are available online at: https://main.putnam-fl.com/?page_id=65#callforbidslink .
The Putnam County Board of County Commissioners is requesting sealed bids from qualified contractors for East Palatka Septic to Sewer Phase IV Project. This work shall take place in the Dunns Creek area on San Mateo Rd., Butler Dr., Belle Dr., Sanjan Dr., Gail Dr., Riverside Ave., Waterside Ave., Shoreline Ave., Waterway Ave., and US 17 (SR 15) in Putnam County. The work encompasses the construction of individual residential grinder pump stations, small diameter sanitary force main piping and master pump station and force main piping. The CONTRACTOR shall be responsible to ensure that all sanitary force main piping shall be constructed in accordance with the Florida Department of Environmental Protection (FDEP) permit, specifications, and guidelines. The sanitary force main and directional bores under roadways and driveways along US 17 (SR 15) shall be constructed in accordance with the Florida Department of Transportation (FDOT) utility permit and specifications as outlined in the latest edition of the Standard Specifications for Road and Bridge Construction and the latest addition of the FDOT Roadway Design Standards. Bid
The Bid portion of this project will consist of the construction of individual residential grinder pump stations, small diameter sanitary force main piping and master pump station and force main piping, as well as directional bores under roadways and driveways along US 17 (SR 15) connecting to the existing 6-inch sanitary force main at the southwest corner of US 17 (SR 15) and Horse Landing Road in compliance with current FDEP and FDOT standard specifications. Bid Documents, Construction Specifications and Drawings are available online at: https://main.putnam-fl.com/?page_id=65#callforbidslink .
Dates(All times are listed as
EST
)
Broadcast Date
3/26/2025 4:00 PM EST
3/26/2025 4:00 PM EST
Question End Date
4/21/2025 2:00 PM EST
4/21/2025 2:00 PM EST
Due Date
4/29/2025 2:00 PM EST
4/29/2025 2:00 PM EST
Bid Opening Date
Pre-Bid Conferences
Total: 1
(All times are listed as
EST
)
| Date | Time | Mandatory | Location |
| 4/3/2025 | 8:00 AM | Yes |
The county will conduct a mandatory pre-bid meeting on April 3, 2025 beginning at 10:00 AM EST. The meeting will be held at the Government Complex located at 2509 Crill Avenue, Suite 200, Palatka, FL 32177
Attendance at the pre-bid meeting is a mandatory requirement to be considered a ‘Responsive Bidder’ |
Documents
Total: 11
Commodity Codes
Total: 5
| Code | Description |
| [890-66] | Sewer Lift Stations and Parts |
| [210-35] | Joint Sealing Compound (For Sewer and Drain Pipes) |
| [910-63] | Public Utilities: Water, Sewer and Gas Maintenance and Repair |
| [913-45] | Construction, Sewer and Storm Drain |
| [913-81] | Maintenance and Repair, Sewer and Storm Drain (Including Removal) |
Publications
Total: 1
| Publication | Date |
| Palatka Daily News | 3/26/2025 |
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Advertisement Detail Department of Transportation Agency Decisions PALM BEACH AND NORTHERN 3 COUNTIES(NC3)
State Government of Florida
Due by 10/11/2040
Advertisement Detail Department of Transportation Single Source Reedy Creek Improvement District Advertisement Number:
State Government of Florida
Due by 11/12/2050
Solicitation # Project Title Due Date #010-26 Sardinia Drive Lift Station #32 Emergency
City of Eustis
Due by 9/11/2026
Project ID: PSUT-26-06 Title: Phase 2 Polk Building Renovations Addenda: 0 Release Date:
City of Pembroke Pines
Due by 9/08/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.