East Michigan Fog Sealing
| Agency: | City of Kalamazoo |
|---|---|
| State: | Michigan |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jan 30, 2026 |
| Due Date: | Feb 19, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Closing date
February 19, 2026, 03:30 PM
- Reference number 91396-025.0
- Status Open
-
Summary
It is the intent of these plans and specifications to provide for a general contractor who shall provide all labor,
materials, tools and equipment necessary to perform in a professional manner for the East Michigan Fog sealing
project as described in the specifications and bid document.
91396-025.0-bid document (PDF, 2MB)
91396-025.0-Distribution List (PDF, 45KB)
91396-025.0-special provisions (PDF, 144KB)
SCOPE OF WORK
The scope of work for this project shall consist of the following work along East Michigan Ave. from Riverview to Wallace:
1) Remove existing pavement markings per plan and as directed by the Engineer.
2) Place temporary lane markings, construction signage and traffic control for the appropriate phase of work.
3) For each phase of construction: prepare pavement for fog seal by cleaning/sweeping to ensure a dry and clean surface for fog seal application.
4) Fog seal the roadway for each phase of construction.
5) Place raised temporary pavement markings prior to allowing traffic on roadway.
6) Provide and place pavement markings consistent with existing roadway markings in type, color, width, pattern, and alignment, in accordance with applicable standards and specifications.
7) Place non-motorized delineators and buffers.
8) Remove traffic control and open roadway to traffic.
All necessary traffic control, labor, materials, tools, equipment, and other items incidental to the work being performed shall be included in the Contractor’s unit price for this contract. Such items will not be bid or paid for separately but shall be included in the overall unit price.
The bidder shall furnish all labor, supervision, supplies, tools, equipment, and other means necessary or proper for performing and completing the work. The bidder shall be responsible for the cleaning up of the job site and shall repair or restore all structures and property that may be damaged or disturbed during performance of the work to the satisfaction of the Public Services Department for the City of Kalamazoo. Drainage structure covers shall be salvaged and reused if in usable condition; otherwise, they shall be replaced. Where needed, all traffic control used for such operations as defined by the MMUTCD will be the responsibility of the bidder.
The bidder shall have all work completed by September 1, 2026.
See Also
Bid Number: ITB - 4685 Bid Title: ITB 4685 - 2027 Annual Flower
City of Midland
Due by 9/22/2026
Solicitation Number: furn01-12 Notice Type: Sources Sought Synopsis: Added: Dec 21, 2012 2:49
Department of Justice
Due by 1/22/2032
2023 Bond -BP #8 Addendum - Twain, Dooley and Salk Renovations Fraser Public
Fraser Public Schools
Due by 9/22/2026
Foundations, Sitework, and Outdoor Athletics for the New High School 03A - Foundations
Flint Community Schools
Due by 9/22/2026