East Lake Booster Pump Station (BPS) Relocation
| Agency: | State Government of Georgia |
|---|---|
| State: | Georgia |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Feb 20, 2026 |
| Due Date: | Mar 20, 2026 |
| Solicitation No: | PE-67555-NONST-2026-000000018 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-67555-NONST-2026-000000018 | East Lake Booster Pump Station (BPS) Relocation | Henry County Water And Sewer Authority |
Feb 20, 2026 @ 09:14 AM
|
Mar 20, 2026 @ 02:00 PM
|
Start Date: Feb 20, 2026 @ 09:14 AM ET
End Date:
Mar 20, 2026 @ 02:00 PM ET
Description
The Project consists of the following major elements: pre-construction consultation and construction of a replacement of the existing East Lake BPS with a new BPS on the existing site, as well as approximately 5,000 linear feet (LF) of new water main outside of the existing BPS property (suction and discharge piping) to improve the system hydraulics. The new BPS is anticipated to have the following features:
- Horizontal split case pumps inside new BPS building
- Site piping designed to maintain the existing operations of the onsite ground storage tanks
- Standby power generator with automatic transfer switch
- The existing BPS interior will be demolished, and the building will be left for storage if possible
- The new building will have a roll up door and crane system for pump removal/access, climate controlled electrical room with new switchgear and VFDs.
| Code | Description |
| 91339 | Construction, Pipe Culvert |
| 91340 | Construction, Pipeline, Including Aerial Crossings |
| 91345 | Construction, Sewer and Storm Drain |
| 91356 | Construction, Utility and Underground Projects |
| 91359 | Construction and Upgrades, Wastewater Treatment Plant |
| 91360 | Construction, Water System, Plants, Main and Service Line |
| 90924 | Building Construction, Commercial and Institutional |
| 90922 | Building Construction, Non-Residential, Office Bldg., etc. |
| 90921 | Building Construction, Industrial, Warehouse, etc. |
Jeff Allen
jeff.allen@hcwa.com
770-957-6659
See Also
Project: REMOVAL & INSTALLATION OF (2) 750 GPM VERTICAL TURBINE PUMPS MORGAN DAIRY
Floyd County
Due by 9/21/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-65700-NONST-2026-000000102
State Government of Georgia
Due by 9/21/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-62000-NONST-2027-000000046
State Government of Georgia
Due by 10/01/2026
Bid Number: P27-4200-05 Bid Title: High Pressure Breathing Air Compressor Replacement at Kingsbay
Camden County, GA
Due by 10/01/2026