Earthen Dam Renovation- Winder Water Reservoir #2 (aka Laurel Lane Dam)
| Agency: | Winder city |
|---|---|
| State: | Georgia |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jul 9, 2025 |
| Due Date: | Aug 7, 2025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Earthen Dam Renovation- Winder Water Reservoir #2 (aka Laurel Lane Dam)
- Department: Engineering
- RFP Number: Capital Project# UT23-12A
- Start Date: 07/09/2025
- Close Date: 08/07/2025 3:00 PM
Invitation to Bid
City of Winder, Georgia (Owner) is requesting Bids for the Construction of the following Project:
Earthen Dam Renovation- Winder Water Reservoir #2 (aka Laurel Lane Dam)
Capital Project# UT23-12A
Sealed Bids for the Construction of the Project will be received at the front desk of the Public
Utilities Facility, 138 Sweetwater Trail, Winder, Georgia 30680 (Clearly Marked Attention: Robert
Cheshire, Renovation of Winder Water Reservoir #2, Project #UT23-12A), until Thursday,
August 7, 2025, at 3:00 p.m., local time. Soon thereafter, all received bids will be opened publicly
and read aloud.
The Renovation Project generally consists of the following Work:
Installation of an additional internal seepage drainage system near the downstream toe of
the earthen dam utilizing a combination of fine & coarse aggregate along with new PVC
collection pipes. The stabilization of the outlet support (endsill) for the existing RCP principal
spillway conduit through the placement of flowable fill/ non-shrink grout in existing voids.
Revegetation of areas disturbed by the renovation to the earthen dam.
Bids are requested for the following Contract: Agreement Between Owner and Contractor For
Construction Contract (Stipulated Price): Earthen Dam Renovation- Winder Water
Reservoir #2 (Laurel Lane Dam).
The Project has an expected duration of 35 days.
Obtaining Bidding Documents:
Please use the links below to access the Bidding Documents (Project Manual and Plans):
Laurel Lane Dam Plan Set Issue5 7-2-25-Final
Laurel Lane Dam Renov Proj Manual 7-7-25-Final-pdf
Alternatively, information and Bidding Documents for the Project can be obtained from the Georgia Procurement
Registry (GPR) at https://ssl.doas.state.ga.us/gpr/ or the City of Winder’s website at
www.cityofwinder.com .
Pre-bid Meeting:
No formal pre-bid meeting will be held for this project. However, prospective bidders are
encouraged to attend a City/Engineer facilitated site visit on Wednesday, July 23, 2025, at 10:00
am. Note: The property where the Dam/ Reservoir is located (near the end of Laurel Lane) is gated
and not open to the general-public, thus access is limited. All questions must be submitted in
writing to the Engineer of Record, Brian Kimsey, PE, via email at brian@carterengineering.com
by 2:00 pm, Thursday, July 31, 2025. No Bids will be accepted by fax or email. All bids must be
physically submitted as noted above.
Instructions to Bidders:
For all further requirements regarding bid submittal, qualifications, procedures, and contract
award, refer to the Instructions to Bidders that are included in the Bidding Documents.
See Also
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-65750-NONST-2026-000000048
State Government of Georgia
Due by 10/29/2026
Project: Lovinggood MS Flooring and Auditorium Seating, B27062 Ref. #: B27062 Type: IFB
Cobb County School District
Due by 11/05/2026
Home 2026 Generator Replacement Sewer Pump Station #3 2026 Generator Replacement Sewer Pump
Town of Tyrone
Due by 11/04/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66098-NONST-2027-000000155
State Government of Georgia
Due by 11/19/2026