ORDERED DEMOLITION OF 112 E. WILKINS ST., JACKSON, MI. BIDS DUE BY FRIDAY, JANUARY 10, 2025, BY 9:00 AM. SERVICES TO INCLUDE:
-
Hazardous materials must be abated in accordance with MIOSHA and DEQ regulations and the attached Pre-Demolition Compliance Survey assessment.
-
Compact all clean backfill material with a hoe-pack or vibrating roller compactor.
-
Remove 1 curb(s) cut(s) and entry approach(s). (16’ lineal feet)
-
Install 20 lineal feet of curb and gutter.
-
Remove and replace
40 lineal feet
of cracked, heaved and broken public sidewalks. (raise grade through walk to allow to cover tree roots and provide positive slope to ROW area)
-
See enclosed water and sewer service records for approximate location and any special instructions for shared services. If no service card is provided it is the contractor’s responsibility to ensure that neighboring water and sewer services are operational at the conclusion of the demolition.
-
Trees/shrubs: Remove all trees to N. of property to allow for site regrade. Remove 5 marked trees to the NW corner of property. Remove all brush to the N and E to the alley way to allow for removal of all debris. Plant 2- 2 1/2” caliper street trees. Japanese Lilac, Cleveland Pear along E Wilkins ROW area. Plant 2 2 ½” Maple trees on main site to locations selected by City of Jackson.
-
Miscellaneous: Remove driveway and concrete pads to N. Remove chain link fencing to N and W. Remove N retaining wall extending to E alley to allow for full site regrade to blend with N. property. Remove all overgrowth along alley to allow for full regrade. Remove all trash and debris from property and all debris that has extended to E alley.
This will be a winter work demolition project with 70% billable upon completion of all demolitions, tree and brush removals, removal of all retaining walls and listed debris and providing a quality bladed winter grade completed no later than March 14th, 2025. Final completion to bill remaining 30% for concrete, final grade/topsoil/seed/straw then completed no later than May 22, 2025.
Timeline
Release Project Date:
December 27, 2024
Proposal Submission Deadline:
January 10, 2025, 9:00am
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.
Sign-up for a Free Trial, Government Bid Alerts
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Try One Week FREE Now
See Also
due date & time bid description bid # primary contact status July 9,
City of Ann Arbor
Bid Due: 7/09/2026
Project ID: Title: Demolition of 1311 S. Martin Luther King Jr. Addenda: 0
City of Jackson
Bid Due: 6/30/2026