CONTRACT DOCUMENTS
FOR CONSTRUCTION OF
DOWNSTREAM GAS SOUTH
SEWER REPLACEMENT
GCDWR Project No. F-1621-01
BL126-25
Volume 1 of 3
Prepared For:
Gwinnett County
Department of Water Resources
684 Winder Highway
Lawrenceville, GA 30045
Prepared By:
Barge Design Solutions, Inc.
6525 The Corners Parkway, Suite 450
Peachtree Corners, GA 30092
OCTOBER 2025
00 11 16
INVITATION TO BID
General Notice
The Gwinnett County Board of Commissioners (Owner) is requesting Bids for the construction of
the following Project pursuant to O.C.G.A. §36-91-20:
Downstream of Gas South Sewer Replacement
F-1621-01
This Project includes the following work:
The installation of approximately 5,000 LF of ductile iron gravity sewer main from immediately
downstream of the Gas South Arena to just south of SR-120, running approximately parallel to Fork
Creek and the existing 18” to 24” VCP Fork Creek sewer interceptor. Approximately 500 LF of the
proposed sewer is 8" pipe and 4,500 LF is 30" pipe. Two (2) public right-of-way crossings will be
performed by 48” trench less installation. A total of seven (7) connections to branch sewer lines will be
required. The project also includes restoration of the project corridor, traffic control, erosion and
sedimentation control, and abandonment of sanitary sewer mains and appurtenances throughout the
project limits.
The Project is to be substantially complete and ready for operation within 420 days after the date when
the Contract Times commence to run as provided in General Conditions. The Project is to be complete
and eligible for final payment 30 days after the date for Substantial Completion.
All competitive, sealed bidding shall conform to O.C.G.A. §36-91-2, -20 to -22.
Special Conditions
The Gwinnett County Department of Water Resources shall comply with O.C.G.A § 36-91-20 as
amended for mandatory pre-qualification of prospective bidders. This notice is ONLY for bidders that
have already pre-qualified under the Annual Pre-qualification of Contractors for Sub-Section 2,
Large, greater that 12”, of Installation, Replacement and/or Relocation of Gravity Sewer Mains, Force
Mains, and Appurtenances included in Section 00 21 14 “List of Pre-Qualified Bidders.”
For contractors interested in pre-qualification, the Annual Pre-Qualification Application must be
completed and submitted to the Gwinnett County Department of Financial Services - Purchasing
Division- 4th Floor Charlotte J. Nash Building, 75 Langley Drive, Lawrenceville, Georgia 30046 or
submitted via email to Brittany.Bryant@GwinnettCounty.com. Contractors must be pre-qualified prior
to the first date of the advertisement. You may download the Pre-qualification Application
at www.GwinnettCounty.com or contact Brittany Bryant and ask if an application be sent to
you. Depending on the scope and complexity, individual projects may require pre-qualification,
independent of the annual pre-qualification process.
NOTE: Bids submitted by contractors who have not been pre-qualified WILL NOT BE CONSIDERED.
Gwinnett County Department of Water Resources
Downstream Gas South Sewer Replacement - F-1621-01
00 11 16 - 1
10/2025
Obtaining Bidding Documents
Drawings and Specifications must be purchased from Barge Design Solutions, Inc. through the purchasing
system at bidding.bargedesign.com for a non-refundable fee of $200.00. Only complete sets will be issued.
Bidders are responsible for ensuring that a complete set of documents, as
defined in Section 00 5 2 13 “Agreement,” are used in the preparation of theirBids.
Printed copies of the Contract Documents, Technical Data, and other information may be examined free of charge,
pursuant to O.C.G.A §36-91-20(4), atthe following addresses:
GwinnettCounty Department ofFinancial Services
Purchasing Division
4th Floor Charlotte J. Nash Building Nash Building
75 Langley Drive
Lawrenceville, Georgia30046
Hours Available for Viewing: 8am-5pm
Pre-bid Date and Location:
A non-mandatory pre-bid conference for the Project is scheduled for 10:00 A.M. on October 24, 2025. To access,
dial 1-408-418-9388, enter access code 2339 721 2842. All interested parties are urged to attend. The Pre-bid
conference is to be utilized by contractors and subcontractors to ask any questions in order to submit a bid for this
project. Note: Contractors can go by the project area at any time to look at the existing conditions.
Instructions on SubmittingQuestions:
Questions
regarding
bids
should
be
submitted
to
Brittany
Bryant
at
Brittany.Bryant@GwinnettCounty.com no later than 3:00 P.M. local time, November 12, 2025. Bids are legal and
binding upon the bidder when submitted.
Obtain the Plan-Holders List
The plan-holders list isavailable at bidding.bargedesign.com.
Delivery of Bids
Sealed Bids must be delivered to Owner as specified in Section 00 21 13 “Instructions to Bidders” no
later than 2:50 P.M. local time on November 21, 2025, to be accepted. Any Bid received after 02:50 P.M. Any Bid
received after 2:50 P.M. will not be accepted. Bids will be publicly opened and read at 3:00 P.M. The bid opening will be
virtual ONLY. To access the bid opening virtually, visit the following link (https://gwinnettgov.webex.com/
gwinnettgov/j.php?MTID=m253f03e7ee9021075a42b38e3a722a44) or dial 1-408-418-9388, and enter Conference ID
2338 377 5415.
Instructions toBidders
See Section 00 21 13 “Instructions to Bidders” included in the
Documents for detailed requirements for preparing and submitting a Bid and award of the Contract.
Bidding
This Invitation to Bid is issued by:
Gwinnett County Board of Commissioners
Brittany Bryant
Purchasing Agent
October 8, 2025
END OF SECTION
Gwinnett County Department of Water Resources
Downstream Gas South Sewer Replacement - F-1621-01
00 11 16 - 2
10/2025
This page summarizes the opportunity, including an overview and a preview of the attached documents.