Dover-Foxcroft, ME – Lincoln Street over Dunham Brook Bridge Rehabilitation
| Agency: | Wright-Pierce |
|---|---|
| State: | Massachusetts |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Apr 27, 2026 |
| Due Date: | May 25, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
The project consists of full demolition of the superstructure and the substructure on the upstream side. The downstream side will consist of a partial substructure removal and replacement with a concrete bridge seat and concrete repairs to the abutment backface. These rehabilitated abutments will support precast concrete beams and cast-in-place closure beams on either end for a total length of 22’-0”. The upstream side will be replaced with a 42’-1” long precast concrete rigid frame structure containing an angle point to match the existing stream alignment. The training walls on the upstream side will be replaced using the existing stones to construct mortar rubble masonry walls supported on cast-in-place concrete footings. Additionally, the retaining wall underneath the building on the downstream side will be rehabilitated in a similar fashion to the abutment to remain. The out-to-out width of the proposed replacement structure will be 68’-10”, with a roadway width of 48’-9”.
- Follow the hyperlink to the project provided at the end of the project information.
-
First time users will need to register for a FREE account.
- If you have not previously registered, click on Create New Company.
- Fill out the forms and Create user Account.
- You will receive a confirmation email that you will need to click on to activate your account. (Check Spam filter if you do not receive it.)
- You may either Download or Order a paper copy to be shipped to you from Xpress Copy.
- If downloading, click on View Download Queue and then Proceed to Download.
See Also
Follow Construction Services for the Construction of the New Project Office at East
DEPT OF DEFENSE
Header Information Bid Number: BD-27-1030-0H100-0H002-132949 Description: 612874 SHREWSBURY-WORCESTER Bridge Preservation, S-14-021=W-44-115, I-290 (EB
Commonwealth of Massachusetts
Due by 10/27/2026
Follow East Bulkhead Replacement, East Boat Basin, Cape Cod Canal, Sandwich MA Active
DEPT OF DEFENSE
Due by 9/21/2026
Follow W50S8126BA012 Active Contract Opportunity Notice ID W50S8126BA012 Related Notice Department/Ind. Agency DEPT
DEPT OF DEFENSE
Due by 9/29/2026