Dix Park Stabilization – Window Boarding

Agency: State Government of North Carolina
State: North Carolina
Type of Government: State & Local
Posted Date: Aug 14, 2025
Due Date: Aug 29, 2025
Solicitation No: 274-ES-FO-FY26-DixParkWindowBoarding
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Solicitation Number: 274-ES-FO-FY26-DixParkWindowBoarding
Project Title: Dix Park Stabilization – Window Boarding
Description: All windows, glass doors, and glass present in a metal or wood door, including all windows on the first level of buildings and windows/doors within 8 feet of ground level, will be covered with minimum ¾ inch Severe Weather CCX grade plywood. This is to also include anything below the ground level that may be accessible or accessible from a horizontal reach from the ground or platform area within 4 feet. Plywood should be secured into the framing around the windows and doors. All doors should remain operable (screws into the metal part of the door are acceptable). Windows and doors of buildings that have current cages/bars are to be covered with plywood as well. Any foundation penetrations that would lead to access to the building basements for crawl space will be covered with same plywood material.
Opening Date: 8/29/2025 2:00 PM
Posted Date: 8/15/2025
Status: Open
Department: CITY OF RALEIGH
Solicitation Number
*
274-ES-FO-FY26-DixParkWindowBoarding
Department
CITY OF RALEIGH
Status Reason
Open
Opening Date
2025-08-29T14:00:00.0000000
Posted Date
*
2025-08-14T19:52:50.0000000Z
Commodity Code
Construction Services
Mandatory Conference/Site Visit
Special Instructions
Project Manager Contact: Tommy Mangum e-mail: Tommy.Mangum@raleighnc.gov
Description
All windows, glass doors, and glass present in a metal or wood door, including all windows on the first level of buildings and windows/doors within 8 feet of ground level, will be covered with minimum ¾ inch Severe Weather CCX grade plywood. This is to also include anything below the ground level that may be accessible or accessible from a horizontal reach from the ground or platform area within 4 feet. Plywood should be secured into the framing around the windows and doors. All doors should remain operable (screws into the metal part of the door are acceptable). Windows and doors of buildings that have current cages/bars are to be covered with plywood as well. Any foundation penetrations that would lead to access to the building basements for crawl space will be covered with same plywood material.
Attachments
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

DK00466 POC HB-0054-BRIDGE 040509 OVER SOUTH FORK NEW RIVER ON SR 1222 (METHODIST

Division of Highways

Due by 9/17/2026

Follow Paint All Exterior and Common Area Doors, Buildings 4166, 4167, 4168, 4169

DEPT OF DEFENSE

Due by 9/18/2026

Follow N400857570861, Replace Barn Doors with Overhead Door, B149, Bay J Active Contract

DEPT OF DEFENSE

Due by 9/17/2026

Bid Number: IF2745 Bid Title: Barbara Jane Avenue Sidewalk Project Category: Informal Bids

City of Winston-Salem

Due by 9/24/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.