Dix Park Stabilization – Window Boarding
| Agency: | State Government of North Carolina |
|---|---|
| State: | North Carolina |
| Type of Government: | State & Local |
| Posted Date: | Aug 14, 2025 |
| Due Date: | Aug 29, 2025 |
| Solicitation No: | 274-ES-FO-FY26-DixParkWindowBoarding |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Solicitation Number: | 274-ES-FO-FY26-DixParkWindowBoarding |
| Project Title: | Dix Park Stabilization – Window Boarding |
| Description: | All windows, glass doors, and glass present in a metal or wood door, including all windows on the first level of buildings and windows/doors within 8 feet of ground level, will be covered with minimum ¾ inch Severe Weather CCX grade plywood. This is to also include anything below the ground level that may be accessible or accessible from a horizontal reach from the ground or platform area within 4 feet. Plywood should be secured into the framing around the windows and doors. All doors should remain operable (screws into the metal part of the door are acceptable). Windows and doors of buildings that have current cages/bars are to be covered with plywood as well. Any foundation penetrations that would lead to access to the building basements for crawl space will be covered with same plywood material. |
| Opening Date: | 8/29/2025 2:00 PM |
| Posted Date: | 8/15/2025 |
| Status: | Open |
| Department: | CITY OF RALEIGH |
|
Solicitation Number
*
274-ES-FO-FY26-DixParkWindowBoarding
|
Department
CITY OF RALEIGH
|
Status Reason
Open
|
|
|
Opening Date
2025-08-29T14:00:00.0000000
|
Posted Date
*
2025-08-14T19:52:50.0000000Z
|
Commodity Code
Construction Services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
Project Manager Contact: Tommy Mangum e-mail: Tommy.Mangum@raleighnc.gov
|
||
|
Description
All windows, glass doors, and glass present in a metal or wood door, including all windows on the first level of buildings and windows/doors within 8 feet of ground level, will be covered with minimum ¾ inch Severe Weather CCX grade plywood. This is to also include anything below the ground level that may be accessible or accessible from a horizontal reach from the ground or platform area within 4 feet. Plywood should be secured into the framing around the windows and doors. All doors should remain operable (screws into the metal part of the door are acceptable). Windows and doors of buildings that have current cages/bars are to be covered with plywood as well. Any foundation penetrations that would lead to access to the building basements for crawl space will be covered with same plywood material.
|
|||
|
Attachments
|
|||
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Bid Title: BID RESULTS - Wrightsboro Elevated Water Tank Rehabilitation Category: Construction Services
Cape Fear Public Utility Authority
Due by 11/27/2026
DM00519; WBS DF18313.2100306; HELENE POC DM00519 Permanent Repairs to Bridge 990079 Over South
Division of Highways
Due by 11/18/2026
Solicitation Number: 10474263-01-27 Project Title: Buggy Building Roof Replacement Description: Lee County is
State Government of North Carolina
Due by 11/10/2026
Solicitation Number: 125-2026-10-3 Project Title: Founders Building Hot Water system rennovation Description: Scope
State Government of North Carolina
Due by 11/12/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.