26-008 District Wide Intercom, 2025 Bond

Agency: San Angelo Independent School District
State: Texas
Type of Government: State & Local
Posted Date: May 18, 2026
Due Date: May 20, 2026
Solicitation No: 26-008
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
26-008 District Wide Intercom, 2025 Bond
PRE-BID MEETING - May 13, 2026 9:00 a.m. - Start Administration Building, 1621 University, San Angelo, TX 76904
Followed by Central High School, Oakes, and Ft. Concho Elementary. Additional walks may be scheduled through the district.
BE PREPARED TO PROVIDE ID AT EACH CAMPUS
Bid Opening Date and Time: Wednesday, May 20, 2026 - 3:00 p.m.
Download Bid Documents
Addendum #1
26-008Addendum01Summary.pdf

Attachment Preview

San Angelo Independent School District
26-008
District Wide Intercom, 2025 Bond
The San Angelo Independent School District is accepting sealed proposals for the install of intercom
systems throughout district. Submissions shall include all aspects of work outlined in the Special
Terms and conditions. This project will take place on 14 different campuses throughout San Angelo
and should be a consideration when bidding. A Prebid meeting will begin at the Administration
Building, 1621 University, on Wednesday 05/13/26 at 9AM. Be prepared, with an ID, to check
in at all front offices. Immediately following this we will walk Central High School, Oakes,
and Ft. Concho Elementary. Additional walks may be scheduled through the district.
Proposals will be received in the Purchasing Department, 1621 University, San Angelo, TX 76904 until
3PM, Wednesday, May 20, 2026. Proposal envelopes shall be plainly marked on the lower left-hand
corner with your company name and the following information:
Sealed RFP #26-008 For: District Wide Intercom, 2025 Bond
Your Company Name: Do Not Open Until: 05/20/2026 - 3PM
The bid packet may be found at http://www.saisd.org/bids OR may be
obtained from the SAISD Purchasing Department, 1621 University, San Angelo, Texas, 325.947.3759.
Any deviation from our General Terms and Conditions for Bidding and the Special
Terms and Conditions must be noted on the Deviation/Compliance Signature form
provided (From E).
Proposals will be publicly opened immediately following the specified deadline. Any proposal received
later than the specified time, whether delivered in person or mailed, will be disqualified. FAXED &
EMAILED PROPOSALS WILL NOT BE ACCEPTED.
After evaluation of all proposals is completed, the Purchasing Department will present a
recommendation to the SAISD Board of Trustees at a scheduled meeting. After approval by the Board
of Trustees, the bid tab will be posted on the SAISD website at http://www.saisd.org/bids.
Disclosure Statement:
HB 914 requires vendors to submit a conflict-of-interest questionnaire for gifts
given to public officers. HB 914 and this questionnaire may be found on the San
Angelo ISD website at www.saisd.org/ HB914. Each vendor desiring to do
business with San Angelo ISD is required to familiarize themselves with this law
and comply with all requirements. Failure to follow these requirements may
result in being removed from the approved vendor list for San Angelo ISD.
The San Angelo Independent School District reserves the right to reject any or all proposals and to
accept any proposal deemed most advantageous to the District.
If additional information should be required, contact the undersigned at 325.947.3759.
Respectfully,
Jason Henry
Director of Purchasing
Jason.Henry@saisd.org

San Angelo Independent School District
District Wide Intercom, 2025 Bond
Request for Proposal #26-008
TABLE OF CONTENTS
Special Terms and Conditions 88 pages
SAISD Request for Proposal Form 1 page
(must return)
BID FORM 3 pages
(must return)
SAISD Standard Forms 25 pages
1. General Conditions for Bidding
2. Standard Terms and Conditions
3. Non-Collusion Statement Form (must return)
4. Felony Conviction Notification Form (must return)
5. Bidders Certification Form (must return)
6. Debarment and Suspension Certification Form (must return)
7. Deviation/Compliance Form (must return)
8. No Bid Notification Form (return if applicable)
9. Certification Packet-6 pages (must return)
10. Forms Checklist
11. W-9 Form (must return page 1)
The following criteria will be used to award the bid based on the best
value for the District. The % for scoring is listed beside the criteria
requirement.
1. Purchase price (40%)
2. Reputation of the vendor (5%)
3. Quality of vendor's goods or services (5%)
4. Extent to which the goods or services meet the district's needs (20%)
5. Vendor's past relationship with district (10%)
6. HUB requirements
7. Total long-term cost to the district to acquire the goods (10%)
8. Vendor's ultimate parent company or majority owner has its principal
place of business in the State of Texas or employees at least 500
persons in this state (not applicable to contracts related to
telecommunications and information services, building construction and
maintenance, or instructional materials)
9. Any other relevant factor listed in the request for proposal (10%)
Availability of product and service in our local area

Sealed Bid San Angelo Independent School District Purchasing Department 1621 University Ave. San Angelo, TX 76904 Attn: Jason A. Henry, Director of Purchasing Bid: 26-008 District Wide Intercom, 2025 Bond Company Name__________________________ Bid Deadline: 05/20/26 - 3:00 PM diB delaeS

Sealed
Bid
diB
delaeS
San Angelo Independent School District
Purchasing Department
Please duplicate the below label and affix to the outside of your sealed proposal
envelope.
San Angelo Independent School District
Purchasing Department
1621 University Ave.
San Angelo, TX 76904
Attn: Jason A. Henry, Director of Purchasing
Bid: 26-008
District Wide Intercom, 2025 Bond
Company Name__________________________
Bid Deadline: 05/20/26 - 3:00 PM
Vendor's name and return address should be printed on the sealed proposal
envelope.
San Angelo ISD has added a new feature to our bid opportunities webpage. You can sign up to receive an
email alert whenever we post new bid opportunities to the webpage. Note: this is for all bid opportunities.
If you're interested in signing up, go to https://www.saisd.org/bids
Click on the orange bell icon on the webpage
Click on the word "Purchasing" in the box that pops up.
Click Next
Fill in your name & email address.
Click "signup"

San Angelo Independent School District
Special Terms and Conditions
District Wide Intercom, 2025 Bond
RFP # 26-008
The San Angelo Independent School District is accepting sealed proposals for the install of
intercom systems throughout district. Submissions shall include all aspects of work outlined in
the Special Terms and conditions. This project will take place on 14 different campuses
throughout San Angelo and should be a consideration when bidding. A Prebid meeting will
begin at the Administration Building, 1621 University, on Wednesday 05/13/26 at 9AM. Be
prepared, with an ID, to check in at all front offices. Immediately following this we will walk
Central High School, Oakes, and Ft. Concho Elementary. Additional walks may be scheduled
through the district. All Submissions shall include the qualifications demonstrated for the
project. This section should include:
Personnel, with resumes attached to the Project Manager & Superintendent
Previous Related Experience, with concentration on K12
References
For more information, or to schedule a sight visit contact Jason A. Henry at 325-947-3759. All
bidders are highly encouraged to attend the Prebid meeting. (Jason.Henry@saisd.org)
All requests for substitutions shall be submitted by EOB 5/11/26 to be considered.
All questions shall be submitted no later than 2 PM on 5/15/26 to ensure they are answered.
ADDENDUM: In the event that any changes to this Bid Document occur It is the bidder's responsibility
to obtain any addenda that pertains to this bid. All addenda will be posted on the Bid Opportunity
page. http://www.saisd.org/bids
If this project is approved by the Board of Trustees, the district is expecting the work to take place
during the Summer/ Fall of 2026. Must be delivered and in place by 11/20/26.
Proof of insurance will be required for general liability, automobile liability, and worker's comp.
Please check the limits in the general conditions for bidding line 33.
All contractors/sub-contractors/employees of a contractor who work on District property where students
are present must present a clear criminal history report to the District prior to the start of the project.
The Board of Trustees, for the purpose of complying with Section 2288, Subchapter B of the Texas
Government Code for all public contracts, has adopted the prevailing wage rates as determined by the
US Department of Labor in accordance with the Davis -Bacon Act as the published rates for the
District. It is the responsibility of the contractor to pay the appropriate rate or higher on the construction
project or be subject to penalty as set forth in section 2258.023 of the Texas General Government Code.
This project will be subject to bonding requirements. See general conditions line 33.
All proposals MUST be submitted on the proposal form provided.
Proposal documents MUST be signed by the company's authorized representative in the space(s) provided.
Failure to manually sign the proposal documents may result in disqualification of the proposal.
The District reserves the right to waive formalities and/or irregularities and to accept or reject any/each
item separately or as a whole.

SAN ANGELO ISD PAGING UPGRADE PROJECT
D-SAN-1003-01
SECTION 00 0110 - TABLE OF CONTENTS
DIVISION 09
09 5113 - ACOUSTIC PANEL CEILINGS
DIVISION 27
27 0000 - COMMUNICATION CABLING
27 5116 - PUBLIC ADDRESS SYSTEM
04/27/26
CRUX TECHNOLOGY & SECURITY SOLUTIONS 00 0110 - 1
TABLE OF CONTENTS

SAN ANGELO ISD DISTRICT WIDE PAGING PROJECT
D-SAN-1003-01
SECTION 09 5113 - ACOUSTICAL PANEL CEILINGS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general conditions of Contract, including General and Supplementary
Conditions and Divisions-1 Specification sections apply to work of this section.
1.2 SUMMARY
A. Scope
1. Contractor shall provide and install a new ceiling tile after removal of existing
loudspeakers. New ceiling tiles shall match surrounding tiles. When required,
contractor shall provide clips to secure tiles in place in areas of return air systems.
B. Section Includes
1. Acoustical ceiling panels
C. Related Sections
1. Section 27 0000 "Communications Cabling"
2. Section 27 5116 "Public Address Systems"
1.3 REFERENCES
A. American Society for Testing and Materials (ASTM):
1. ASTM A 1008 Standard Specification for Steel, Sheet, Cold Rolled, Carbon,
Structural, High-Strength Low-Alloy and High-Strength Low-Alloy with Improved
Formability
2. ASTM A 641 Standard Specification for Zinc-Coated (Galvanized) Carbon Steel Wire
3. ASTM A 653 Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) by
the Hot-Dip Process
4. ASTM C 423 Sound Absorption and Sound Absorption Coefficients by the
Reverberation Room Method
5. ASTM C 635 Standard Specification for Metal Suspension Systems for Acoustical
Tile and Lay-in Panel Ceilings
6. ASTM C 636 Recommended Practice for Installation of Metal Ceiling Suspension
Systems for Acoustical Tile and Lay-in Panels
7. ASTM D 3273 Standard Test Method for Resistance to Growth of Mold on the
Surface of Interior Coatings in an Environmental Chamber
8. ASTM E 84 Standard Test Method for Surface Burning Characteristics of Building
Materials
9. ASTM E 580 Installation of Metal Suspension Systems in Areas Requiring Moderate
Seismic Restraint
10. ASTM E 1111 Standard Test Method for Measuring the Interzone Attenuation of
Ceilings Systems
11. ASTM E 1414 Standard Test Method for Airborne Sound Attenuation Between
Rooms Sharing a Common Ceiling Plenum
12. ASTM E 1264 Classification for Acoustical Ceiling Products
B. International Building Code
C. ASHRAE Standard 62.1-2004, Ventilation for Acceptable Indoor Air Quality
D. NFPA 70 National Electrical Code
CRUX TECHNOLOGY & SECURITY SOLUTIONS 09 5113 - 1
ACOUSTIC PANEL CEILINGS

SAN ANGELO ISD DISTRICT WIDE PAGING PROJECT
D-SAN-1003-01
E. ASCE 7 American Society of Civil Engineers, Minimum Design Loads for Buildings and
Other Structures
F. International Code Council-Evaluation Services - AC 156 Acceptance Criteria for Seismic
Qualification Testing of Non-structural Components
G. International Code Council-Evaluation Services Report - Seismic Engineer Report
1. ESR 1308 - Armstrong Suspension Systems
H. International Association of Plumbing and Mechanical Officials - Seismic Engineer Report
1. 0244 - Armstrong Single Span Suspension System
I. California Department of Public Health CDPH/EHLB/Standard Method v1.2 2017
J. LEED - Leadership in Energy and Environmental Design is a set of rating systems for the
design, construction, operation, and maintenance of green buildings.
K. International Well Building Standard
L. Mindful Materials
M. Living Building Challenge
N. U.S. Department of Agriculture BioPreferred program (USDA BioPreferred).
O. Clean Rooms up to ISO Class 5 (Class 100)
1.4 SUBMITTALS
A. Product Data: Submit manufacturer's technical data for each type of acoustical ceiling unit
and suspension system required.
B. Samples: Minimum 6-inch x 6-inch samples of specified acoustical panel; 8-inch-long
samples of exposed wall molding and suspension system, including main runner and 4-foot
cross tees.
C. Shop Drawings: Layout and details of acoustical ceilings show locations of items that are to
be coordinated with or supported by the ceilings.
D. Acoustical Certifications: Manufacturer's certifications that products comply with specified
requirements, including laboratory reports showing compliance with specified tests and
standards. For acoustical performance, each carton of material must carry an approved
independent laboratory classification, such as Underwriter's Laboratory (UL), of NRC,
CAC, and AC.
1. If the material supplied by the acoustical subcontractor does not have an
independent laboratory classification of acoustical performance on every carton,
subcontractor shall be required to send material from every production run
appearing on the job to an independent or NVLAP approved laboratory for testing, at
the architect's or owner's discretion. All products not conforming to manufacturer's
current published values must be removed, disposed of, and replaced with
complying product at the expense of the Contractor performing the work.
1.5 QUALITY ASSURANCE
A. Single-Source Responsibility: Provide acoustical panel units and grid components by a
single manufacturer to ensure fit and function.
B. Installer Qualifications: Company specializing in performing specified work type, a
minimum of three years of documented experience, and approved by the manufacturer.
C. Fire Performance Characteristics: Identify acoustical ceiling components with appropriate
markings of applicable testing and inspecting organization.
D. Surface Burning Characteristics: Tested per ASTM E 84 and complying with ASTM E 1264
Classification.
1.6 DELIVERY, STORAGE AND HANDLING
CRUX TECHNOLOGY & SECURITY SOLUTIONS 09 5113 - 2
ACOUSTIC PANEL CEILINGS

SAN ANGELO ISD DISTRICT WIDE PAGING PROJECT
D-SAN-1003-01
A. Deliver acoustical ceiling units to project site in original, unopened packages and store
them in a fully enclosed space where they will be protected against damage from moisture,
direct sunlight, surface contamination, and other causes.
B. Before installing acoustical ceiling units, permit them to reach room temperature and a
stabilized moisture content.
C. Handle acoustical ceiling units carefully to avoid chipping edges or damaging units in any
way.
1.7 WARRANTY
A. Acoustical Panel: Submit a written warranty executed by the manufacturer, agreeing to
repair or replace panels that fail within the warranty period. Failures include, but are not
limited to the following:
1. Acoustical Panels with HumiGuard(R) Max and HumiGuard(R) Plus performance:
sagging and warping
2. Acoustical panels with BioBlock(R) performance: growth of mold and mildew
3. Grid System: rusting and manufacturer's defects.
B. Warranty Period:
1. Ceiling System: Thirty (30) years from date of substantial completion
2. The Warranty shall not deprive the Owner of other rights the Owner may have under
other provisions of the Contract Documents and will be in addition to and run
concurrent with other warranties made by the Contractor under the requirements of
the Contract Documents.
1.8 MAINTENANCE
A. Extra Materials: Deliver extra materials to Owner. Furnish extra materials described below
that match products installed. Packaged with protective covering for storage and identified
with appropriate labels.
1. Acoustical Ceiling Units: Furnish quality of full-size units equal to 5.0 percent of
amount installed.
2. Exposed Suspension System Components: Furnish quantity of each exposed
suspension component equal to 2.0 percent of amount installed.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Ceiling Panels:
1. Armstrong World Industries, Inc.
2.2 ACOUSTICAL CEILING UNITS
A. Acoustical Panel Ceilings
1. Surface Texture: Medium Texture
2. Composition: Mineral Fiber
3. Color: White
4. Size: 20 in x 60 in, 24 in x 24 in, 24 in x 48 in, 24 in x 60 in
5. Edge Profile: Angled Tegular, Beveled Tegular, Square Lay-in
6. Noise Reduction Coefficient (NRC) ASTM C 423 Classified w/ UL label on product
carton: 0.55
7. Ceiling Attenuation Class (CAC): ASTM E1414/E1414M; Classified with UL label on
product carton: 33, 35, 40.
CRUX TECHNOLOGY & SECURITY SOLUTIONS 09 5113 - 3
ACOUSTIC PANEL CEILINGS

SAN ANGELO ISD DISTRICT WIDE PAGING PROJECT
D-SAN-1003-01
8. Flame Spread: ASTM E 1264; Class A
9. Light Reflectance (LR) White Panel: ASTM E 1477; 0.80
10. Dimensional Stability: Standard
11. Recycle Content: Up to 43% recycled total content. (Total recycled content: pre-
consumer, post-consumer and post-industrial)
12. Material Ingredient Transparency: Health Product Declaration (HPD); Declare Label
13. Life Cycle Assessment: Third Party Certified Environmental Product Declaration
(EPD)
14. Indoor Air Quality Certified to SCS-105 v4.2-2023.
15. Contractor is responsible for confirming compatibility with the existing grid
suspension system at each building.
16. Acceptable Manufacturers:
a) Armstrong World Industries CORTEGA Model 769 (2' x 4')
b) Armstrong World Industries Model 933 (2' x 4')
c) Armstrong World Industries Model 2210 (2' x 2')
2.3 METAL SUSPENSION SYSTEMS
A. Contractor shall provide new ceiling tiles that are compatible with existing suspension
system.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Do not proceed with installation until all wet work such as concrete, terrazzo, plastering
and painting has been completed and thoroughly dried out, unless expressly permitted by
manufacturer's printed recommendations. (Exception: HumiGuard Max Ceilings)
3.2 PREPARATION
A. Measure each ceiling area and establish layout of acoustical units to balance border widths
at opposite edges of each ceiling. Avoid use of less than half width units at borders and
comply with reflected ceiling plans. Coordinate panel layout with mechanical and electrical
fixtures.
B. Coordination: Furnish layouts for preset inserts, clips, and other ceiling anchors whose
installation is specified in other sections.
1. Furnish concrete inserts and similar devices to other trades for installation well in
advance of time needed for coordination of other work.
3.3 INSTALLATION
A. Follow manufacturer installation instructions.
B. Install suspension system and panels in accordance with the manufacturer's instructions,
and in compliance with ASTM C 636 and with the authorities having jurisdiction.
C. Suspend main beam from overhead construction with hanger wires spaced 4 feet on
center along the length of the main runner. Install hanger wires plumb and straight.
D. Install wall moldings at intersection of suspended ceiling and vertical surfaces. Miter
corners where wall moldings intersect or install corner caps.
E. For reveal edge panels: Cut and reveal or rabbet edges of ceiling panels at border areas
and vertical surfaces.
CRUX TECHNOLOGY & SECURITY SOLUTIONS 09 5113 - 4
ACOUSTIC PANEL CEILINGS

SAN ANGELO ISD DISTRICT WIDE PAGING PROJECT
D-SAN-1003-01
F. Install acoustical panels in coordination with suspended system, with edges resting on
flanges of main runner and cross tees. Cut and fit panels neatly against abutting surfaces.
Support edges by wall moldings.
3.4 ADJUSTING AND CLEANING
A. Replace damaged and broken panels.
B. Clean exposed surfaces of acoustical ceilings, including trim, edge moldings, and
suspension members. Comply with manufacturer's instructions for cleaning and touch up
of minor finish damage. Remove any ceiling products that cannot be successfully cleaned
and or repaired. Replace with attic stock or new product to eliminate evidence of damage.
END OF SECTION
CRUX TECHNOLOGY & SECURITY SOLUTIONS 09 5113 - 5
ACOUSTIC PANEL CEILINGS

This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Bid Information Type SJRA - Request for Qualifications Status Issued Number 26-0037 (Professional

City of College Station

Bid Due: 7/30/2026

Strategic Planning Services Follow Solicitation Solicitation ID: 808-26-262159 Status: Posted Contact Name: Michael-

State Government of Texas

Bid Due: 8/04/2026

RFP for Shorthand Reporter and Court Reporter Examinations Solicitation ID: 212-26-0731 Due Date:

State Government of Texas

Bid Due: 7/31/2026

Real Estate Appraisal, Brokerage, and Advisory Services Solicitation ID: UTD20260611-TB Due Date: 8/3/2026

State Government of Texas

Bid Due: 8/03/2026