MUNICIPALITY OF ANCHORAGE
MAINTENANCE AND OPERATIONS DEPARTMENT
CAPITAL PROJECTS
MOA DIMOND HIGH SCHOOL POOL WATER HEATER REPLACEMENT
TABLE OF CONTENTS
DIVISION 00 – BIDDING REQUIREMENTS AND CONDITIONS OF THE CONTRACT
Section
No. Pages
00 01 00 Cover Page ........................................................................................................ 1
00 01 10 Table of Contents.............................................................................................. 1
00 01 15 List of Drawings................................................................................................. 1
00 11 16 Invitation to Bid................................................................................................. 2
00 21 13 Bidder Checklist & Responsible Bidder Questionnaire..................................... 4
00 41 13 Bid Proposal ...................................................................................................... 2
00 43 13 Bid Bond ............................................................................................................ 1
00 52 13 Contract ............................................................................................................ 4
00 61 13 Contract Performance and Payment Bond....................................................... 2
00 62 16 Certificate of Insurance..................................................................................... 3
00 65 13 Certificate of Compliance ................................................................................. 1
00 72 13 General Conditions ......................................................................................... 60
00 73 00 Supplementary Conditions ............................................................................... 2
00 73 36 Equal Opportunity Special Provisions ............................................................... 1
00 73 46 State of Alaska Labors & Mechanics Minimum Rates ...................................... 1
00 01 10
LIST OF DRAWINGS
GENERAL
T001
Title Sheet
MECHANICAL
M001
M002
M003
M101
M102
M201
M202
M301
M302
Mechanical Legend, Abbreviations, and Schedules
Mechanical Specifications
Mechanical Specifications
Piping Demolition Plan
Ventilation Demolition Plan
Piping Remodel Plan
Ventilation Remodel Plan
Demolition Schematics
Remodel Schematics
ELECTRICAL
E001
E002
E101
E201
Electrical Legend, Power One-Line and Panel Schedule
Electrical Specifications
Electrical Demolition Plan
Electrical Remodel Plan
00 01 15
MUNICIPALITY OF ANCHORAGE
PURCHASING DEPARTMENT
Invitation to Bid
No. 2024C066
Sealed bids will be received in accordance with the time schedule shown below by the
Municipality of Anchorage at the Purchasing Department, 632 W. 6th Ave., Suite 520,
Anchorage, Alaska 99501 for:
DIMOND HIGH SCHOOL POOL WATER HEATER REPLACEMENT
The Work that is presented in the Bid Proposal for this Contract consists of the
demolition of (2) existing Hot Water heaters, (1) Hot Water Storage Tank, and Installing
(3) New Intellihot iN501 On-Demand Hot Water Heaters with associated piping and
electrical.
ESTIMATED CONSTRUCTION COST: Between: $50,001 - $500,000
Site Visit:
10:00 A.M. Local Time, November 5, 2024
2909 W 88th Avenue, Anchorage AK 99502
Meet outside the pool entrance before site visit.
Pre-Bid Conference:
N-A
Questions Due:
12:00 P.M. Local Time, November 7, 2024
Bid Opening:
1:30 P.M. Local Time, November 14, 2024
All Pre-Bid Conferences and/or Bid Openings may be attended in person or via conference
call at this number (907) 343-6089. You may call in five (5) minutes before any scheduled
conference. EMAILED BIDS WILL NOT BE ACCEPTED.
ALL QUESTIONS SHALL BE SUBMITTED PRIOR TO THE QUESTION DUE DATE THIS
WILL BE THE FINAL OPPORTUNITY TO ASK QUESTIONS OR REQUEST
CLARIFICATIONS.
Requests for interpretation or clarification of the bidding Documents shall be made in
writing to the Purchasing Office (wwpur@muni.org). Please reference the Invitation to Bid
Number & Project Title. Do not contact the specified department directly.
To maintain the project schedule, Interpretations, corrections, or changes to the Bidding
Documents shall be made by Addendum and shall not be binding unless included in the
Addendum. It is your responsibility to periodically check the website for addenda.
Page 1 of 2