DG01--NextGEN Infrastructure Upgrades
| Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Aug 19, 2026 |
| Due Date: | Aug 28, 2026 |
| Solicitation No: | 36C24126Q0644 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
- Updated Published Date: Aug 19, 2026 06:57 am EDT
- Original Published Date: Aug 03, 2026 07:33 pm EDT
- Updated Date Offers Due: Aug 28, 2026 05:00 pm EDT
- Original Date Offers Due: Aug 20, 2026 05:00 pm EDT
- Inactive Policy: Manual
- Updated Inactive Date: Oct 27, 2026
- Original Inactive Date: Sep 19, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: DG01 - IT AND TELECOM - NETWORK SUPPORT SERVICES (LABOR)
-
NAICS Code:
- 238210 - Electrical Contractors and Other Wiring Installation Contractors
-
Place of Performance:
West Haven VAMC West Haven , 06516USA
Site Visit information: Site visit will be held on Friday, 21 August 2026 at 1:00 PM EST located at the West Haven VAMC. Please contact Peter Sandor directly (peter.sandor@va.gov; (203) 932-5711 Ext. 3152) to schedule attendance at West Haven VAMC. Please note all questions must be submitted to Shawn Lawrence (Shawn.Lawrence@va.gov), prior to Tuesday 25 August 2026 at 3:00 PM EST. No questions will be answered at the site visit. RFIs
Will the Government host a site visit or walkthrough prior to the response date? Conduit routing, run lengths, and mounting conditions are the primary cost drivers on this effort, and a brief escorted walkthrough of the 12 locations would allow quoters to price accurately.
A site visit has been added to the solicitation.
CLINs 0001 and 0003 and Section 3.3 reference "10 locations," but the CLIN quantities are 12 each and the location table in Section 3.3 lists 12 rows. Please confirm the full scope is 12 locations and the CLIN quantities of 12 govern.
There are 12 locations in total. Section 3.3 has been updated.
Will the Government provide drawings, approximate conduit run lengths, or distances from each IT closet to the corresponding AP location? If not, the site visit in question 1 becomes essential for responsible fixed pricing.
A site visit has been added to the solicitation.
Please describe ceiling and mounting heights at the AP locations, particularly the sub-ground, basement, and mechanical-type spaces in Buildings 1, 5, and 24. Are there locations that will require powered lifts, and if so, are lifts able to reach those areas (elevator access and floor loading for upper floors such as Building 1, Level 9)?
Do not expect ceiling heights of no more than 8 Section 3.7 includes Attachment C, VA Newington Campus Map, while Section 3.3 states all work is at the West Haven VAMC. Please confirm there is no work at the Newington campus under this contract.
Newington Map removed.
What working hours apply? Specifically, will above-ceiling work in patient care areas be permitted during normal business hours, or should quoters anticipate evening or weekend work? Please also confirm whether ICRA or other infection control permitting will be required for above-ceiling activities.
ICRA carts will be required in common spaces. Vendor is required to provide ICRA cart.
Can contractor personnel vetting and badging under VA Directive 0710 begin immediately at award, and does the Government anticipate the 30-day period of performance accounting for background investigation processing time?
Yes, Vetting and badging will start at time of award. Do to access to IT equipment and spaces the full PIV will need to be acquired prior to initial work performance.
Section 5.2 references reconciliation of a "Profit-figure anomaly noted in the Drafter's Note," but no Drafter's Note is included in the solicitation. Please clarify or confirm this reference does not apply.
Reference removed. Section 5.2 has been updated. Â
- ONE VA CENTER
- TOGUS , ME 04330
- USA
- Shawn Lawrence
- Shawn.Lawrence@va.gov
- Phone Number 203-932-5711
- Aug 19, 2026 06:57 am EDTCombined Synopsis/Solicitation (Updated)
- Aug 19, 2026 06:43 am EDT Combined Synopsis/Solicitation (Updated)
- Aug 05, 2026 02:48 pm EDT Combined Synopsis/Solicitation (Updated)
- Aug 05, 2026 02:47 pm EDT Combined Synopsis/Solicitation (Updated)
- Aug 03, 2026 07:33 pm EDT Combined Synopsis/Solicitation (Original)
Related Document
| Aug 3, 2026 | [Combined Synopsis/Solicitation (Original)] DG01--NextGEN Infrastructure Upgrades - COMM TEAM 2 |
| Aug 5, 2026 | [Combined Synopsis/Solicitation (Updated)] DG01--NextGEN Infrastructure Upgrades |
| Aug 31, 2026 | [Combined Synopsis/Solicitation (Updated)] DG01--NextGEN Infrastructure Upgrades |
See Also
Follow RFQ: Requirement to reaward a 50MB commercial lease Intra-SWA. Active Contract Opportunity
DEPT OF DEFENSE
Due by 9/28/2026
Follow D--S&P Global Ratings Direct Subscription Active Contract Opportunity Notice ID 140D0426Q0886 Related
INTERIOR, DEPARTMENT OF THE
Due by 9/15/2026
Follow PROVIDE, INSTALL, AND MAINTAIN A 10GB, NON-SWITCHED, ETHERNET CIRCUIT BETWEEN MA AND
DEPT OF DEFENSE
Due by 9/30/2026
Follow PROVIDE, INSTALL, AND MAINTAIN A 10GB, NON-SWITCHED, ETHERNET CIRCUIT BETWEEN MA AND
DEPT OF DEFENSE
Due by 9/30/2026