DFCM Construction - Invitational - Dixie Technical College- DXTECH- Masonry Repair - Project #26073290
| Agency: | State Government of Utah |
|---|---|
| State: | Utah |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Apr 16, 2026 |
| Due Date: | May 7, 2026 |
| Solicitation No: | CR26060 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project Description: INVITATIONAL
Only invited contractors listed below are allowed to attend the mandatory meeting.
Big D, judd.bundy@big-d.co
Caliber Contractor, office@calibercontractorut.com
New Wave Construction, ben@newwaveconstruction.com
PRT Builders, rob@prtbuilders.com
The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the construction of the referenced project:
Project Description: New metal panel façade installed on existing framing with new structural connections (REF. AE205, AE510, AE511, SW501) New metal panel soffit installed on existing framing (REF. AE510, AE511, SW501) Replacement of all cast stone elements identified in drawings or identified through inspections with new wall mounting as detailed in AE502/C5. Provide allowance for replacement of up to 10% of the 1,200 LF of cast stone header and sill profiles. Replace delaminated cast stone header above window shown on AE206. Clean surface of all debris and adhere new header per manufacturers recommendation using dryvit systems inc., Primus adhesive or equivalent.
Construction Cost Estimate:$136,783.00
See Also
Project: DFCM Construction - Prequalified Electrical Stage II - Department of Corrections -
State Government of Utah
Due by 9/28/2026
Project: Replace Flume/Auto Dump and JSL Canal Enclosure at Millcreek Ref. #: 5129246--
State Government of Utah
Due by 9/23/2026
Project: Natural Surface Trail Construction Ref. #: DF26-34 Department: COUNTIES - Tooele County
State Government of Utah
Due by 9/29/2026
Project: DFCM Construction - Prequalified General Stage II - DOC - CUCF Visiting
State Government of Utah
Due by 10/22/2026