Design Services - Lake Park Improvements & Flow Way Restoration
| Agency: | Collier County |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Oct 8, 2026 |
| Due Date: | Nov 10, 2026 |
| Solicitation No: | 26-8688 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID: 26-8688
Title: Design Services - Lake Park Improvements & Flow Way Restoration
Addenda: 0
Release Date: 10/8/2026
Due Date: 11/10/2026
Post Information
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Summary
As requested by the Transportation Management Services Division (hereinafter, the “Division or Department”), the Collier County Board of County Commissioners Procurement Services Division (hereinafter, “County”) has issued this Request for Professional Services (hereinafter, “RPS”) with the intent of obtaining proposals from interested and qualified Proposers in accordance with the terms, conditions and specifications stated herein, in the Solicitation and/or attachments.
Background
The Lake Park neighborhood, located south of US-41 in Collier County, experiences recurring flooding due to aging and underperforming stormwater infrastructure, limited conveyance capacity, and hydraulic constraints within the existing drainage system. These conditions have resulted in periodic flooding of roadways and residential properties during significant rainfall events. To evaluate potential solutions, the County commissioned the 2023 Lake Park Boulevard Area Improvements & Flow Way Restoration Pre-Design Study. The study assessed increasingly complex scenarios for stormwater and infrastructure improvements, including the addition and upsizing of stormwater conveyance pipes, installation of water control structures, wetland restoration and enhancement, roadway elevation modifications, roadway widening, and sidewalk improvements.
The study evaluated alternatives intended to improve stormwater conveyance, reduce flooding, enhance water quality, restore hydraulic connectivity, and improve the overall resiliency of the drainage system within the project area. Based on the findings of the study, conceptual recommendations were developed for future implementation. The County now seeks professional engineering services to advance the project through engineering design, permitting and construction. The selected Consultant shall independently evaluate the recommendations of the Pre-Design Study, available project information, and existing conditions and shall be responsible for developing and supporting its own engineering analyses, recommendations and design and prepare the engineering, permitting, and construction documents necessary to implement the improvements ultimately approved by the County.
Timeline
3295 Tamiami Trail East, Bldg. C-2
Conference Room A
Naples, FL 34112
See Also
Title Underground Utility Locating Services Solicitation Type ITB Status Active Buyer Melissa Pierce
City of Jacksonville
Due by 11/16/2026
Districtwide Environmental Compliance Monitoring Services RFP-DOT-07/08-6098DS Original Competitive Solicitation
State Government of Florida
Due by 7/08/2060
Advertisement Detail Department of Transportation Informational Notice REVISED TIMELINE (3/10/2011) - SOUTH FLORIDA
State Government of Florida
Due by 10/11/2040
Description: Palm Beach County Vista Center Expansion Department: Purchasing Buyer: Christal Bakie Solicitation
Palm Beach County
Due by 3/25/2029