Design of Quiet Zone Improvements at Churchill Avenue, Meadow Drive, and Charleston Road crossings

Agency: City of Palo Alto
State: California
Type of Government: State & Local
NAICS Category:
  • 237310 - Highway, Street, and Bridge Construction
  • 237990 - Other Heavy and Civil Engineering Construction
Posted Date: May 20, 2026
Due Date: Jun 10, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page


Project ID:

Title: Design of Quiet Zone Improvements at Churchill Avenue, Meadow Drive, and Charleston Road crossings

Addenda: 1

Release Date: 4/28/2026

Due Date: 6/10/2026

Follow
Design of Quiet Zone Improvements at Churchill Avenue, Meadow Drive, and Charleston Road crossings
Last updated by Addendum #1 on May 21, 2026 2:36 AM
Request For Proposal
Transportation
91158
Project ID: RFP196802
Release Date: Tuesday, April 28, 2026
· Due Date: Wednesday, June 10, 2026 3:00pm
Posted Tuesday, April 28, 2026 2:16pm
All dates & times in Pacific Time
Draft Response No Bid20 days, 20 hours, 51 minutes


Post Information

Posted At:Tue, Apr 28, 2026 2:16 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

The City of Palo Alto is soliciting proposals from qualified design and engineering professionals to provide Plans, Specifications, and Engineer’s Estimates (PS&E) for the construction of Quiet Zone improvements at three existing at-grade railroad crossings along the Peninsula Corridor Joint Powers Board (PCJPB), also known as Caltrain. The proposed Quiet Zone will ultimately include all four at-grade rail crossings within the City.

The scope of services includes preparation of construction documents, technical specifications, and cost estimates, as well as coordination and securing required approvals from the California Public Utilities Commission (CPUC), Federal Railroad Administration (FRA), PCJPB/Caltrain, and Union Pacific Railroad, as applicable, for the establishment or amendment of a Quiet Zone.

Consultant Qualifications

The preferred Consultant team shall demonstrate experience and expertise in the following areas:

  • Rail corridor and at-grade crossing design
  • Railroad signal timing, preemption, and interconnect systems including Positive Train Control (PTC) and wireless crossing systems
  • Design of railroad improvements, including gate arms, signal equipment, signal cabinets, and interconnections
  • Civil engineering design related to roadway, pedestrian, and utility improvements
  • Community outreach, stakeholder coordination, and public meeting facilitation


Background

Background:

The City of Palo Alto is soliciting proposals from qualified consulting firms to provide professional services for the implementation of a railroad Quiet Zone at existing at-grade crossings along the Peninsula Corridor Joint Powers Board (PCJPB), also known as Caltrain. The proposed Quiet Zone will include all four at-grade rail crossings within the City.

The City previously engaged a consultant to conduct an initial study to identify required improvements and to develop conceptual plans necessary to establish a Quiet Zone along the Caltrain corridor. This Quiet Zone study is included as Attachment A. The study identified and council approved staff to proceed with four quadrant gate systems at the following three crossings in order to establish a Quiet Zone along the entire corridor within the City:

• Churchill Avenue (USDOT No. 754998E)
• Meadow Drive (USDOT No. 755010S)
• Charleston Road (USDOT No. 755011Y)

In addition, a separate study was previously conducted in coordination with the City of Menlo Park for the at-grade crossing at Palo Alto Avenue (Alma Street) (USDOT No. 754992N). Since completion of that study, the City has designed and constructed the identified improvements and is currently in the final stages of Quiet Zone implementation at this crossing. Improvements at this location primarily included installation of a non-traversable median island, signage, and pavement striping. The improvement plans for this effort are included as Attachment B.



Timeline

Release Project Date:
April 28, 2026
Question Submission Deadline:
May 13, 2026, 1:00pm
Proposal Submission Deadline:
June 10, 2026, 3:00pm
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

TOS No. 25-005 - Phase II of Engine Company 23 Junior Arts Center

City of Los Angeles

Bid Due: 8/28/2026

Bid Title: Riverford Roundabout Water Facilities Relocation Project Category: Engineering - RFPs Status:

Padre Dam Municipal Water District

Bid Due: 7/30/2026

Bid Title: RFP: Design - ORH Complete Streets - Arata to Windsor Rd

Town of Windsor, CA

Bid Due: 8/06/2026

GCS-I10636-S - Energy Efficiency Project Services Master Agreement (EEPMA) Request for Statement of

City of Los Angeles

Bid Due: 7/02/2028