Design - Harborview Road Lift Stations, Gravity Sewers and Force Mains

Agency: Charlotte County
State: Florida
Type of Government: State & Local
NAICS Category:
  • 237110 - Water and Sewer Line and Related Structures Construction
Posted Date: Oct 5, 2026
Due Date: Oct 7, 2026
Solicitation No: 26-664
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

File No:

26-664
Description:

Design - Harborview Road Lift Stations, Gravity Sewers and Force Mains
Contact:

rhiannon.mills@charlottecountyfl.gov
File number:

20260664
Due Date:
10/7/2026 3:00:00 PM
Notice:
Package:
Registered Vendors Notified:
Presubmittal Sign-in:
Tabulation:
Recommendation:
Addendum:
Commodity Codes:

90600, 90680, 90700, 90740, 91800, 91832, 91842, 91897, 92500, 92517, 92522, 92528, 92533, 92583, 92587, 92596, 92597

Attachment Preview

PURCHASING DIVISION
Charlotte County Administration Center
18500 Murdock Circle, Suite 344
Port Charlotte, Florida 33948-1094
Phone 941.743.1378
Fax 941.743.1384
TO: PROSPECTIVE PROPOSERS
DATE: OCTOBER 5, 2026 PROPOSAL DUE DATE: 3:00 p.m. (EST), OCTOBER 7, 2026
RE: ADDENDUM #4, RFP NO. 20260664, DESIGN - HARBORVIEW ROAD LIFT STATIONS, GRAVITY
SEWERS AND FOR2CE MAINS
Firms are hereby notified that this addendum shall be made as part of the above-named proposal and contract documents.
The following are issued to revise/clarify the proposal and contract documents, and these items shall have the same force and
effect as the original proposal and contract documents. Proposals to be submitted on the above-specified date at Purchasing
shall conform to the revisions and clarifications as listed herein.
ITEM # 1 QUESTIONS/ANSWERS
Q1: Addendum No. 3, Question 3, clarifies that the 24-month schedule is for design, permitting, and
preparation of the bid package for the Northshore Terrace lift station. Please confirm the County's intended
overall project schedule as follows:
1. The 270-calendar-day milestone, measured from Notice to Proceed, includes completion of design, County
approvals, permitting, and bid-ready documents for the Pine Court and Date Street lift stations and their
associated gravity sewers and force mains.
2. The 24-month milestone, also measured from Notice to Proceed, includes completion of design, County
approvals, permitting, and bid-ready documents for the Northshore Terrace lift station and all remaining
project components not included in the initial 270-day package.
3. Construction completion is not required within either the 270-calendar-day or 24-month milestone.
A1: The understanding is correct.
Q2: RP-20 requires the consultant to coordinate with the gravity sewer and force main being installed as part
of the Harborview Road widening project, and RP-21 states that those facilities will connect to the lift
stations, gravity sewers, and force mains designed under this RFP. Please confirm that the gravity sewer and
force main located within the Harborview Road widening limits are being designed under the separate
Harborview Road project and are not part of the design scope of RFP No. 20260664, except for coordination
and required connection/interface design. If any portions of the gravity sewer or force main within
Harborview Road are to be designed under this RFP, please identify the limits of that work.
A2: RP-20 and RP-21 are clear on what the responsibility is of the selected firm. Coordination of the connection to
the gravity sewer and force main being designed as part of the Harborview Road widening project may require design
adjustments within the limits of the future Harborview Road right-of-way.
This addendum is binding and is to be considered as if contained within the original proposal documents of RFP
No. 20260664. Firms are required to acknowledge receipt of this addendum on their proposal forms.
Kimberly A. Corbett, C.P.M., CPPB
Senior Division Manager - Purchasing
KAC/rm
cc: Professional Services Committee
Clerk
File

This page summarizes the opportunity, including an overview and a preview of the attached documents.
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

The scope of work for ECEP Cooling Tower Basin Improvements includes, but is

State Government of Florida

Due by 10/26/2026

Project ID: Title: Camping World Stadium Converged Network System (CNS) Design and Installation

City of Orlando

Due by 10/27/2026

RFQ 26-81 Architectural Continuing Design-Build Services

Fort Pierce Utilities Authority

Due by 11/09/2026

Bid Information Type Invitation to Bid - Construction Status Issued Number B260290DWJ (North

Lee County

Due by 10/29/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.