Design Build-Western NC School for the Deaf-Morganton Campus-RE-ADVERTISEMENT

Agency: State Government of North Carolina
State: North Carolina
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
Posted Date: Jan 13, 2026
Due Date: Jan 22, 2026
Solicitation No: SCO-SCO-NCSD-Campus Infrastructure-1
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Solicitation Number: SCO-SCO-NCSD-Campus Infrastructure-1
Project Title: Design Build-Western NC School for the Deaf-Morganton Campus-RE-ADVERTISEMENT
Description: Re-Advertisement for Campus Infrastructure
Opening Date: 1/22/2026 3:00 PM
Posted Date: 1/14/2026
Status: Open
Department: STATE OF NC - CONSTRUCTION OFFICE
Solicitation Number
*
SCO-SCO-NCSD-Campus Infrastructure-1
Department
STATE OF NC - CONSTRUCTION OFFICE
Status Reason
Open
Opening Date
2026-01-22T15:00:00.0000000
Posted Date
*
2026-01-13T18:29:56.0000000Z
Commodity Code
Construction Services
Mandatory Conference/Site Visit
Special Instructions
Sealed qualifications for the Campus Infrastructure Project may be delivered via UPS / Fed Ex, or may be received in person, at Muter Construction, 111 E. Vance St., Zebulon, NC 27597, Attn: Ryan Strickland, until but no later than 3:00 PM, local prevailing time, January 22, 2026. (Packages may be sent electronically to rstrickland@muterconstruction.com)
Solicitation Type
*
Select RFP IFB RFI
Owner
Shahgol Mostashari
Description
Re-Advertisement for Campus Infrastructure
Attachments

Attachment Preview

DESIGN-BUILD: REQUEST FOR QUALIFICATIONS (RFQ) ADVERTISEMENT FOR OWNER
Adopted by the State Building Commission on June 25, 2019
Amended by the State Construction Office August 8, 2022
Department/Agency
Project Title
Scope of Work
NC School for the Deaf Morganton Campus
Campus Infrastructure
The project consists of demolishing an abandoned water tower and
the associated underground water piping back to the existing valve
and capping. New life safety infrastructure will need to be installed
for the Main Building Kitchen and Dining Area to provide adequate
water pressure for the sprinkler system. The project will also
consist of installing a new campus generator to the electrical
infrastructure to provide adequate emergency power to the
dormitories, kitchen, and central utility plant. The project will also
consist of multiple roof replacements based on a roofing study that
was completed in December 2022.
*Muter Construction is the Owner Representative and is not the
contractor for the project*
Project Site
Schedule
Contact
Telephone
Email
Total Project Budget
Source of Funds
This design build project is to be delivered on the campus of the
North Carolina School for the Deaf in Morganton, NC.
https://maps.app.goo.gl/P1czcLD9N89mrVZbA
Project delivery will be phased with multiple completion dates
Ryan Strickland Owner Representative
252-567-8608
rstrickland@muterconstruction.com
$7,700,000
SCIF R&R Funds
Hurricane Helene Funding
Page 1 of 4
Approved OC-25 #
Publish Date
Closing Date
N/A
4 December 2025
6 January 2026 @ 3:00 PM deadline
New Closing Date
22 January 2026 @ 3:00 PM deadline
Interviews
Only if deemed necessary by governmental body
Submit ONE (1) copy of
qualifications information
package, with entire package
contents (Mailing Address):
Physical Location for
Fed Ex/UPS delivery
(Delivery Address):
Muter Construction
111 E. Vance St.
Zebulon, NC 27597
(Packages may be sent electronically to rstrickland@muterconstruction.com)
Muter Construction
111 E. Vance St.
Zebulon, NC 27597
Sealed qualifications for the Campus Infrastructure Project may be
delivered via UPS / Fed Ex, or may be received in person, at Muter
Construction, 111 E. Vance St., Zebulon, NC 27597, Attn: Ryan
Strickland, until but no later than 3:00 PM, local prevailing time, January
22, 2026.
(Packages may be sent electronically to rstrickland@muterconstruction.com)
In order to offer CONSTRUCTION Services (General Contracting, Electrical
Contracting, Plumbing, Heating and Fire Sprinkler Contracting, or
Landscape Contracting) and DESIGN Services (Architecture, Engineering,
or Landscape Architecture) as part of the response to this RFQ, the
proposing firms must be properly licensed to provide Construction Services
and Design Services in the State of North Carolina. More information on the
North Carolina state boards may be found at the following websites:
NC Licensing Statement
CONSTRUCTION:
NC Licensing Board for General Contractors:
(https://nclbgc.org)
NC State Board of Examiners of Electrical Contractors:
(https://www.ncbeec.org)
NC State Board of Examiners of Plumbing, Heating and Fire
Sprinkler Contractors: (https://www.nclicensing.org) NC Landscape
Contractors’ Licensing Board: (https://nclclb.com)
DESIGN:
NC Board of Architecture: (http://www.ncbarch.org) NC Board of
Examiners for Engineers and Surveyors: (http://www.ncbels.org)
NC Board of Landscape Architects: (http://www.ncbola.org)
STATE BUILDING COMMISSION - SELECTING CRITERIA for DESIGN-BUILD
In selecting the Design-Builder, the selection committee should take into consideration qualification information
expressed by the Design-Builder in a package that includes the following:
1. 10% - Profile of each key firm on the team (design-builder, contractor(s), designer(s), etc.). Include firm history,
ownership, description of services, location, staff size and record of successfully completed projects without major
legal or technical problems.
2. 10% - Resume of each key personnel represented on the team (design-builder, contractor(s), designer(s), etc.).
Identify licenses (with numbers) and qualifications.
Page 2 of 4
3. 10% - Examples of experience in each of these areas:
a. Projects with scope similar to proposed project, successfully completed by team members (firms and/or
personnel).
b. Design-Build projects successfully delivered by team members (firms and/or personnel).
c. Collaboration between team members (firm and/or personnel).
4. 10% - Examples of recent experience with estimating project cost. Include examples of design-build projects with
comparison between initial design-build estimate and final cost.
5. 10% - Examples of recent experience with adhering to project schedules. Include examples of design-build projects
with comparison between initial schedule and final delivery date.
6. 10% - Understanding of the project location as exhibited by past experience in the geographic area and/or with the
client. Indicate team’s proximity to the project area.
7. 10% - Quantifiable description of current workload and available resources to successfully complete this project.
8. 10% - Description, with examples if applicable, of process for successfully delivering this proposed project. Address
each phase of project (design, pre-construction and construction). Include explanation of project team selection;
practices and procedures to ensure quality; and other factors that may be applicable. North Carolina School of the Deaf
in Morganton has selected the following option for team selection:
§ 143-128.1A.c.8.a.
a. A list of the licensed contractors, licensed subcontractors, and licensed design professionals whom the design-
builder proposes to use for the project's design and construction. If this project team selection option is used, the
design-builder may self-perform some or all of the work with employees of the designbuilder and, without
bidding, also enter into negotiated subcontracts to perform some or all of the work with subcontractors, including,
but not exclusively with, those identified in the list. In submitting its list, the design-builder may, but is not
required to, include one or more unlicensed subcontractors the designbuilder proposes to use. If this project team
selection option is used, the design-builder may, at its election and with or without the use of negotiated
subcontracts, accept bids for the selection of one or more of its first-tier subcontractors.
9. 10% - Certifications:
a. A letter, dated within the last 30 days, from your surety company, signed by their Attorney in Fact, verifying their
willingness to issue sufficient payment and performance bonds for this project, on behalf of your firms or its agent
licensed to do business in North Carolina, and verifying your company’s capability and capacity based on your
current value of work. Surety company bond rating shall be rated “A” or better under the A.M. Best Rating system
or The Federal Treasury List.
b. HUB Participation: Describe the program (plan) that your company has developed to encourage participation by
HUB firms to meet or exceed the goals set by North Carolina General Statute 143-128.2. Please explain how the
firm will address minority participation in the management levels of the company. Include a HUB plan in the
proposal. Provide documentation of HUB participation that the firm achieved over the past three (3) years on both
public and private construction projects. Outline specific outreach efforts that your firm will take to notify HUB
firms of opportunities for participation. Indicate the minority participation goal that you expect to achieve on the
project.
c. Written certification by the design-builder that each licensed design professional included as part of the team was
selected based solely on qualifications without regard to fee. Include evidence that a qualifications-based
selection (QBS) process was utilized.
10. 10% - Additional information as requested by the Owner or deemed appropriate by the Design-Builder.
Page 3 of 4
APPENDIX A
Current NCSD Campus Map
Page 4 of 4
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Follow Design-Bid-Build (DBB) SOF Marine Raider Facilities Complex, Marine Corps Base (MCB) Camp

DEPT OF DEFENSE

Bid Due: 6/29/2026

Follow Infantry Platoon Battle Course (IPBC) Fort Bragg, North Carolina Active Contract Opportunity

DEPT OF DEFENSE

Bid Due: 6/15/2026

DESIGN-BUILD (DB) BARRACKS INITIATIVE (PACKAGE #1), MARINE CORPS AIR STATION (MCAS) CHERRY POINT,

Federal Agency

Institution Winston-Salem State University Institution URL for Additional Information about this Project (Optional)

North Carolina State University

Bid Due: 6/10/2026