Design-Build Sitka Waterfront Improvements (Sitka, AK)
| Agency: | HOMELAND SECURITY, DEPARTMENT OF |
|---|---|
| State: | Alaska |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | May 12, 2025 |
| Due Date: | May 15, 2025 |
| Solicitation No: | 70Z05025R43000002 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: May 12, 2025 01:47 pm PDT
- Original Published Date: Mar 12, 2025 02:12 pm PDT
- Updated Date Offers Due: May 15, 2025 04:00 pm PDT
- Original Date Offers Due: Apr 18, 2025 04:00 pm PDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: May 30, 2025
- Original Inactive Date: May 03, 2025
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1JZ - CONSTRUCTION OF MISCELLANEOUS BUILDINGS
-
NAICS Code:
- 236220 - Commercial and Institutional Building Construction
-
Place of Performance:
AK 99835USA
** The Solicitation is for NMACC III, Pool 1 existing contract holders **
*** The Pre-Proposal Inquiry process is closed ***
This is a new Design-Build construction services requirement to design and build a fixed Seagoing Buoy Tender (WLB) wharf and pier at USCG Sitka Mooring (Sitka, AK). This effort includes, but is not limited to, designing and constructing a new wharf with connection to shore lighting, shore tie connections and fenders. This project includes site improvements, utilities, permits, and all incidental related work.
BASE ITEM - Provide all necessary supervision, labor, materials, transportation, equipment, permitting, and other necessary ancillary services to design and construct a new fixed Seagoing Buoy Tender (WLB) wharf, a new fixed approach pier, and associated infrastructure to homeport one WLB at USCG Sitka Mooring (Sitka, AK).
OPTION ITEM 01: Design-Build Boat Bay Maintenance Facility. Provide all necessary supervision, labor, materials, transportation, equipment, permitting, and other necessary ancillary services to design and construct a new boat maintenance building and associated utility work.
OPTION ITEM 02: Design-Build Landside Sitework. Provide all necessary supervision, labor, materials, transportation, equipment, permitting and other necessary ancillary services to design and construct landside sitework such as earthwork, demolition, paving, and utilities not included in Base Item or other option items.
OPTION ITEM 03: Design-Build FRC Floating Dock and Mooring Dolphin.
A. Provide all necessary supervision, labor, materials, transportation, equipment, permitting and other necessary ancillary services to design and construct waterfront, shore facilities, and associated infrastructure necessary to homeport one Fast Response Cutter (FRC). The work includes a new FRC floating dock and new gangway.
B. Provide all necessary supervision, labor, materials, transportation, equipment, permitting and other necessary ancillary services to design and construct a mooring dolphin, connected to the WLB wharf with a catwalk as described in the Specifications,.
PERFORMANCE PERIOD: The contract performance period is 1,030 calendar days after award of Task Order for the Base Item (and optional items if awarded).
The Government contemplates a Firm-Fixed Price task order.
- 915 SECOND AVE, RM 2664
- SEATTLE , WA 98174
- USA
- Tracianne Torklep
- Tracianne.Torklep@uscg.mil
- Phone Number 571 607 1536
- Gabriel D. Perez
- gabriel.d.perez@uscg.mil
- Phone Number 571 607 1542
- May 12, 2025 01:47 pm PDTSolicitation (Updated)
- May 02, 2025 03:50 pm PDT Solicitation (Updated)
- Apr 25, 2025 02:08 pm PDT Solicitation (Updated)
- Apr 17, 2025 03:26 pm PDT Solicitation (Updated)
- Apr 11, 2025 06:17 pm PDT Solicitation (Updated)
- Apr 03, 2025 05:04 pm PDT Solicitation (Updated)
- Mar 24, 2025 01:58 pm PDT Solicitation (Updated)
- Mar 20, 2025 05:11 pm PDT Solicitation (Updated)
- Mar 13, 2025 01:30 pm PDT Solicitation (Updated)
- Mar 12, 2025 02:12 pm PDT Solicitation (Original)
Related Document
| Mar 12, 2025 | [Solicitation (Original)] Design-Build Sitka Waterfront Improvements (Sitka, AK) |
| Mar 14, 2025 | [Solicitation (Updated)] Design-Build Sitka Waterfront Improvements (Sitka, AK) |
| Mar 21, 2025 | [Solicitation (Updated)] Design-Build Sitka Waterfront Improvements (Sitka, AK) |
| Mar 24, 2025 | [Solicitation (Updated)] Design-Build Sitka Waterfront Improvements (Sitka, AK) |
| Apr 3, 2025 | [Solicitation (Updated)] Design-Build Sitka Waterfront Improvements (Sitka, AK) |
| Apr 12, 2025 | [Solicitation (Updated)] Design-Build Sitka Waterfront Improvements (Sitka, AK) |
| Apr 17, 2025 | [Solicitation (Updated)] Design-Build Sitka Waterfront Improvements (Sitka, AK) |
| Apr 25, 2025 | [Solicitation (Updated)] Design-Build Sitka Waterfront Improvements (Sitka, AK) |
| May 2, 2025 | [Solicitation (Updated)] Design-Build Sitka Waterfront Improvements (Sitka, AK) |
| Aug 20, 2025 | [Award Notice (Original)] Design-Build Sitka Waterfront Improvements (Sitka, AK) |
See Also
ITB 2027-801 URSA MAJOR ELEMENTARY SCHOOL REPLACEMENT ITB-1-DEMOLITION Click here to be added
Anchorage School District
Due by 10/01/2026
Status Ref# Project Close Date Dayes Left Action Open 2024 - 2034 Selected
ALASKA NATIVE TRIBAL HEALTH CONSORTIUM
Due by 1/01/2036
Project: On behalf of the Alutiiq Tribe of Old Harbor - site tour
ALASKA NATIVE TRIBAL HEALTH CONSORTIUM
Due by 9/28/2026
Follow SOURCES SOUGHT: JBE 089 CRH SIMULATOR FACILITY BUILDING (BRAND NAME REQUIREMENTS) Active
DEPT OF DEFENSE
Due by 9/29/2026