REQUEST FOR QUALIFICATIONS (RFQ) #761‐022726
DESIGN‐BUILD SERVICES FOR SCHOOL CONSTRUCTION AND RENOVATIONS ACROSS
ASHEBORO CITY SCHOOLS
1. GENERAL
Pursuant to N.C. Stat. Sec. 143‐64‐31, the Asheboro City Schools Board of Education, North Carolina is
seeking proposals from qualified design‐build teams interested in performing a school construction,
renovations and building system upgrades. These projects are being undertaken to help the district to
ensure the students and staff have the best learning environment possible. The intent of this RFQ is to
select a design‐build team by qualifications‐based selection to provide design, estimating, construction
and construction management services.
Asheboro City Schools seeks to pursue the design‐build project delivery method to minimize cost
escalation risk, minimize change orders from existing conditions and decrease the overall project
schedule. These renovations will take place in an occupied building and must be planned, scheduled and
executed to allow operations to continue in the spaces affected. Asheboro City Schools believes the
collaboration provided by the design‐build model will provide the best end‐product for the students and
occupants of our spaces.
Asheboro City Schools intends qualify a vendor to keep on retainer as funding becomes available. Specific
design and construction management services costs will be negotiated at the start of each project.
Entity Name: Asheboro City Schools Board of Education
Project Title: District‐Wide School Renovations
Proposals shall be received until 10:00 a.m. EST on March 13, 2026. Questions regarding the scope of
services or other items related to this RFQ must be emailed directed to jvang@asheboro.k12.nc.us
(Jasmine Vang). Submissions received after the specified date and time will not be considered.
Proposing firms must submit TWO (2) copies of the qualification’s information package. In the interest
of cost‐savings to the Design‐Builders, consistency of the submittals and more efficient use of time by
the pre‐selection committee, the qualifications information package should not include any notebooks,
binders, tabs, clips, etc. The format should be 8‐1/2” x 11” pages stapled in the upper left‐hand corner.
The qualifications information package should not exceed forty (40) single‐sided pages or twenty (20)
double‐sided pages, not including cover. E‐mail and Fax submittals will not be accepted.
Submit TWO (2) copies of qualifications information package (Mailing Address): 1126 S. Park Street,
Asheboro, NC 27203.
Physical Location for FedEx/UPS delivery (Delivery Address): 1126 S. Park Street, Asheboro, NC 27203
NC Licensing Statement:
In order to offer CONSTRUCTION Services (General Contracting, Electrical Contracting, Plumbing, Heating
and Fire Sprinkler Contracting, or Landscape Contracting) and DESIGN Services (Architecture,
Engineering, or Landscape Architecture) as part of the response to this RFQ, the proposing firms must be
properly licensed to provide Construction Services and Design Services in the State of North Carolina. More
information on the North Carolina state boards may be found at the following websites:
CONSTRUCTION:
NC Licensing Board for General Contractors: (https://nclbgc.org)
NC State Board of Examiners of Electrical Contractors: (https://www.ncbeec.org)
NC State Board of Examiners of Plumbing, Heating and Fire Sprinkler Contractors:
(https://www.nclicensing.org)
NC Landscape Contractors’ Licensing Board:
(https://nclclb.com)
DESIGN:
NC Board of Architecture: (http://www.ncbarch.org)
NC Board of Examiners for Engineers and Surveyors: (http://www.ncbels.org) NC
Board of Landscape Architects: (http://www.ncbola.org)
2. SCHEDULE
RFQ Posted
Deadline for Written Questions
Posting of Answers as Addendum
RFQ Responses Due
Interviews (If Necessary)
Selection Expected to be Announced
February 27, 2026
March 6, 2026
March 9, 2027
March 13, 2027
To be scheduled week of March 16th, 2026
By April 16th, 2026
3. SCOPE OF SERVICES
Asheboro City Schools has performed facilities needs assessment to identify the highest‐need
infrastructure improvement projects across the district. These projects may include but are not limited
to complete HVAC renovations, cafeteria renovations, elevator replacements, and associated aesthetic
improvements in the school such as lighting upgrades, electrical service replacements, window
replacements, and any other needs identified by the district.
Some projects may be funded by a grants, and the design‐builder is expected to help the district
complete the grant applications. If Asheboro City Schools is unsuccessful in obtaining the grant, the
district reserves the right to not proceed with the project.
The design‐build team will provide turnkey architectural design, engineering design, contract
administration and construction services for this project. All aspects of the project from design through
completion are included in this scope of work.
4. CONTENT OF THE PROPOSAL
Asheboro City Schools requests that any firm desiring to be considered submit one (1) electronic copy of
the Statement of Qualifications (SOQ) by email to jvang@asheboro.k12.nc.us per this RFQ. The SOQ shall
contain the following:
1. Profile of each key firm on the team (design‐builder, contractor(s), designer(s), etc.).
Include firm history, ownership, description of services, location, staff size and record of
successfully completed projects without major legal or technical problems.
2. Resume of each key personnel represented on the team (design‐builder, contractor(s),
designer(s), etc.). Identify licenses (with numbers) and qualifications.
3. Examples of experience in each of these areas:
a. Projects with similar scope to proposed projects, successfully completed by team
members (firms and/or personnel)
b. Design‐Build projects successfully delivered by team members (firms and/or
personnel)
c. Collaboration between team members (firm and/or personnel)
4. Examples of recent experience with estimating project cost. Include examples of
designbuild projects with comparison between initial design‐build estimate and final cost.
Also, include the design fee percentage you are proposing to charge for this project and
examples of other design fees for similar projects your team has delivered in the past.
5. Examples of recent experience with adhering to project schedules. Include examples of
design‐build projects with comparison between initial schedule and final delivery date.
6. Understanding of the project location as exhibited by past experience in the geographic
area and/or with the client. Indicate team’s proximity to the Asheboro City Schools.
7. Quantifiable description of current workload and available resources to successfully
complete this project.
8. Description, with examples if applicable, of process for successfully delivering construction
projects. Address each phase of project (design, pre‐construction, and construction).
Include strategy for pre‐qualifying construction subcontractors and obtaining competitive
bidding; practices and procedures to ensure quality; and other factors that may be
applicable.
9. Certifications:
a. A letter, dated within the last 30 days, from your surety company, signed by their
Attorney in Fact, verifying their willingness to issue sufficient payment and performance
bonds for projects, on behalf of your firms or its agent licensed to do business in North
Carolina, and verifying your company’s capability and capacity based on your current
value of work. Surety company bond rated “A” or better under the A.M. Best Rating
system or The Federal Treasury List.
b. HUB Participation: Describe the program (plan) that your company has developed to
encourage participation by HUB firms to meet or exceed the goals set by Asheboro City
Schools. Please explain how the firm will address minority participation in the
management levels of the company. Include a HUB plan in the proposal. Provide
documentation of HUB participation that the firm achieved over the past three (3) years
on both public and private construction projects. Outline specific outreach efforts that
your firm will take to notify HUB firms of opportunities for participation. Indicate the
minority participation goal that you expect to achieve on the project.
c. Written certification by the design‐builder that each licensed design professional
included as part of the team was selected based solely on qualifications without regard
to fee. Include evidence that a qualifications‐based selection (QBS) process was utilized.
10. Additional information as requested by the Owner or deemed appropriate by the
DesignBuilder.
5. QUESTIONS PRE‐SUBMITTAL
All questions and clarifications must be submitted in writing or by e‐mail to jvang@asheboro.k12.nc.us
by end of day March 6,2026. All questions and answers shall be as an addendum to the original RFQ and
will be posted on our website.
ELECTION PROCESS
An Evaluation Team will consider the following criteria in evaluating proposals pursuant to Asheboro City
Schools Board Policy. These categories may not be weighted equally, but rather on importance and significance
to this project. The district will select the responding firm that is deemed most qualified and that the district
determines provides the greatest value for this project.
Evaluation Criteria
A Experience in delivering public sector design‐build projects
B Team qualifications and experience
C Past performance on similar projects.
D Project approach is clear and specific to design‐build
E Experience working with Asheboro City Schools
F Ability to self‐perform construction services.
G Any other factors the evaluation team deems relevant.
Total points to be earned
Maximum
Points
20
15
15
10
20
15
5
100