Design Build (DB) North Station Draw One Bridge Replacement and Associated Track & Signal Upgrades, Boston and Cambridge, MA

Agency: Massachusetts Bay Transportation Authority
State: Massachusetts
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237310 - Highway, Street, and Bridge Construction
  • 237990 - Other Heavy and Civil Engineering Construction
  • 238210 - Electrical Contractors and Other Wiring Installation Contractors
  • 541330 - Engineering Services
Posted Date: Jan 28, 2025
Due Date:
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Design Build (DB) North Station Draw One Bridge Replacement and Associated Track & Signal Upgrades, Boston and Cambridge, MAProject Description

MBTA Contract No. H32CN01

The purpose of the North Station Draw One Bridge Replacement and Associated Track & Signal Upgrades Project is to replace the Draw One Bridge, the Signal Tower A, and associated MBTA track and signal infrastructure. The existing Draw One Bridge consists of two adjacent two-track bridge spans crossing the Charles River. Signal Tower A is located just north of the Draw One Bridge, east of the tracks. Due to the deteriorated condition of the building, a temporary control tower was built in 2018. Conduits below grade connect the temporary control tower to equipment in the adjacent Signal Tower A.

Scope of Work:
The scope of work includes design and construction for:
Staged demolition of the existing draw bridges, approach spans, fendering, and Tower A.
New movable bridge structures carrying six tracks total, including replacement of the north and south trestles and fender system.
Trackwork and associated signals to connect the new bridge tracks to the mainline tracks north of Tower A and the existing station tracks, including reconstruction of direct fixation and platform modifications where required.
Track improvements extending out approximately 1.5 miles from North Station.
Raising and modifying the North Bank Bridge to accommodate the new track alignment.
A new Tower A building, positioned to best serve operation of the proposed new structure. Existing controls would be relocated from the temporary control tower to the new Tower A building.
Replacement of up to three sets of Signal Instrument Houses (SIHs) and upgrades for all wayside devices, cables, and infrastructure serving the existing Draw One Bridge.
New North Station Platform F will be constructed, tying into an existing partial platform, to serve new Station Tracks 11 and 12.
New drainage systems, including water quality structures and new outfalls, on each trestle.

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Bid Number Title Bid Notice Release Date Bid Package File Instructions Addendum Bid

City of Somerville

Bid Due: 8/12/2026

Description Opening Date/Time Closing Date/Time IFB # 27-08 CENTRAL FIRE STATION INTERIOR RENOVATIONS

City of Fall River

Bid Due: 8/13/2026

Lynbrook Road Water Main Rehabilitation Project The project includes the installation of approximately

Town of Southborough

Bid Due: 8/11/2026

Header Information Bid Number: BD-27-1141-BEVLY-BEVLY-131362 Description: Brimbal Avenue and Dunham Road at the

Commonwealth of Massachusetts

Bid Due: 8/12/2026