| Agency: | State Government of Florida |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Mar 6, 2025 |
| Due Date: | Mar 29, 2025 |
| Solicitation No: | RFP-11905 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Code | Description |
| 72151002 | Boiler installation and setup service |
| 72151005 | Boiler pressure controller installation |
| 72151006 | Boiler pressure controller maintenance or repair or operation |
| 72153208 | Insulation of pipes and boilers service |
| 72154500 | Heavy equipment installation and maintenance services |
| 81101600 | Mechanical engineering |
We are pleased to invite you to participate on Bid #C006790 Design-Build Boiler #3 Replacement-Phase 1 (Central Energy Plant). The following link is to our new bidding platform, hosted by PlanetBids™, where you can find the bid documents: BID LINK HERE.
The Central Florida Tourism Oversight District (CFTOD) seeks competitive proposals from ‘qualified’ design-build teams for the engineering, procurement and construction/installation of a standalone modular High Temperature Hot Water (HTHW) boiler plant, which includes, but is not limited to: boiler(s), pumps, controls, expansion tanks, chemical treatment and ancillary equipment. In addition to the installation of the modular HTHW boiler plant, a temporary HTHW boiler is to be installed as a backup to the current temporary steam boiler which was installed due to operational, and reliability concerns with the existing boiler #3 and backup Heat Recovery Steam Generator (HSRG) systems.
The addition of a temporary HTHW boiler #3 will return the system to N+1. The temporary boiler #3 shall be installed and available for operation by September 2025. The temporary boiler #3 will remain in service until the modular HTHW boiler plant system is available for operation. The modular HTHW boiler plant shall be installed and ready for operation by September 2026.
Both systems will be located at the District’s Central Energy Plant (CEP) 5300 Center Drive, Lake Buena Vista, Florida (the “Project”). Also, both systems will include but not limited to, major and minor piping and ancillary equipment, natural gas connections, plumbing systems, associated 480V, 120V, and low voltage electrical and controls systems and integration, concrete foundations and supports, structural steel work, painting, and insulation.
We look forward to your participation.
Please direct all questions to:| Description | Date/Time |
| C006790 MFMP Bid Flyer | Mar 7, 2025, 8:05:13 AM |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Bid Number: ITB 26-14 Bid Title: Asphalt Milling, Paving, Striping of Asphaltic Roads
City of Fernandina Beach
Bid Due: 7/30/2026
Bid Number: PC26-014 Bid Title: Project Storm Group I Category: Construction Services Status:
City of Panama City
Bid Due: 7/29/2026
Bid Number Description Due Date Documents T26-15 SW Plymouth Ave from Wilson Springs
Columbia County
Bid Due: 8/06/2026
Title DIPP- YATES PARKING GARAGE FULL INTERIOR PAINTING SERV. Solicitation Type ITQ Status
City of Jacksonville
Bid Due: 7/29/2026